| Heading | 10/04/2022 | PRE-SITE | HENRY CALILONG | PERFORMED | AM Preferred 650 219 6634 |
On site visit, permit was already approved before site inspection, found no hazards or issues.
|
|
| Heading | 11/08/2022 | FORMS/FOOTING | HENRY CALILONG | CORRECTIONS | 650-219-6634 | 11/8/2022 12:00:00 AM
Steel and froms/ Abs / pier at additiion observed.
Correction:
provide SSW #3 ties per approved plans
New Pier inspection under Existing home / crawl space inspection.
|
|
| Heading | 11/08/2022 | PIERS /CAISSON | HENRY CALILONG | CORRECTIONS | | 11/8/2022 12:00:00 AM
Correction:
provide SSW #3 ties per approved plans
New Pier inspection under Existing home / crawl space inspection.
|
|
| Heading | 02/12/2023 | ROOF NAIL | DAVID COOKS | (AE) APPROVED W/EXCE | 650-219-6634 | 2/12/2023 12:00:00 AM
Exception:
Add nailing to v section of the roof where it insects the exsisting roof line - submit photos
|
|
| Heading | 02/12/2023 | ROUGH FRAMING | DAVID COOKS | PARTIAL | | 2/12/2023 12:00:00 AM
Bottom cripple wall on the back side of the new addition - ok to complete shear
|
|
| Heading | 02/17/2023 | EXTERIOR SHEAR | DAVID COOKS | CORRECTIONS | 650-219-6634 | 2/17/2023 12:00:00 AM
Correction:
Shear plate line
All exterior shear panels should extend and be nsiled to the bottom seal plate line.
|
|
| Heading | 02/17/2023 | ROOF NAIL | DAVID COOKS | APPROVED | | |
|
| Heading | 03/31/2023 | EXTERIOR LATH /WIRE | DAVID COOKS | CORRECTIONS | 650-219-6634 | 4/3/2023 12:00:00 AM
Corrections:
1.Go over all clinched staples and seal caulk
2. Caulk seal around all plumbing penetrations making sure wire lath does not touch the copper plumbing
3. caulk seall around all electrical outlet boxes
|
|
| Heading | 03/31/2023 | ROUGH ELECTRIC | DAVID COOKS | APPROVED | | |
|
| Heading | 03/31/2023 | ROUGH FRAMING | DAVID COOKS | CORRECTIONS | | 4/3/2023 12:00:00 AM
Corrections:
1. Recheck and add proper nailing to the sole plates per the shear wall schedule in the plans
2. Inner shear wall at the stairs - add shear sheathing, blocking, and carrier shear wall to the bottom of the roof sheathing
|
|
| Heading | 03/31/2023 | ROUGH MECH | DAVID COOKS | APPROVED | | |
|
| Heading | 03/31/2023 | ROUGH PLMG | DAVID COOKS | CORRECTIONS | | 4/3/2023 12:00:00 AM
Corrections:
strap to support dwv plumbing midway between top and bottom wall plate
|
|
| Heading | 04/06/2023 | EXTERIOR LATH /WIRE | TINO PADILLA | APPROVED | Manny 650-219-6634 | |
|
| Heading | 04/06/2023 | ROUGH FRAMING | TINO PADILLA | APPROVED | | 4/6/2023 12:00:00 AM
Correction Notice corrected required by previous Building Inspector, ok by TP
Interior Rough framing approved per TP
****Note need to inspect rough frame on exterior balcony deck***** per TP
|
|
| Heading | 04/06/2023 | ROUGH PLMG | TINO PADILLA | APPROVED | | |
|
| Heading | 04/12/2023 | INSULATION | DAVID COOKS | CORRECTIONS | Manny 650-219-6634 | 4/18/2023 12:00:00 AM
Correction:
1. Insulate area from basement under stairs
2. Insulate cripple wall area from basement to living space
3. fill in uninsulated gaps in ceiling and around elelctrical boxes
4. Foam to insulate around windows and doors.
|
|
| Heading | 04/18/2023 | INSULATION | TINO PADILLA | APPROVED | Manny 650-219-6634 | |
|
| Heading | 10/02/2023 | **FINAL BLDG | DAVID COOKS | APPROVED | 650-219-6634 | |
|
| Heading | 10/02/2023 | SMOKE AND CO ALARMS | DAVID COOKS | | | |
|