Print Inspection Report

Date Time
12/15/2025
5:41 AM

Redwood City Inspection Requests

 
Permit Details
Permit No. B22-0256 Permit Type   SFR BUILDING Site Address   150 SOMERSET ST
REDWOOD CITY, CA 94062-1824
Applied   02/01/2022 Applicant   CCW Engineering Inc.
Approved   09/19/2022 Owner   Bo Liu, Zhi Wang
Issued   09/27/2022 Contractor   KAT CONSTRUCTION
Parent Permit No.   Description   1-story Addition: family room, library, & bathroom
  Notes   (2/1/2022 8:41 AM NC) 1st floor addition of 611 sf to the rear of the existing residence, to add a new family room, a library and a half bathroom. Additional 25 sf added to the ecisting garage. Kitchen remodel (affected area 113 sf) add new ac unit
 
Date of Inspection Inspection Type Inspector Result Remarks Notes

Heading 10/04/2022PRE-SITEHENRY CALILONGPERFORMEDAM Preferred 650 219 6634 On site visit, permit was already approved before site inspection, found no hazards or issues.

Heading 11/08/2022FORMS/FOOTINGHENRY CALILONGCORRECTIONS650-219-663411/8/2022 12:00:00 AM Steel and froms/ Abs / pier at additiion observed. Correction: provide SSW #3 ties per approved plans New Pier inspection under Existing home / crawl space inspection.

Heading 11/08/2022PIERS /CAISSONHENRY CALILONGCORRECTIONS11/8/2022 12:00:00 AM Correction: provide SSW #3 ties per approved plans New Pier inspection under Existing home / crawl space inspection.

Heading 02/12/2023ROOF NAILDAVID COOKS(AE) APPROVED W/EXCE650-219-66342/12/2023 12:00:00 AM Exception: Add nailing to v section of the roof where it insects the exsisting roof line - submit photos

Heading 02/12/2023ROUGH FRAMINGDAVID COOKSPARTIAL2/12/2023 12:00:00 AM Bottom cripple wall on the back side of the new addition - ok to complete shear

Heading 02/17/2023EXTERIOR SHEARDAVID COOKSCORRECTIONS650-219-66342/17/2023 12:00:00 AM Correction: Shear plate line All exterior shear panels should extend and be nsiled to the bottom seal plate line.

Heading 02/17/2023ROOF NAILDAVID COOKSAPPROVED

Heading 03/31/2023EXTERIOR LATH /WIREDAVID COOKSCORRECTIONS650-219-66344/3/2023 12:00:00 AM Corrections: 1.Go over all clinched staples and seal caulk 2. Caulk seal around all plumbing penetrations making sure wire lath does not touch the copper plumbing 3. caulk seall around all electrical outlet boxes

Heading 03/31/2023ROUGH ELECTRICDAVID COOKSAPPROVED

Heading 03/31/2023ROUGH FRAMINGDAVID COOKSCORRECTIONS4/3/2023 12:00:00 AM Corrections: 1. Recheck and add proper nailing to the sole plates per the shear wall schedule in the plans 2. Inner shear wall at the stairs - add shear sheathing, blocking, and carrier shear wall to the bottom of the roof sheathing

Heading 03/31/2023ROUGH MECHDAVID COOKSAPPROVED

Heading 03/31/2023ROUGH PLMGDAVID COOKSCORRECTIONS4/3/2023 12:00:00 AM Corrections: strap to support dwv plumbing midway between top and bottom wall plate

Heading 04/06/2023EXTERIOR LATH /WIRETINO PADILLAAPPROVEDManny 650-219-6634

Heading 04/06/2023ROUGH FRAMINGTINO PADILLAAPPROVED4/6/2023 12:00:00 AM Correction Notice corrected required by previous Building Inspector, ok by TP Interior Rough framing approved per TP ****Note need to inspect rough frame on exterior balcony deck***** per TP

Heading 04/06/2023ROUGH PLMGTINO PADILLAAPPROVED

Heading 04/12/2023INSULATIONDAVID COOKSCORRECTIONSManny 650-219-66344/18/2023 12:00:00 AM Correction: 1. Insulate area from basement under stairs 2. Insulate cripple wall area from basement to living space 3. fill in uninsulated gaps in ceiling and around elelctrical boxes 4. Foam to insulate around windows and doors.

Heading 04/18/2023INSULATIONTINO PADILLAAPPROVEDManny 650-219-6634

Heading 10/02/2023**FINAL BLDGDAVID COOKSAPPROVED650-219-6634

Heading 10/02/2023SMOKE AND CO ALARMSDAVID COOKS