Heading | 07/02/2025 | FIRE OH & HYDRO | STEPHEN SHUGART | APPROVED | OH & Hydro | 7/2/2025 10:35:56 AM
- Approved plans + permit on site
- Verify Hydro @ 210 psi on existing R3 with second floor addition, drain down to City operating pressure, no leaks and holding pressure
- Verify sprinkler locations per plans, hangers/spacing/bracing all per plans, attic/FAU sprig upright provided
- Okay to cover
- At final need As Build for farthest bedroom using on existing head instead of new head (update plans)
- If they provide roof access then they need to provide sprinkler coverage sprig upright (update plans)
|
|
|