| Heading | 09/11/2023 | U/G ELECTRIC | RYAN FERGUSON | PARTIAL | 650-722-1014 | 9/12/2023 7:19:46 AM
Partial u/g electric for temp power. Signed on plans
|
|
| Heading | 09/14/2023 | CONCRETE WALL | DAVID COOKS | APPROVED | | 9/15/2023 8:03:06 AM
6 columns above the mat footings - rebar inspection
|
|
| Heading | 09/14/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | 650-722-1014 | 9/15/2023 8:00:45 AM
5 plumbing runs with cleanouts - highlighted on the plans
|
|
| Heading | 09/19/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 9/11/2023 12:49:10 PM
9/11/2023 12:49 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: randy.shelden@truebeck.com
9/21/2023 5:02:11 PM
Underground conduit run stub-ups to the future electrical room
|
|
| Heading | 09/22/2023 | CONCRETE WALL | DAVID COOKS | APPROVED | | 9/22/2023 5:07:45 PM
Two shear walls - boundaries, walls and ties rebar placement and inspection
|
|
| Heading | 09/22/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | Miguel 650-722-1014 | 9/22/2023 5:04:40 PM
Plan layout
|
|
| Heading | 09/26/2023 | U/G ELECTRIC | NICK GONZALES | PARTIAL | 9 eTRAKiT Inspection Request | 9/11/2023 12:58:35 PM
9/11/2023 12:58 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: randy.shelden@truebeck.com
9/26/2023 4:20:19 PM
UG electrical before sand
As noted on the plans (Purple highlight)
|
|
| Heading | 09/26/2023 | U/G PLUMBING | NICK GONZALES | PARTIAL | | 9/26/2023 4:19:35 PM
UG sewer and Lab waste OK
As noted on the plans for highlight (Pink + Green)
|
|
| Heading | 09/28/2023 | U/G ELECTRIC | NICK GONZALES | PARTIAL | 11:30 eTRAKiT Inspection Request | 9/11/2023 12:59:56 PM
9/11/2023 12:59 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: randy.shelden@truebeck.com
9/28/2023 4:14:51 PM
Partial UG electrical run + caution tape
As noted on the plans
|
|
| Heading | 10/09/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | 650-730-9098 | 10/9/2023 2:13:04 AM
Area highlighted on plans
|
|
| Heading | 10/05/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | 650-730-9098 | |
|
| Heading | 10/09/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 9/26/2023 9:52:48 AM
9/26/2023 9:52 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 10/06/2023 | U/G PLUMBING | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 9/26/2023 9:58:38 AM
9/26/2023 9:58 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 10/10/2023 | CONCRETE WALL | JOE ROSSBACH | PARTIAL | | 10/10/2023 5:12:36 PM
Ramp wall gridline C from 8 to 12
Elevator walls first floor per RFI 88
Stair 1 walls first floor
Shear wall GL 21 fromA8 to C2
|
|
| Heading | 10/11/2023 | U/G PLUMBING | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 9/26/2023 9:59:50 AM
9/26/2023 9:59 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 10/11/2023 | U/F PLUMBING | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 10/3/2023 10:03:20 AM
10/3/2023 10:03 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
|
|
| Heading | 10/12/2023 | U/G ELECTRIC | DAVID COOKS | CANCELLED | Danny 650-730-9098 | |
|
| Heading | 10/12/2023 | U/G PLUMBING | DAVID COOKS | CANCELLED | eTRAKiT Inspection Request | 10/3/2023 2:52:10 PM
10/3/2023 2:52 PM TRUEBECK
Contact Name: Danny w/ TRUEBECK Cons.
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
|
|
| Heading | 10/13/2023 | U/F PLUMBING | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 9/26/2023 10:00:24 AM
9/26/2023 10:00 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 10/16/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 9/26/2023 10:01:02 AM
9/26/2023 10:01 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
10/16/2023 2:55:57 PM
Underground conduit run - exception = spread out a bundle of three conducts stacked on top of each other- submit photo before sand cover
|
|
| Heading | 10/17/2023 | U/G ELECTRIC | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 10/3/2023 2:56:22 PM
10/3/2023 2:56 PM TRUEBECK
Contact Name: Danny w/ TRUEBECK Cons.
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
|
|
| Heading | 10/18/2023 | U/F PLUMBING | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/10/2023 11:18:07 AM
10/10/2023 11:18 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
10/23/2023 12:02:21 AM
Plumbing rework complete
10/23/2023 12:03:02 AM
4" sewer line
|
|
| Heading | 10/18/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/3/2023 2:57:24 PM
10/3/2023 2:57 PM TRUEBECK
Contact Name: Danny w/ TRUEBECK Cons.
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
10/23/2023 12:04:12 AM
Backfill
|
|
| Heading | 10/19/2023 | U/G ELECTRIC | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 10/4/2023 7:10:15 AM
10/4/2023 7:10 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
|
|
| Heading | 10/19/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/10/2023 11:18:47 AM
10/10/2023 11:18 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 10/20/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/10/2023 9:43:01 AM
10/10/2023 9:43 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: 200twindolphin@truebeck.com
10/23/2023 12:12:33 AM
Lab waste and sewer - 5ft trench 1/4" per foot fall
|
|
| Heading | 10/23/2023 | U/G PLUMBING | NICK GONZALES | CANCELLED | eTRAKiT Inspection Request | 10/10/2023 11:20:09 AM
10/10/2023 11:20 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 10/23/2023 | U/G ELECTRIC | NICK GONZALES | PARTIAL | 9 eTRAKiT Inspection Request | 10/10/2023 9:45:29 AM
10/10/2023 9:45 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: 200twindolphin@truebeck.com
10/23/2023 2:43:30 PM
partial caution tape and sand at noted areas on the plans
(highlighted and marked)
|
|
| Heading | 10/24/2023 | U/G ELECTRIC | THOMAS SILIPIN JR | PARTIAL | eTRAKiT Inspection Request | 10/4/2023 7:12:43 AM
10/4/2023 7:12 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
10/24/2023 3:53:57 PM
40 foot run of electrical conduit. okay to cover
|
|
| Heading | 10/24/2023 | U/G PLUMBING | THOMAS SILIPIN JR | NOT READY | eTRAKiT Inspection Request | 10/4/2023 7:16:11 AM
10/4/2023 7:16 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
10/24/2023 3:46:05 PM
Small section of conduit okay to cover. 40' of pipe.
|
|
| Heading | 10/25/2023 | U/G ELECTRIC | NICK GONZALES | PARTIAL | eTRAKiT Inspection Request | 10/16/2023 8:45:48 AM
10/16/2023 8:45 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: 200twindolphin@truebeck.com
10/25/2023 4:49:37 PM
UG electrical conduit at yellow area OK per uploaded sheet
As noted on the plans
|
|
| Heading | 10/25/2023 | U/G PLUMBING | NICK GONZALES | PARTIAL | eTRAKiT Inspection Request | 10/4/2023 7:20:21 AM
10/4/2023 7:20 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: 200twindolphin@truebeck.com
10/25/2023 4:50:16 PM
UG lab waste, sewer, and venting
As noted on the plans (highlighted)
|
|
| Heading | 10/26/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/16/2023 8:49:58 AM
10/16/2023 8:49 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: 200twindolphin@truebeck.com
10/27/2023 4:27:43 PM
Unground conduit run
|
|
| Heading | 10/26/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/4/2023 7:21:28 AM
10/4/2023 7:21 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
10/27/2023 4:29:03 PM
Underground drain and sewer line - tested ok to sand fill
|
|
| Heading | 10/27/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/10/2023 11:17:19 AM
10/10/2023 11:17 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
10/27/2023 4:25:51 PM
underground 3" and 2" electrical conduit run - partial ok to backfill with sand
|
|
| Heading | 10/27/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/16/2023 8:51:42 AM
10/16/2023 8:51 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: 200twindolphin@truebeck.com
10/27/2023 3:51:08 PM
Appx. 200 ft buried drain line - tested and approved
|
|
| Heading | 10/30/2023 | FORMS/FOOTING | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 10/10/2023 11:22:10 AM
10/10/2023 11:22 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
10/30/2023 2:04:46 PM
Added 30 x 36" grade beam per grade beam SSK-2 for added crane support - steel reinforcement inspection
|
|
| Heading | 10/31/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/4/2023 7:32:10 AM
10/4/2023 7:32 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 650730
e-Mail: 200twindolphin@truebeck.com
11/2/2023 4:45:40 PM
underground conduit run
|
|
| Heading | 10/31/2023 | SLAB | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 10/10/2023 11:23:12 AM
10/10/2023 11:23 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 11/01/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/10/2023 11:23:50 AM
10/10/2023 11:23 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
11/2/2023 4:54:40 PM
Underground conduit run - sand fill and warning ribbon
|
|
| Heading | 11/01/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/4/2023 7:34:49 AM
10/4/2023 7:34 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
11/2/2023 4:50:23 PM
Under parking garage plumbing run
|
|
| Heading | 11/02/2023 | U/G ELECTRIC | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 10/4/2023 7:37:20 AM
10/4/2023 7:37 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 11/02/2023 | SLAB | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 10/10/2023 11:24:21 AM
10/10/2023 11:24 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 11/06/2023 | U/G ELECTRIC | NICK GONZALES | PARTIAL | | 11/7/2023 7:17:46 AM
UG conduit and caution tape verified at rear end of the building and highlighted on the plan sheet for the referenced areas
|
|
| Heading | 11/07/2023 | SLAB | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/4/2023 7:39:07 AM
10/4/2023 7:39 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
11/9/2023 12:23:52 AM
Slab on grade Pour 1
|
|
| Heading | 11/08/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/4/2023 7:41:06 AM
10/4/2023 7:41 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
11/9/2023 12:30:41 AM
underground conduit run plus partial trench sand fill with warning ribbon
|
|
| Heading | 11/08/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | | 11/9/2023 12:37:33 AM
3 inch drain line and 2" vent plus potable water line
|
|
| Heading | 11/08/2023 | SLAB | DAVID COOKS | APPROVED | | 11/9/2023 12:34:11 AM
Pour 1 steel rebar inspection complete EOR submitted and special inspector report
|
|
| Heading | 11/09/2023 | FORMS/FOOTING | NICK GONZALES | PARTIAL | 10 eTRAKiT Inspection Request | 10/4/2023 7:43:46 AM
10/4/2023 7:43 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
11/9/2023 4:17:50 PM
Mat slab on grade on green highlighted portion of main building OK
As noted on the plans
|
|
| Heading | 11/09/2023 | UFER | NICK GONZALES | PARTIAL | | 11/9/2023 4:16:36 PM
UFER at main building OK for underslab
(verification of rods and threaded grounding conductor)
|
|
| Heading | 11/13/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/23/2023 12:21:54 PM
10/23/2023 12:21 PM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
11/13/2023 1:47:47 PM
On grade conduit run - 6” gravel & 6” slab overlay
|
|
| Heading | 11/13/2023 | U/G PLUMBING | DAVID COOKS | PARTIAL | | 11/13/2023 1:52:22 PM
Liter drains 3 lines water tested
|
|
| Heading | 11/14/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/4/2023 7:53:50 AM
10/4/2023 7:53 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
11/14/2023 4:42:45 PM
South end of ramp - unground electrical conduit run - highlighted on plans
|
|
| Heading | 11/14/2023 | SLAB | DAVID COOKS | NOT READY | Danny 650-730-9098 | |
|
| Heading | 11/15/2023 | U/G ELECTRIC | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 10/4/2023 7:53:51 AM
10/4/2023 7:53 AM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
11/17/2023 4:53:31 PM
Partial Generator room underground conduit run
|
|
| Heading | 11/16/2023 | FORMS/FOOTING | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 11/1/2023 8:46:53 AM
11/1/2023 8:46 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
11/17/2023 4:48:02 PM
3 columns in footing with 10#9 vertical rebar #3 rebar stirrups @ 4" oc
|
|
| Heading | 11/17/2023 | U/G ELECTRIC | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 10/23/2023 12:23:35 PM
10/23/2023 12:23 PM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
|
|
| Heading | 11/17/2023 | SLAB | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 11/7/2023 9:00:15 AM
11/7/2023 9:00 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
|
|
| Heading | 11/20/2023 | U/F PLUMBING | NICK GONZALES | CANCELLED | eTRAKiT Inspection Request | 10/23/2023 12:27:14 PM
10/23/2023 12:27 PM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: Randy.Shelden@truebeck.com
11/20/2023 8:10:31 AM
spoke with super intendant and he cancelled the inspection
|
|
| Heading | 11/21/2023 | FORMS/FOOTING | NICK GONZALES | NOT READY | 10 eTRAKiT Inspection Request | 10/23/2023 12:30:15 PM
10/23/2023 12:30 PM TRUEBECK
Contact Name: Danny W/ Truebeck
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: Randy.Shelden@truebeck.com
11/21/2023 4:57:55 PM
In-progress inspection completed at main building slab
- water proofing at columns still needed
- provide insulation wrap around plumbing fixtures
- pending forms at thickened edge with vertical dowels at rear and perimeter walls
|
|
| Heading | 11/22/2023 | FORMS/FOOTING | FERNANDO ROMERO | PARTIAL | eTRAKiT Inspection Request | 10/23/2023 12:31:31 PM
10/23/2023 12:31 PM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: Randy.Shelden@truebeck.com
11/22/2023 4:26:39 PM
Observed rebar mat for garage. Received letter of observation by EOR, report by special inspector is pending. See notes on page SC-2.1
|
|
| Heading | 11/28/2023 | FORMS/FOOTING | NICK GONZALES | PARTIAL | 9 eTRAKiT Inspection Request | 10/23/2023 12:35:23 PM
10/23/2023 12:35 PM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
11/29/2023 7:11:15 AM
PT slab for ramp at parking garage for pour 2
pending installation of slip dowels at C11.5 at PT slab tie in/break
|
|
| Heading | 11/29/2023 | FORMS/FOOTING | TINO PADILLA | PARTIAL | eTRAKiT Inspection Request | 10/23/2023 12:37:07 PM
10/23/2023 12:37 PM TRUEBECK
Contact Name: Danny w/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
11/29/2023 4:21:54 PM
Partial slab was noted on plans at the job site.
|
|
| Heading | 11/30/2023 | SLAB | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 11/1/2023 8:51:15 AM
11/1/2023 8:51 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
12/1/2023 4:18:10 PM
Level 2 PT slab region enclosed by grids A, C, 7 & 11.3
|
|
| Heading | 12/01/2023 | U/G PLUMBING | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 11/16/2023 8:33:33 AM
11/16/2023 8:33 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 12/04/2023 | U/G PLUMBING | NICK GONZALES | CANCELLED | eTRAKiT Inspection Request | 10/10/2023 11:00:04 AM
10/10/2023 11:00 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: 200twindolphin@truebeck.com
|
|
| Heading | 12/04/2023 | SLAB | NICK GONZALES | CANCELLED | eTRAKiT Inspection Request | 11/16/2023 8:43:43 AM
11/16/2023 8:43 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.ragel@truebeck.com
|
|
| Heading | 12/05/2023 | CONCRETE WALL | DAVID COOKS | CORRECTIONS | 650-730-9098 | 12/7/2023 3:10:30 PM
Corrections:
perimeter Columns Grid line A - F - in need of steel adjustments at the stirrup's ties and cleaning
|
|
| Heading | 12/06/2023 | CONCRETE WALL | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 10/5/2023 9:21:34 AM
10/5/2023 9:21 AM TRUEBECK
Contact Name: Danny W/ TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: jose.hernandez@truebeck.com
12/7/2023 3:19:03 PM
Shear wall on 9 line and perimeter columns grid line A - 7 steel rebar inspection.
|
|
| Heading | 12/07/2023 | U/G PLUMBING | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 11/1/2023 8:55:56 AM
11/1/2023 8:55 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
|
|
| Heading | 12/08/2023 | SLAB | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 11/16/2023 8:48:04 AM
11/16/2023 8:48 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 12/11/2023 | ROUGH FRAMING | NICK GONZALES | CANCELLED | eTRAKiT Inspection Request | 11/16/2023 8:48:04 AM
11/16/2023 8:48 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 12/12/2023 | U/G ELECTRIC | DAVID COOKS | CANCELLED | eTRAKiT Inspection Request | 11/1/2023 8:57:15 AM
11/1/2023 8:57 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
|
|
| Heading | 01/03/2024 | U/G ELECTRIC | NICK GONZALES | CORRECTIONS | 1 eTRAKiT Inspection Request | 12/11/2023 9:45:39 AM
12/11/2023 9:45 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
1/3/2024 3:51:04 PM
- Grid line 19 to 21 PT slab ramp UF conduit shall have clearance from rebar/pt cables
|
|
| Heading | 01/08/2024 | CONCRETE WALL | DAVID COOKS | APPROVED | | 1/8/2024 3:20:43 PM
Columns - steel rebar inspection - C line 13 c- 20 C3 columns
D line 21 & 18 C1 columns
|
|
| Heading | 01/09/2024 | CONCRETE WALL | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 12/11/2023 9:55:45 AM
12/11/2023 9:55 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
1/9/2024 4:33:45 PM
4 - C1 columns rebar inspection
|
|
| Heading | 01/11/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | 9 eTRAKiT Inspection Request | 12/11/2023 9:59:59 AM
12/11/2023 9:59 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
1/12/2024 7:41:24 AM
Observed placement of reinforcing steel and PT cables
for Two post-tension deck at 1-11.4/A-D. Work complete. Reference detail SC6.2 and SC7.1. Level two pour two complete
1-11.4/A-D also elevator wall on C.6 between 20 and 20, complete.
|
|
| Heading | 01/17/2024 | DAILY INSPECTION | NICK GONZALES | CANCELLED | 9:30 eTRAKiT Inspection Request | 12/11/2023 10:28:05 AM
12/11/2023 10:28 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 01/18/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | 9 eTRAKiT Inspection Request | 12/11/2023 10:33:07 AM
12/11/2023 10:33 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
1/19/2024 7:15:34 AM
Shear wall steel reinforcement and steel reinforcement columns OK
see attached reports from special in attachments
|
|
| Heading | 01/19/2024 | SLAB | NICK GONZALES | PARTIAL | 10:30 eTRAKiT Inspection Request | 12/11/2023 10:36:04 AM
12/11/2023 10:36 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
1/22/2024 8:07:31 AM
Observed placement of reinforcing steel for Level two
wall(s) at line 1 thru 2 between C.8 and D. Work complete. Reference detail SC4.1, SC6.1F. Garage level two walls on 1 thru
2 near D.
|
|
| Heading | 01/22/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 12/11/2023 10:37:44 AM
12/11/2023 10:37 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
1/22/2024 11:49:19 AM
Level 3 ramp - 2 -c1 columns 10 number 8 rebar with ties @ 4” oc
|
|
| Heading | 01/25/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 12/11/2023 10:39:46 AM
12/11/2023 10:39 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 01/25/2024 | SLAB | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 12/11/2023 10:49:30 AM
12/11/2023 10:49 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: Randy.Shelden@truebeck.com
|
|
| Heading | 01/26/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 12/11/2023 10:53:13 AM
12/11/2023 10:53 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 01/30/2024 | SLAB | DAVID COOKS | CANCELLED | eTRAKiT Inspection Request | 1/19/2024 1:49:01 PM
1/19/2024 1:49 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 02/01/2024 | SLAB | DAVID COOKS | PARTIAL | Miguel 650-730-9061 *fees due* | 2/2/2024 9:11:08 AM
Level 2 pan deck rebar placement - work in progress
|
|
| Heading | 02/07/2024 | SLAB | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 1/25/2024 8:58:25 AM
1/25/2024 8:58 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
2/7/2024 4:54:21 PM
Level 3 pan deck - steel trim missing at south corner - after addition of trim slab is ok to concrete pour.
Submit photo
|
|
| Heading | 02/08/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 1/25/2024 8:59:57 AM
1/25/2024 8:59 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 02/09/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 1/31/2024 9:04:58 AM
1/31/2024 9:04 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 02/12/2024 | DAILY INSPECTION | NICK GONZALES | CANCELLED | eTRAKiT Inspection Request | 1/30/2024 11:11:34 AM
1/30/2024 11:11 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
|
|
| Heading | 02/14/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 1/30/2024 11:13:27 AM
1/30/2024 11:13 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
|
|
| Heading | 02/14/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 1/30/2024 11:15:06 AM
1/30/2024 11:15 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
2/15/2024 8:04:58 AM
Partial slab - work in progress perimeter rebar steel to be tied and supported.
|
|
| Heading | 02/15/2024 | DAILY INSPECTION | DAVID COOKS | (AE) APPROVED W/EXCE | eTRAKiT Inspection Request | 1/30/2024 11:17:02 AM
1/30/2024 11:17 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
2/16/2024 8:30:56 AM
Pan Deck rebar inspection - Level 4
Exception:
Rebar ties needed around elevator shaft edges to lift off deck before concrete fill.
Submit photo
|
|
| Heading | 02/16/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 1/30/2024 11:18:22 AM
1/30/2024 11:18 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
|
|
| Heading | 02/20/2024 | DAILY INSPECTION | DAVID COOKS | NO ACCESS | eTRAKiT Inspection Request | 1/25/2024 9:01:48 AM
1/25/2024 9:01 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 02/21/2024 | SLAB | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 1/25/2024 9:03:09 AM
1/25/2024 9:03 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
2/21/2024 4:34:13 PM
Level 2 pour 2 pan deck south half - steel rebar inspection
|
|
| Heading | 02/22/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 1/25/2024 9:05:03 AM
1/25/2024 9:05 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 02/23/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 1/25/2024 9:06:04 AM
1/25/2024 9:06 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
2/23/2024 3:58:07 PM
Rebar dowelling for Block outs fill in the column containment areas - Corrections: 5 areas need adjustment and ties in the steel rebar dowel arraignment.
|
|
| Heading | 02/26/2024 | DAILY INSPECTION | NICK GONZALES | CANCELLED | eTRAKiT Inspection Request | 1/25/2024 9:07:37 AM
1/25/2024 9:07 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 03/01/2024 | SLAB | NICK GONZALES | PARTIAL | 8:30 Miguel 650-730-9061 *fees due* | 3/4/2024 7:20:00 AM
- Steel fluted deck with slab rebar + pins at east end to interior stair well OK
pending SEOR observation letter
|
|
| Heading | 03/04/2024 | ROUGH FRAMING | DAVID COOKS | PARTIAL | Miguel 650-730-9061 | 3/6/2024 4:39:14 PM
ventilator Shaft layout framing before fire rate spray foam (mono coat)
|
|
| Heading | 03/05/2024 | SLAB | DAVID COOKS | CORRECTIONS | Miguel 650-730-9061 | 3/6/2024 4:42:33 PM
Corrections:
1. Diagonal steel at opening missing
2. trim bar at west end broke loose from weld
3. rebar laying on steel at the stair openings.
|
|
| Heading | 03/06/2024 | SLAB | DAVID COOKS | APPROVED | Miguel 650-730-9061 | 11/16/2023 8:37:59 AM
11/16/2023 8:37 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
3/6/2024 4:44:02 PM
Corrections made pour 2 south end pan deck slab ok to pour
|
|
| Heading | 03/07/2024 | ROUGH FRAMING | DAVID COOKS | PARTIAL | Marco 650-769-9303 | 2/28/2024 10:54:58 AM
In wall framing?
3/8/2024 8:36:14 AM
Wall framing retaining clips installed at the ceiling around the stair and ventilation shafts - before mona coat spray foam application. level 1
|
|
| Heading | 03/08/2024 | DAILY INSPECTION | DAVID COOKS | (AE) APPROVED W/EXCE | eTRAKiT Inspection Request | 2/28/2024 10:39:48 AM
2/28/2024 10:39 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/8/2024 4:50:24 PM
Level 5 pour 1 deck rebar inspection and Level 1 column infield rebar inspection 8 areas total
Exception:
1. Add rebar between stair above beam as pointed out during inspections
2. Pump out all water in the column base areas before concrete fill.
Will check corrected areas during next inspection
|
|
| Heading | 03/11/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | eTRAKiT Inspection Request | 2/28/2024 10:44:29 AM
2/28/2024 10:44 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/12/2024 6:57:11 AM
- Clip attachment for level 1 restrooms to fluted deck requires RFI to give clarification on top metal framed track attachment (fire rating for deflection opening and screws)
|
|
| Heading | 03/12/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 2/28/2024 10:45:30 AM
2/28/2024 10:45 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: cory.keller@truebeck.com
|
|
| Heading | 03/13/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 2/28/2024 10:46:41 AM
2/28/2024 10:46 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/13/2024 4:46:27 PM
Level 5 pan deck work in progress inspection
3/13/2024 4:46:56 PM
Pour 2
|
|
| Heading | 03/14/2024 | SLAB | DAVID COOKS | (AE) APPROVED W/EXCE | eTRAKiT Inspection Request | 2/28/2024 10:48:51 AM
2/28/2024 10:48 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/14/2024 4:29:33 PM
Pan deck steel rebar inspection Level 5 pour 2
Exception:
Deck Clearance - cleaning
Clean deck provide video of debris removal in progress
|
|
| Heading | 03/15/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 2/28/2024 10:50:46 AM
2/28/2024 10:50 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/18/2024 9:20:23 AM
Rebar inspection - Level 5 roof deck work in progress
|
|
| Heading | 03/18/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 2/28/2024 11:02:21 AM
2/28/2024 11:02 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/18/2024 2:57:17 PM
Roof Deck Level 6 pour 1 - rebar placement and sizing - ok to pour
|
|
| Heading | 03/19/2024 | DAILY INSPECTION | DAVID COOKS | CORRECTIONS | eTRAKiT Inspection Request | 2/28/2024 11:03:21 AM
2/28/2024 11:03 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/21/2024 8:11:11 AM
Level 3 framing clips overhead before mono-coat spray - missing clips over stair vertical framing
|
|
| Heading | 03/20/2024 | DAILY INSPECTION | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 2/28/2024 11:04:11 AM
2/28/2024 11:04 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/21/2024 8:13:13 AM
Level 3 overhead framing clips installed before mono-coat spray - ok to spray.
|
|
| Heading | 03/21/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 2/28/2024 11:06:57 AM
2/28/2024 11:06 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 03/22/2024 | DAILY INSPECTION | THOMAS SILIPIN JR | APPROVED | eTRAKiT Inspection Request | 2/28/2024 11:07:59 AM
2/28/2024 11:07 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/22/2024 10:28:06 AM
column inspection grid lines 12,13,14,18,19,21 on grid line D
|
|
| Heading | 03/25/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 8:47:25 AM
3/1/2024 8:47 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/27/2024 7:46:48 AM
- Steel structure level 5 fluted deck slab rebar, pads, penetrations, openings verified
Special inspection report provided and SEOR observation letter provided
|
|
| Heading | 03/26/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 3/1/2024 8:51:01 AM
3/1/2024 8:51 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: cory.keller@truebeck.com
|
|
| Heading | 03/27/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 8:52:44 AM
3/1/2024 8:52 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/29/2024 4:50:26 PM
Elevator and shaft core board wall framing - Level 1
|
|
| Heading | 03/28/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 3/1/2024 8:55:40 AM
3/1/2024 8:55 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 03/29/2024 | FIRE RESISTIVE CONST | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 3/1/2024 8:57:03 AM
3/1/2024 8:57 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/29/2024 4:41:45 PM
Shaft and elevator core wall installation and fire caulking - Level 1
|
|
| Heading | 04/01/2024 | INSULATION | DAVID COOKS | PARTIAL - VIRTUAL | | 4/1/2024 3:04:42 PM
Elevator core board shaft walls Level 2 ok to drywall
|
|
| Heading | 04/01/2024 | DAILY INSPECTION | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 3/1/2024 9:00:18 AM
3/1/2024 9:00 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/1/2024 3:00:12 PM
DX2 liquid hot gas rated @ 300 psi tested @ 500psi and heating hot line test rated @ 70 psi tested @ 100 pse
|
|
| Heading | 04/02/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 9:19:29 AM
3/1/2024 9:19 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/2/2024 4:32:06 PM
Inspection:
Roof Level 5 - 3 MECHANICAL PLATFORMS
4/2/2024 4:42:39 PM
2nd Floor - two shaft walls and fire caulking
1st floor - shaft wall drywall 1st layer
|
|
| Heading | 04/03/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 9:21:56 AM
3/1/2024 9:21 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/4/2024 9:04:38 AM
Level 1 Frame inspection for Top out drywall installation
2nd layer shaft wall drywall screw inspection
|
|
| Heading | 04/03/2024 | SLAB | DAVID COOKS | CORRECTIONS | | 4/4/2024 9:12:06 AM
Corrections:
Level 5 roof - equipment platforms - rebar spacing and cleaning loose concrete slag
|
|
| Heading | 04/04/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 9:23:45 AM
3/1/2024 9:23 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/5/2024 4:09:17 PM
Level 3 shaft liner inspection, Level 1 top out screw inspection plus first layer drywall, and Rough Frame inspection for top out one side
|
|
| Heading | 04/05/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 9:25:18 AM
3/1/2024 9:25 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/5/2024 4:14:24 PM
Level 3, 2nd layer top out, Level 5 clips and tracks prior to mono coat application, and Roof Deck 6 equipment platforms ok to concrete fill
|
|
| Heading | 04/08/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 9:26:30 AM
3/1/2024 9:26 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/8/2024 3:41:57 PM
- In-progress inspection for curbs/raised curbs at level 5
Work was not fully completed at the time of inspection
clarification needed if U-bars are required at each inbed
|
|
| Heading | 04/09/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 9:28:32 AM
3/1/2024 9:28 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/9/2024 2:51:28 PM
- Rooftop perimeter curb/curb walls forms, U-bar, embedment's, and steel OK
As noted on the plans (green dotted highlights)
|
|
| Heading | 04/10/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | 9 eTRAKiT Inspection Request | 3/1/2024 9:29:40 AM
3/1/2024 9:29 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/12/2024 7:03:22 AM
Mon- Looked at curbs at roof of building - Partial at perimeter
Tues- Curbs at roof around penthouse, shaft liner at level 3 and top out drywall at level 1 – Passed
- CMU at level 1 Main electrical room in progress inspection
Wed- Insulation at level 3 shaft wall (confirmed caulking complete), top out framing at level 2 and stair shaft wall liner ok to insulate – Passed
See attached reports for highlighted sections
|
|
| Heading | 04/11/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 9:31:36 AM
3/1/2024 9:31 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/12/2024 8:28:11 AM
Inspections:
Level 4 - Shaft wall liner / caulking
Level 3 - 1st layer shaft wall sheetrock
Level 2 - Stair 1 shaft liner / fire caulking
Level 1 - insulation at shaft wall in electrical room
|
|
| Heading | 04/12/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 3/1/2024 9:33:19 AM
3/1/2024 9:33 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/12/2024 4:52:17 PM
3rd floor 2nd layer drywall inspection - elevator shaft
Level 1 shaft core board and fire caulking inspection
|
|
| Heading | 04/15/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL - VIRTUAL | eTRAKiT Inspection Request | 3/28/2024 9:43:05 AM
3/28/2024 9:43 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
4/15/2024 3:05:47 PM
It’s layer drywall in the electrical and equipment room
|
|
| Heading | 04/17/2024 | OTHER | DAVID COOKS | PARTIAL | | 4/25/2024 7:48:04 AM
Drywall and core-board inspection
Level 1 - 2nd layer drywall electrical room
Level 3 - elevator shaft 2nd layer drywall
|
|
| Heading | 04/18/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | | 4/25/2024 8:03:11 AM
Level 4 - insulation in the stair shaft and 2nd layer drywall North Shaft
Level 3 - Framing in bath rooms - insulation in stair 1 walls
Level 2 - Framing in electrical room North wall - Fire Caulk in the shaft coreboard wall
|
|
| Heading | 04/19/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | | 4/25/2024 4:10:42 PM
Level 4 Framing and insulation at elevator shaft
Level 2 Core Board Stair 1, Top out drywall placement in the corridor,
Level 1 - First layer drywall in South Corridor, stair landing and North Wall
|
|
| Heading | 04/22/2024 | FORMS/FOOTING | NICK GONZALES | PARTIAL | | 4/24/2024 7:07:41 AM
- Steel placement for base level architectural curb (#5) on east side elevation OK
highlighted on the plan sheet for reference area
|
|
| Heading | 04/23/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | | 4/25/2024 4:16:45 PM
Level 1 North Wall electrical room - 1st and 2nd layer drywall, Lobby 2nd layer top out and 1st layer drywall in the West lobby
Level 2 Fire Riser Room top out and 1st layer North Wall
Level 3 1st layer West Corridor and Framing in the data riser room
Level 4 West corridor top out framing
|
|
| Heading | 04/24/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | | 4/25/2024 4:21:43 PM
Level 3 and 4 - 2nd layer drywall in stair 1, and fire caulk in stair shafts
Level 2 - 2nd layer drywall
|
|
| Heading | 04/25/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | | 4/25/2024 4:27:19 PM
Level 4 top out 1st layer east corridor and Fire Caulk stair 1 shaft
Level 2 2nd layer in the electrical room and fire caulk in stair 1
Level 1 North walls 2nd layer
|
|
| Heading | 04/29/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 4/21/2024 10:12:16 PM
4/21/2024 10:12 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 04/30/2024 | ROUGH MECH | DAVID COOKS | CORRECTIONS | | 5/1/2024 4:38:17 PM
Level 1 HVAC hot water test set @ 100 psi - reading was @ 80 psi - Air fill to 100 and retest 24hrs.
|
|
| Heading | 05/01/2024 | ROUGH MECH | DAVID COOKS | APPROVED | | 5/1/2024 4:40:21 PM
HVAC hot potable line run and pressure test @ 100 psi - Levels 1 to roof and level 2 to 5 tested ok
|
|
| Heading | 05/01/2024 | SHEETROCK | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/23/2024 9:42:44 PM
4/23/2024 9:42 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/1/2024 4:30:32 PM
Level 1 east corridor elevator control room 1st and 2nd layer drywall
Level 1-3 Restroom east wall first layer
Level 5 shaft fire caulk at restroom and east wall
|
|
| Heading | 05/02/2024 | SLAB | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 4/23/2024 9:46:37 PM
4/23/2024 9:46 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/2/2024 4:50:59 PM
Front and back walkway and ramp slab steel rebar inspection
|
|
| Heading | 05/03/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/23/2024 9:52:39 PM
4/23/2024 9:52 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/6/2024 12:42:24 AM
Level 1second layer drywall in electrical room and level 2 first layer shaft, and top out frame inspection
|
|
| Heading | 05/06/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | 9:30 eTRAKiT Inspection Request | 4/23/2024 9:54:26 PM
4/23/2024 9:54 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/6/2024 1:18:30 PM
- Level 4 drywall, screws, and caulking at stair wells (1st layer)
- Mat slab for sump in between parking and warm shell (#4 16" o.c)
|
|
| Heading | 05/07/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/23/2024 9:55:51 PM
4/23/2024 9:55 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/10/2024 4:39:44 PM
L5 building framing of the east corridor and bathrooms
|
|
| Heading | 05/08/2024 | U/G PLUMBING | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/23/2024 9:57:23 PM
4/23/2024 9:57 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/10/2024 4:43:28 PM
Storm drains line run and connections - 20' x 8", 26' x 10" and 22' x 4" with stub-ups
|
|
| Heading | 05/09/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/23/2024 9:58:37 PM
4/23/2024 9:58 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/10/2024 4:32:23 PM
Level 5 shaft framing and Level 1 top out drywall
|
|
| Heading | 05/10/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/23/2024 10:02:21 PM
4/23/2024 10:02 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/10/2024 4:34:29 PM
Level 5 AF-105 east elevator shaft 1st layer drywall screw inspection and insulation
|
|
| Heading | 05/13/2024 | SHEETROCK | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/23/2024 10:03:49 PM
4/23/2024 10:03 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/13/2024 2:13:02 PM
Roof Deck - Shaft - drywall first layer and insulation
Level 5 - top out around all gender restrooms
Level 4 - Electrical room 2nd layer
|
|
| Heading | 05/14/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/23/2024 10:04:44 PM
4/23/2024 10:04 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/14/2024 4:39:43 PM
Top roof deck - rail assembly - south end
|
|
| Heading | 05/14/2024 | ROUGH FRAMING | DAVID COOKS | CORRECTIONS-VIRTUAL | | 5/14/2024 4:35:53 PM
Corrections:
Roof deck railing assemble - screws missing in studs and bottom wall plate assembly.
|
|
| Heading | 05/15/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 9:34:54 PM
4/28/2024 9:34 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/16/2024 4:54:09 PM
Roof parapet wall framing - and roof elevator framing
|
|
| Heading | 05/16/2024 | GAS PIPING | DAVID COOKS | CORRECTIONS | | 5/16/2024 5:08:00 PM
Gas line from level on to roof
Corrections:
Add two hanger where needed at 90 degree turn and one side of a gas line splice point.
|
|
| Heading | 05/16/2024 | GAS TEST | DAVID COOKS | APPROVED | | 5/16/2024 5:09:26 PM
Large 4' gas line test @ 70Psi for 24 hrs. running from level one to roof deck
|
|
| Heading | 05/16/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 9:37:03 PM
4/28/2024 9:37 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/16/2024 5:02:44 PM
Roof deck parapet wall framing
|
|
| Heading | 05/17/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 9:39:34 PM
4/28/2024 9:39 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/17/2024 4:06:20 PM
Roof level framing inspection around the penthouse and bottom rip of Densglass around the parapet to allow waterproofing to begin
|
|
| Heading | 05/20/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | 9 eTRAKiT Inspection Request | 4/28/2024 9:40:30 PM
4/28/2024 9:40 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/21/2024 6:52:57 AM
- Partial in-wall insulation at level 1 security room OK
Highlighted and noted on the plans for reference
|
|
| Heading | 05/21/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | 9 eTRAKiT Inspection Request | 4/28/2024 9:41:30 PM
4/28/2024 9:41 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/22/2024 3:11:30 PM
- Shaft liner + fire caulking at top level shaft walls OK
- Screw inspection/sheetrock at security room level 1 OK
see plan set on job site to see highlighted plan sections
|
|
| Heading | 05/22/2024 | ROUGH MECH | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 4/28/2024 9:42:30 PM
4/28/2024 9:42 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/23/2024 7:28:10 AM
Three unit runs of supply risers from level 1 to roof - inspection before insulation wrap
|
|
| Heading | 05/23/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 9:43:26 PM
4/28/2024 9:43 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
5/24/2024 3:54:18 PM
Generator yard shotcrete walls - steel rebar inspection
Roof 1st layer denisglass shaft wall and framing parapet walls
|
|
| Heading | 05/24/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 4/28/2024 9:44:19 PM
4/28/2024 9:44 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 05/28/2024 | DAILY INSPECTION | NICK GONZALES | CANCELLED | eTRAKiT Inspection Request | 4/28/2024 9:45:49 PM
4/28/2024 9:45 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 05/29/2024 | DAILY INSPECTION | DAVID COOKS | CORRECTIONS | eTRAKiT Inspection Request | 4/28/2024 9:47:52 PM
4/28/2024 9:47 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6502271957
e-Mail: cory.keller@truebeck.com
6/3/2024 12:44:47 AM
Corrections
Roof deck - top soffit framing screws missing at tower pan deck attachment
|
|
| Heading | 05/30/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 9:48:44 PM
4/28/2024 9:48 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
6/3/2024 12:33:35 AM
Building level one north West soffit framing building level one south east exterior wall, framing, main electrical rooms, loading dock and water pump room and building level one first layer drywall at service elevator festival
|
|
| Heading | 05/31/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 9:49:44 PM
4/28/2024 9:49 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
6/3/2024 12:41:04 AM
Roof deck, parapet, and soffit framing,
|
|
| Heading | 06/03/2024 | DAILY INSPECTION | NICK GONZALES | PARTIAL | 9 eTRAKiT Inspection Request | 4/28/2024 9:55:20 PM
4/28/2024 9:55 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
6/4/2024 7:46:56 AM
- Exterior Densglass at standby and main electrical rooms + insulation OK
As noted and highlighted on the plans for reference
|
|
| Heading | 06/04/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 9:58:58 PM
4/28/2024 9:58 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
6/5/2024 3:01:19 PM
Inspections:
-Main Electrical room 1st layer rock
-Water pump room 1st layer drywall on east and west walls and i solution on the north and south
-Tenant Space room 1160 looked at 1st layer of rock
-south east wall (back of L1 main electrical rm) looked at insulation wall.
-level 1 west exterior soffit insolation
|
|
| Heading | 06/05/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 10:02:29 PM
4/28/2024 10:02 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
6/5/2024 3:11:46 PM
Building Level 1 - 1st layer drywall inspection at the south west end wall (behind main electrical room)
Building Level 1 - 2nd layer rock at the 1160 tenant room\
Rough Frame ceiling inspection: Entry foyer
|
|
| Heading | 06/06/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 10:04:19 PM
4/28/2024 10:04 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
6/6/2024 4:51:03 PM
Roof deck tower exterior Denis glass inspection complete and drywall inspection level 2 and 1 shaft and lobby insulation outdoor canopy.
|
|
| Heading | 06/07/2024 | SHEETROCK | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/28/2024 10:05:08 PM
4/28/2024 10:05 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
6/7/2024 3:51:14 PM
Building Level 1 - 2nd layer drywall in the water pump room, 2nd layer drywall in the elevator vestibule room 1st layer drywall in the south and east bathroom walls
Level 3 - shaft wall and fire caulking
Building Level 4 - core board shaft wall and fire caulking, 2nd layer of drywall and electrical room
Level 5 shaft wall and fire caulking at electrical riser room and top down above HVAC taps only
|
|
| Heading | 06/10/2024 | INSULATION | DAVID COOKS | PARTIAL - VIRTUAL | eTRAKiT Inspection Request | 11/16/2023 8:53:13 AM
11/16/2023 8:53 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
6/10/2024 3:06:19 PM
Stair #2 Level 5 insulation - electrical room, Level 4 insulation in mechanical shaft ,and East Locker wall insulation,
|
|
| Heading | 06/10/2024 | SHEETROCK | DAVID COOKS | PARTIAL - VIRTUAL | | 6/10/2024 3:11:10 PM
Level 3 North - 2nd layer drywall screw inspection , Level 2 south shaft 2nd layer, Level 1 2nd layer south wall in restrooms, back of elevator shaft 2nd layer, and first layer bath north end
|
|
| Heading | 06/11/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 11/16/2023 8:59:30 AM
11/16/2023 8:59 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
6/3/2024 11:49:22 AM
Luis 650-722-1014
|
|
| Heading | 06/12/2024 | SHEETROCK | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 11/16/2023 8:59:30 AM
11/16/2023 8:59 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
6/3/2024 11:49:50 AM
Luis 650-722-1014
6/13/2024 7:24:48 AM
Level 5 electrical room - 1st layer drywall screw inspection, mechanical shaft core board fire caulking,
Level 4 Mechanical shaft south 2nd layer drywall and north shaft fire caulking
Level 3 Mechanical shaft 2nd layer drywall screw inspection
Level 1 Men's locker room west - top down first layer drywall and insulation
|
|
| Heading | 06/13/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | Luis 650-722-1014 | 6/13/2024 4:52:33 PM
Level 5 drywall shaft walls 2nd layer
Level 4 shaft wall fire resistive construction - fire caulk in core walls
Level 1 2nd layer drywall
Plus Level 1 Mechanical HVAC refrigerant line test run @ 500 psi for 24 hrs in gauge set in elevator control room
|
|
| Heading | 06/14/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 1/30/2024 11:15:56 AM
1/30/2024 11:15 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309098
e-Mail: danny.hernandez@truebeck.com
6/3/2024 11:49:35 AM
Luis 650-722-1014
6/14/2024 4:36:22 PM
Level 1 to Level 5 framing inspection for one side drywall application and Electrical room drywall 2nd layer
Exception
Where electrical boxes sit directly back to back add a piece of 1/2 minimum drywall to between boxes to separate alone with boxes having puddy pad application .
|
|
| Heading | 06/17/2024 | DAILY INSPECTION | NICK GONZALES | CANCELLED | 1:30 eTRAKiT Inspection Request | 1/25/2024 9:05:05 AM
1/25/2024 9:05 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 06/18/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 2/28/2024 10:51:51 AM
2/28/2024 10:51 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
6/18/2024 4:36:20 PM
1. UNDERGROUND ELECTRICAL: Onsite Gate A under ground conduit install of att line {40 feet)
2. UNDERGROUND PLUMBING: On site Gate B Recycled water line 3 Hour pressure test at 120 psi
3. UNDERGROUND PUMBING: Onsite 4” SS line 3 hour Pressure test
4. SHEETROCK: Building Level 1 Data Riser room First layer of Drywall
5. SHEETROCK: Building Level 3 IDF room First layer of Drywall
6. SHEETROCK: Building Level 5 IDF room First layer of Drywall
INSPECTIONS HIGHLIGHTED ON PLANS AND PICTURES/ PLANS SENT FROM (LUIS -SUPERINTENDENT) VAI EMAIL IN ATTACHMENTS.
6/18/2024 4:38:32 PM
6/18 200 Twin Dolphin Inspection Summary B22-2731 B22-2206 IN CDPLANS FOLDER
|
|
| Heading | 06/20/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 4/23/2024 9:59:50 PM
4/23/2024 9:59 PM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
6/20/2024 5:03:50 PM
Level 1 stair 2 shaft wall framing and west stair 2 shaft 1st layer rock. Level 1 Lobby west wall, and IDF room 1st layer drywall and building level 2 data riser room 1st layer drywall
|
|
| Heading | 06/21/2024 | DAILY INSPECTION | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 5/20/2024 1:58:04 PM
5/20/2024 1:58 PM TRUEBECK
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 06/24/2024 | SHEETROCK | DAVID COOKS | PARTIAL - VIRTUAL | | 6/24/2024 1:49:17 PM
Level one fire, cash room and lobby first layer drywall and second layer shaft and backside of stair number two walls
|
|
| Heading | 06/24/2024 | U/G PLUMBING | DAVID COOKS | PARTIAL - VIRTUAL | Miguel 650-730-9061 | 6/24/2024 1:45:23 PM
SDR 26 sewer line to grease separation containment . Note line leak pressure test required before full backfill
|
|
| Heading | 06/25/2024 | U/G PLUMBING | DAVID COOKS | APPROVED | 650.730.9061 | 6/25/2024 4:52:39 PM
Unground sewer to grease trap run - air tested @ 4psi - 11min
6/25/2024 4:54:15 PM
Plus above floor plumbing vent line water test Level 1 to 3
|
|
| Heading | 06/27/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | 650.730.9061 | 6/28/2024 8:03:27 AM
Level 1 corridor Lobby 2nd layer drywall inspection and loading dock 1st layer
Framing at South exit passageway
insulation at Fire Commanded Center
|
|
| Heading | 06/27/2024 | ROUGH PLMG | DAVID COOKS | CORRECTIONS | eTRAKiT Inspection Request | 6/18/2024 9:52:18 AM
6/18/2024 9:52 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
6/28/2024 7:54:43 AM
Correction
Cast Iron soil pipe and drain - midspan inwalls unsupported
P601.3 exc. No -Hub cast iron soil pipe shall be supported with a riser clamp located at each floor. When the distance between floors is greater than 10 feet the vertical piping shall be supported every 10 feet using riser clamps where possible or rigid supports securely fastened to the building structure.
6/28/2024 3:47:44 PM
CPC Table 313.3
|
|
| Heading | 06/28/2024 | INSULATION | DAVID COOKS | PARTIAL | FEES DUE Luis 650-722-1014 | 6/28/2024 3:57:33 PM
Men's restroom
|
|
| Heading | 06/28/2024 | ROUGH PLMG | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 6/18/2024 9:55:45 AM
6/18/2024 9:55 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
6/28/2024 3:50:01 PM
Plumbing vertical supports corrections made. Incurred Walls are ok to insulate
|
|
| Heading | 07/01/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | FEES DUE Luis 650-722-1014 | 7/1/2024 4:00:08 PM
FRAMING, SHEETROCK SCREWS AROUND SHAFT. FIRE CACHE ROOM 1105.
RATED HARD LID SHAFT.
|
|
| Heading | 07/01/2024 | ROUGH FRAMING | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 6/18/2024 9:55:45 AM
6/18/2024 9:55 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/1/2024 3:58:31 PM
FRAMIG AROUND SHAFT. FIRE CACHE ROOM 1105.
|
|
| Heading | 07/02/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 6/18/2024 9:56:35 AM
6/18/2024 9:56 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/2/2024 4:09:02 PM
1. FIRST FLOOR - DMV TEST ROUGH PLMG.
2. 5TH FLOOR - SHAFT LINER / SHEET ROCK & FIRE SEALER.
3. 1ST FLOOR - FRAMING, BOTTOM AROUND CAST CORE PERIMETR ONLY.
4. 1ST FLOOR - 1ST LAYER EXIT PASSAGEWAY.
5. 1ST FLOOR - INSULATION AT LOBBY.
|
|
| Heading | 07/02/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | FEES DUE Luis 650-722-1014 | 7/2/2024 4:10:58 PM
THRUST BLOCK & FORMS/ FOOTINGS FOR FIRE HYDRANT PIPE UNDERNEATH PLANTER BOX.
|
|
| Heading | 07/03/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | FEES DUE Luis 650-722-1014 | 7/3/2024 12:02:47 PM
SHEET ROCK - 1ST FLOOR - FIRE COMMAND CENTER.
FRAMING - 1ST FLOOR - MPOE AND BLDG ENG/ DOCK MANAGER.
INSULATION - EXTERIOR WALL FOR BLDG ENG/ DOCK MANAGER.
|
|
| Heading | 07/03/2024 | ROUGH FRAMING | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 6/18/2024 9:56:35 AM
6/18/2024 9:56 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/3/2024 11:58:23 AM
INTERIOR SHAFT WALLS AND HALLWAY TO FLOORS 1 THROUGH 5.
7/3/2024 12:03:40 PM
HALLWAY / ELEVATOR LOBBY. 2 THROUGH 5. **
|
|
| Heading | 07/05/2024 | DAILY INSPECTION | NICK GONZALES | CANCELLED | eTRAKiT Inspection Request | 6/18/2024 9:57:19 AM
6/18/2024 9:57 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 07/05/2024 | DAILY INSPECTION | NICK GONZALES | CANCELLED | FEES DUE Luis 650-722-1014 | |
|
| Heading | 07/05/2024 | DAILY INSPECTION | THOMAS SILIPIN JR | CANCELLED | FEES DUE Luis 650-722-1014 | |
|
| Heading | 07/05/2024 | ROUGH FRAMING | THOMAS SILIPIN JR | CANCELLED | eTRAKiT Inspection Request | 6/18/2024 9:57:19 AM
6/18/2024 9:57 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 07/08/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 6/18/2024 9:57:54 AM
6/18/2024 9:57 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/8/2024 11:06:58 AM
EXTERIOR LATH / WIRE.
7/8/2024 11:10:06 AM
PERIMETER OF PENTHOUSE EXTERIOR WALLS.
|
|
| Heading | 07/09/2024 | DAILY INSPECTION | TINO PADILLA | APPROVED | FEES DUE Luis 650-722-1014 | 7/9/2024 3:57:24 PM
Approval noted on the plans at the job site.
|
|
| Heading | 07/10/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | FEES DUE Luis 650-722-1014 | 7/11/2024 7:40:36 AM
Insulation:
Level 1 MPOE, Building Dock Room, and elevator lobby entry
Drywall
Level 1 2nd layer main corridor and lobby
Exterior Lath
North elevation
Back Flow water pressure test
|
|
| Heading | 07/10/2024 | ROUGH PLMG | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 6/18/2024 9:57:55 AM
6/18/2024 9:57 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/10/2024 5:04:47 PM
Level 1 plumbing domestic cold water fill test @ 80PSi, L1 - L2 mains and distribution piping domestic Hot water tested @ 80psi, L1 - L4 domestic cold water mains and L1 distribution piping tested @ 120 psi, exterior unground flex tendons and main hole grease inceptor water test
|
|
| Heading | 07/11/2024 | EXTERIOR LATH /WIRE | DAVID COOKS | | FEES DUE Luis 650-722-1014 | 7/12/2024 4:39:34 PM
Corrections:
Improper start lap and screw missing / loose wire at the south end of the lath series
|
|
| Heading | 07/11/2024 | SHEETROCK | DAVID COOKS | PARTIAL | | 7/12/2024 4:49:03 PM
Drywall screw inspection - Level 4 electrical riser room 2nd layer - Level 5 All gender room and Stair shaft Levels 1 to 5
|
|
| Heading | 07/12/2024 | EXTERIOR LATH /WIRE | DAVID COOKS | APPROVED | FEES DUE Luis 650-722-1014 | 7/12/2024 4:42:10 PM
Roof Deck tower south and east end - corrections made ok to scratch.
|
|
| Heading | 07/15/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 7:34:52 AM
7/5/2024 7:34 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/15/2024 3:09:06 PM
LEVEL 1: LOBBY CEILING FRAMING.
LEVELS 2 THROUGH 5: ELEVATOR VESTIBULE, TENANT ROOMS, ALL GENDER RESTROOMS, JANITOR AND STORAGE ROOM.
|
|
| Heading | 07/16/2024 | INSULATION | DAVID COOKS | CORRECTIONS | eTRAKiT Inspection Request | 7/5/2024 7:34:52 AM
7/5/2024 7:34 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/18/2024 7:53:43 AM
Stair shaft insulation levels 2 thru 5
Corrections:
Level 2 thru 5 stair shaft - insulation missing in the narrow corners and will need to be address before drywall - submit photos
|
|
| Heading | 07/17/2024 | SHEETROCK | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 7:36:19 AM
7/5/2024 7:36 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/18/2024 7:59:01 AM
Level 1 drywall 1st layer at elevator lobby north entry, Framing and shaft liner core board stair 3 shaft , and roof level insulation at west elevation and shaft liner assembly at west stair shaft area.
|
|
| Heading | 07/18/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 7:36:20 AM
7/5/2024 7:36 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/18/2024 3:41:50 PM
1. LEVEL 1: INSULATION AROUND CORNER OF FIRE CACHE ROOM. AND WALL ON THE OUTSIDE OF BUILDING LOBBY 1000.
2. LEVEL 1: ALL DUCT SUPPORTS WITH EXCEPTION TO 1 CHANGE OF DIRECTION IN THE FIRE COMMAND CENTER OR IN THE ELECTRICAL RISER ROOM?
|
|
| Heading | 07/19/2024 | DAILY INSPECTION | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 7:36:20 AM
7/5/2024 7:36 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/22/2024 11:54:49 AM
Level one installation at stair three shaft wall
Roof
first layer dens glass inspection, installation at penthouse corridor, and shaft wall assemble at stair three
|
|
| Heading | 07/22/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 7:37:29 AM
7/5/2024 7:37 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/22/2024 4:16:25 PM
LEVEL 1 : INSULATION - 1ST LAYER - STAIR 3 EXIT PASSAGEWAY.
INSULATION - 2ND LAYER - ELEVATOR LABBY, NORTH CORRIDOR.
LEVEL 2 THROUGH 5 : STAIR 3 FRAMING.
ROOF : ELECTRICAL ROOM SHAFTWALL ASSEMBLY AND FRAMING.
STAIR 2 - 2ND LAYER INSULATION SHAFT WALL.
|
|
| Heading | 07/23/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 7:37:29 AM
7/5/2024 7:37 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/23/2024 4:39:46 PM
ROUGH FRAMING LEVELS 2 THROUGH 5.
INSULATION LEVEL 2.
PRESSURE TEST, OVER HEAD RETURN LINE, 90 PSI, LEVELS 2 THROUGH 5.
7/23/2024 4:40:24 PM
WATER BOND FOR WATER MAIN INTO BUILDING.
7/24/2024 4:36:17 PM
RECAP: Level 1-5 Mechanical piping at west system
Level 2 Insulation at west shaft walls
Level 2-5 framing at elec riser/elevator vestibule walls
Level 1 Ground bonding at locker room pipe
|
|
| Heading | 07/24/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 7:37:29 AM
7/5/2024 7:37 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/24/2024 4:34:47 PM
1. MECHANICAL DUCT SUPPORTS LEVELS 2 THROUGH 5.
2. 1ST AND 2ND LAYER SHEETROCK LEVELS 1 THROUGH 5.
3. INSULATION FOR 2ND LEVEL AROUND RIGHT SHELL PERIMETER.
7/24/2024 4:35:28 PM
RECAP: Level 2-5 Mechanical Duct Supports
Level 1-5 Stair 1 1st layer drywall
Level 1 stair 3 exit corridor 2nd layer and insulation, 1st layer stair 2 vestibule, 2nd layer outer fire cache room, 1st layer east lobby wall on open space side
Level 2 insulation at restroom core 8’ down from ceiling to allow framing of ceilings
|
|
| Heading | 07/25/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 7:38:24 AM
7/5/2024 7:38 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/25/2024 4:39:25 PM
1. FIRST FLOOR RESTROOMS: DHW PRESSURE TEST 100 PSI. LABELING IN PROCESS, WILL SEND PICTURES OR VERIFICATION IN PERSON BEFORE CLOSE UP.
2. FIRST FLOOR RESTROOMS: DCW PRESSURE TEST 100 PSI. LABELING IN PROCESS
3. FIRST FLOOR LOCKR ROOMS: OK TO COVER LAVIES L-1A. WILL SEND PHOTOS OR IN PERSON VERIFICATION OF ELECTRICAL CONDUIT WRAP PROTECTION FROM COPPER PIPES BEFORE COVER UP.
|
|
| Heading | 07/26/2024 | U/G PLUMBING | TINO PADILLA | (AE) APPROVED W/EXCE | eTRAKiT Inspection Request | 7/5/2024 7:38:24 AM
7/5/2024 7:38 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/26/2024 3:55:39 PM
Approved with exception pending Engineering inspection for underground plumbing pipe, approval noted on the approved set of plans at the job site.
|
|
| Heading | 07/29/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 7:38:24 AM
7/5/2024 7:38 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/29/2024 3:25:19 PM
Level 1, 2, and 3 Drywall and insulation
|
|
| Heading | 07/30/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 10:43:49 AM
7/5/2024 10:43 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/30/2024 4:14:04 PM
Level 2 2nd layer drywall at room 2109 Tenant space
Level 4 Insulation around core walls
Levels 3-5 Edge of deck insulation.
|
|
| Heading | 07/31/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 10:43:49 AM
7/5/2024 10:43 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
7/31/2024 3:34:00 PM
Level 1 Recycled water lines at Locker and Restrooms, pressure gauge witnessed at 100PSI
Roof Level: Stair 1 final layer drywall at shaft wall and fire caulking ready for to insulate.
|
|
| Heading | 08/01/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 10:43:50 AM
7/5/2024 10:43 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/1/2024 4:01:35 PM
Stair 1 Levels 1-5 2nd layer
Level 1
Framing at locker room/restrooms. All in wall ok
Insulation around building engineer shop room
Final layer at loading bay corridor
Levels 2 and 3
1st and 2nd layer around core
Roof
Fire sealing spray at edge of deck from 7 line West to North side of building along 1.3 line
|
|
| Heading | 08/02/2024 | ELECT SERVICE | SPENCER SMITH | CANCELLED | | |
|
| Heading | 08/02/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 10:47:04 AM
7/5/2024 10:47 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/2/2024 3:19:41 PM
Level 1
Women’s restroom framing ok to insulate
Level 2
Insulation at electrical room hallway side
Roof level
Soffit framing at west elevation and 2nd layer drywall
|
|
| Heading | 08/05/2024 | ELECT SERVICE | SPENCER SMITH | APPROVED | eTRAKiT Inspection Request | 7/25/2024 3:10:32 PM
7/25/2024 3:10 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/5/2024 4:36:44 PM
GREEN TAGGED PROVIDED FOR MSB 1 & MSB2 MAIN PANELS
|
|
| Heading | 08/05/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 1/31/2024 9:04:58 AM
1/31/2024 9:04 AM TRUEBECK
Contact Name: TRUEBECK
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
8/5/2024 4:42:24 PM
1. Building L1 Soffit framing at North East
2. Building L1 Stair 3 Exterior 2nd layer Drywall, North corridor 1st layer drywall, Restroom inwall insolation, stair 2 east and south wall rough -in
3. Building L2 Stair 2 east wall rough in, stair 2 west wall framing, L2 restroom wall rough-in
4. Building L3 Stair 2 east wall rough in, stair 2 west wall framing, IDF room Exterior Wall 1st layer
5. Building L4 Stair 2 east wall rough in Stair 2 west wall framing, IDF room Exterior Wall 1st layer
6. Building L5 Stair 2 west wall framing, IDF room Exterior Wall 1st layer
7. Building Roof Electrical room interior rough-in and insolation at east walls, Parapet exterior drywall on south end of building, north penthouse corridor framing of the south wall and restrooms
|
|
| Heading | 08/05/2024 | ROUGH FRAMING | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 10:47:04 AM
7/5/2024 10:47 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/5/2024 4:43:29 PM
Building L1 Soffit framing at North East
|
|
| Heading | 08/06/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/5/2024 10:47:04 AM
7/5/2024 10:47 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/6/2024 5:17:38 PM
WAITING ON DAILY REPORT FROM SUPERINTENDENT LUIS.
8/7/2024 5:05:04 PM
Building Roof soffit in wall
Building Level 5 Stair 1 Exterior shaft perimeter insolate, Stair 2 vestibule east wall insolation
Building Level 4 Stair 1vestibule east wall insolation , Elevator corridor and shaft 1st layer rock,
Building Level 3 Restroom in wall Cast iron, Elevator cooridor first layer drywall, Stair 2 Vestibule east wall insolation
Building Level 2 Stair 2 South East Insolation
Building Level 1 North exterior soffit framing grids 16-17 at cc,
|
|
| Heading | 08/07/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/25/2024 3:14:55 PM
7/25/2024 3:14 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/7/2024 5:01:15 PM
Level 3 drywall, insulation and fire caulking at floor plumbing penetrations
Level 4 drywall insulation and fire caulking at floor plumbing penetrations
Roof level drywall at electrical room
|
|
| Heading | 08/08/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/25/2024 3:14:55 PM
7/25/2024 3:14 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/8/2024 4:22:34 PM
WAITING FOR MIGUEL TO SEND INSPECTION REPORT.
8/12/2024 7:02:29 AM
Level 2 insulation
Level 3 reclaimed water under pressure
Level 4 1st layer stair 2 vestibule wall
Roof Level final layer Electrical room
|
|
| Heading | 08/09/2024 | INSULATION | TINO PADILLA | APPROVED | eTRAKiT Inspection Request | 7/25/2024 3:14:55 PM
7/25/2024 3:14 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/9/2024 4:30:43 PM
Approval noted on the approved set of plans.
|
|
| Heading | 08/12/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/25/2024 3:14:55 PM
7/25/2024 3:14 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/12/2024 4:40:37 PM
Building L1 Main Electrical Room Courtesy inspection of ATS-S1 clearances (22” to the right hand side, 44” to the left.
Building L1 1st layer Lid ceiling East of Stair 2
Building L4 Electrical Riser Corridor Insolation
Building L5 Electrical Riser-Service elevator Corridor Insolation, Tenant Rooms (exterior) Insulation, Stair 2 exterior corridor Insulation, Stair 3 exterior corridor insulation
Building RF level exterior West entryway soffit Hard lid drywall inspection
Building L4 restroom Cast iron Inwall Inspection
|
|
| Heading | 08/13/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/25/2024 3:14:56 PM
7/25/2024 3:14 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/13/2024 4:46:50 PM
Building Level 1 copper Hot Water line in the water tank Room tested under 100 psi pressure to the L4 Restrooms
Building Roof Stair 1 inwall and framing
Building L5,L4,L3 and L2 Framing Stair 2
Building L4 tenant storage Rm 1st layer rock on exterior corridor, service Elevator corridor 1st layer rock, restroom Corridor first layer rock , stair 1 and shaft exterior perimeter 1st layer rock
Building L3 Tenant Rm 1st layer rock, Electrical Riser room corridor insolation, Stair 2 outer perimeter 1st rock layer
Building L2 Electrical Riser Room Corridor 1st Layer
Building L1 Service Yard pad
|
|
| Heading | 08/14/2024 | INSULATION | SPENCER SMITH | APPROVED | eTRAKiT Inspection Request | 7/25/2024 3:14:56 PM
7/25/2024 3:14 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/14/2024 4:32:41 PM
INTERIOR WALL FOR LEVEL 3 STAIR #3.
|
|
| Heading | 08/14/2024 | GAS TEST | SPENCER SMITH | APPROVED | Miguel 650-730-9061 | 8/14/2024 4:33:50 PM
PRESSURE TEST AT PG&E CONNECTION POINT, RIGHT BEFORE THE EARTHQUAKE VALVE.
100 PSI. PROVIDED GAS TAG.
|
|
| Heading | 08/15/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 7/25/2024 3:14:56 PM
7/25/2024 3:14 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/15/2024 4:50:53 PM
Levels 1-5 insulation and drywall
Level 4 CW/RW at restrooms. Verified pressure test at level 1.
|
|
| Heading | 08/16/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL - VIRTUAL | Miguel 650-730-9061 | 8/16/2024 2:18:46 PM
Waiting on report for insulation in core stair shaft.
8/16/2024 3:45:46 PM
Office Building stair 1 roof level wall framing and south wall insolation, stair 2 in wall and insolation level 5-1
|
|
| Heading | 08/19/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | | 8/19/2024 3:43:55 PM
Levels 2-6 service elevator front Shaft wall assembly/fire caulking
Levels 2-5 insulation and drywall at multiple locations
|
|
| Heading | 08/20/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/12/2024 3:09:54 PM
8/12/2024 3:09 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/20/2024 4:10:54 PM
Level 1-4 Stair 3 vestibule drywall
Level 1 elevator front shaft wall assembly at service and main elevators
Level 1 perimeter soffit dens glass at bottom track and vertical leg for waterproofing
|
|
| Heading | 08/21/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/12/2024 3:09:54 PM
8/12/2024 3:09 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/21/2024 3:25:14 PM
LEVEL 3, STAIR 3 SHEETROCK.
8/22/2024 4:05:27 PM
PENDING 1 WALL BEHIND PLUMBING PIPES
|
|
| Heading | 08/22/2024 | INSULATION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/12/2024 3:09:55 PM
8/12/2024 3:09 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/22/2024 4:06:21 PM
Levels 2-6 Deck Edge insulation
Level 1 Stair 1 shaft wall insulation
|
|
| Heading | 08/23/2024 | ROUGH PLMG | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 8/12/2024 3:09:55 PM
8/12/2024 3:09 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/26/2024 1:34:26 PM
Level 5 DWV water level leak test
|
|
| Heading | 08/26/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/12/2024 3:09:55 PM
8/12/2024 3:09 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/26/2024 4:03:19 PM
DWV PRESSURE TEST FOR LEVEL 5.
SHEETROCK FOR STAIR 2 SHAFT - LEVELS 1-5, FIRST LAYER.
8/27/2024 4:14:44 PM
Levels 1-5 stair 2 1st layer
Level 2 Stair 2 vestibule 1st layer
Level 5 DWVs at restroom cores
|
|
| Heading | 08/27/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/12/2024 3:09:55 PM
8/12/2024 3:09 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/27/2024 4:14:09 PM
Level 5 stair 2 vestibule 1st layer
Level 1 stair 2 completed 1st layer at shaft wall
Level 1 electrical rough-in at service elevator front wall (missing fire-caulking, ok to proceed with insulation)
|
|
| Heading | 08/28/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:45:53 PM
8/14/2024 1:45 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/28/2024 4:01:10 PM
Recap:
Level 5 DW hot and cold, Recycled water. Pressure verified at 100 and 80 PSI
Roof level lathe at East side of penthouse,
Roof level spray at deck edge
Level 4 drywall at stair 2 vestibule and firecaulking at service elevator front
Level 3 drywall at stair 2 vestibule and firecaulking at service elevator front
Level 1 Men’s/Women’s locker final layer drywall all around
Level 1 Final layer at Janitor’s closet and All Gender
Level 1 1st layer at stair 2 vestibule and insulation at fire cache room.
|
|
| Heading | 08/29/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:45:53 PM
8/14/2024 1:45 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/29/2024 3:43:07 PM
Recap:
Level 2/3 overhead caulking completed at restrooms. Ok to rock
Level 1-3 service elevator front insulation, ok to rock
Level 1 final layer drywall at all gender restroom and tenant room
Level 1 ceiling shaft assembly framing, ok to insulate
Level 1 stair 2 shaft wall 2nd layer
Level 1 Fire cache room ceiling 1st layer
Roof west elevation lath/ wire inspection ok to scratch coat
|
|
| Heading | 08/30/2024 | FIRE PRE-ACTION SYSTEMS | DAVID COOKS | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:45:53 PM
8/14/2024 1:45 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
8/30/2024 4:33:55 PM
inspection of the fire safing at the slab edge to curtain wall system. Level 4 and 5 at the terraces.
|
|
| Heading | 09/03/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:45:54 PM
8/14/2024 1:45 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/3/2024 4:46:34 PM
WAITING FOR REPORT TO BE SENT.
|
|
| Heading | 09/04/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:47:43 PM
8/14/2024 1:47 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/4/2024 4:51:26 PM
Levels 1, 2, 3 and 5 service elevator vestibule drywall 1st and 2nd layers
Stair 2 levels 1-3.5 2nd layer
Level 2 women's restroom 1st layer all around
Roof level deck edge fire safing insulation at north side and onto east side
|
|
| Heading | 09/05/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:47:43 PM
8/14/2024 1:47 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/5/2024 4:59:44 PM
Level 1 service elevator vestibule ceiling framing and ceiling insulation at engineer shop room
Level 1 framing at stair 2 back wall
Level 2 insulation at all gender restroom and janitor rooms
Level 2 men’s restroom final layer drywall
Level 4 service elevator vestibule 1st layer
Level 5 service elevator vestibule final layer
Roof spray fire proofing at perimeter along north side onto east side
Roof desdeck at parapet
|
|
| Heading | 09/06/2024 | INSULATION | TINO PADILLA | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:47:43 PM
8/14/2024 1:47 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/6/2024 2:19:28 PM
Partial Inspection noted on the approved plan at the job site,
Recap
Level 2 Men’s restroom, all gender restroom and janitors room final layer drywall
Level 4 Service elevator vestibule final layer
Level 5 Service elevator front 1st layer and parapet densedeck at outside face
|
|
| Heading | 09/09/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:47:44 PM
8/14/2024 1:47 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/9/2024 3:10:44 PM
Level 1:
Shaft bottom ceiling at security room
1st layer at Service elevator vestibule ceiling
Level 1-5:
final layer at Stair 2 vestibule
Level 4 up to 5:
Stair 2 final layer
|
|
| Heading | 09/10/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:52:30 PM
8/14/2024 1:52 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/10/2024 4:03:23 PM
Recap:
Level 1 Elevator lobby wall final layer
Level 3 insulation at all gender restrooms, janitor room, tenant room and women’s restroom. Drywall at men’s restroom complete
Level 4 insulation at tenant room
Level 5 1st layer at stair 3, Framing and drywall at davit storage room and deck edge insulation
|
|
| Heading | 09/11/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:52:30 PM
8/14/2024 1:52 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/11/2024 4:02:35 PM
WAITING ON REPORT.
9/12/2024 4:51:28 PM
Level 1 Security room ceiling insulation and security storage room final layer drywall
Level 5 Davit Storage room final layer on rated wall and perimeter fire safing spray
Roof level restroom DWV head water test
|
|
| Heading | 09/12/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:52:30 PM
8/14/2024 1:52 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/12/2024 7:41:11 AM
Level 1 Security room ceiling insulation and security storage room final layer drywall
Level 5 Davit Storage room final layer on rated wall and perimeter fire safing spray
Roof level restroom DWV head water test
9/12/2024 4:52:09 PM
**ABOVE IS THE REPORT FOR 9/11/24.
9/12/2024 4:52:36 PM
Level 1 1st layer hardlid
Level 2 Drywall at tenant room and lobby back wall. Insulation at deck edge on west side of building
Level 3 Drywall at women’s restroom and all gender restroom and stair 3 wall
Level 4 Insulation at all restrooms
Level 5 Final layer drywall at west shaft wall
Roof Level restroom Domestic water pressure test to 100 psi.
|
|
| Heading | 09/13/2024 | ROOF PRE-FOAM | TINO PADILLA | APPROVED | eTRAKiT Inspection Request | 8/14/2024 1:52:30 PM
8/14/2024 1:52 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/13/2024 3:55:18 PM
Foam spray approved at exterior, approval noted on the approved set of plans at the job site.
|
|
| Heading | 09/17/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:55:05 PM
8/14/2024 1:55 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/17/2024 6:58:51 AM
Level 1 Security room ceiling final layer
Level 3 Back wall of men’s restroom final layer
Level 4 Final layer at Restrooms
Level 5 Insulation at Restrooms
|
|
| Heading | 09/17/2024 | DAILY INSPECTION | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 8/14/2024 1:55:05 PM
8/14/2024 1:55 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/17/2024 4:31:05 PM
CANCELLED INSPECTIONS.
|
|
| Heading | 09/18/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:55:05 PM
8/14/2024 1:55 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/18/2024 4:54:24 PM
Roof level mechanical piping pressure verification at multiple lines.
|
|
| Heading | 09/19/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 8/14/2024 1:55:06 PM
8/14/2024 1:55 PM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 Twin Dolphin Dr.
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/19/2024 4:12:19 PM
Level 1 Security room wall framing
Level 2-5 elevator front shaft wall assembly and door pocket insulation and drywall
Level 3 final layer on stair 3 walls
Roof level pressure gauges for mechanical piping
|
|
| Heading | 09/20/2024 | DAILY INSPECTION | TINO PADILLA | APPROVED | Miguel 650-730-9061 | 9/20/2024 12:38:27 PM
Approval noted on the approved set of plans at the job site.
|
|
| Heading | 09/20/2024 | SHEETROCK | TINO PADILLA | APPROVED | Miguel 650-730-9061 | |
|
| Heading | 09/23/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | Miguel 650-730-9061 | 9/23/2024 2:32:19 PM
Levels 2-Roof - insulation at elevator front walls
Roof - insulation at stair 2 walls and framing of stair 2 vestibule.
- framing and 1st layer top down on all gender restrooms
- insulation and electrical rough in at electrical room
- framing at corridor to stair 1
|
|
| Heading | 09/24/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:01:32 AM
9/17/2024 7:01 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/24/2024 6:05:37 PM
Roof level - Wall framing, in wall rough and insulation. OK to rock.
|
|
| Heading | 09/25/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:05:37 AM
9/17/2024 7:05 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/25/2024 3:34:50 PM
Level 1,2,3 and 5 1st layer elevator front
Level 2,3, and 4 stuff and spray at deck edge
Level 2,3,4 and 5 stair 3 shaft walls
Roof drywall, insulation and shaft wall
|
|
| Heading | 09/26/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:05:38 AM
9/17/2024 7:05 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/26/2024 3:29:39 PM
6TH FLOOR / PENTHOUSE EQIUPMENT ROOM,RIGHT SIDE WALL, 2ND AND FINAL LAYER.
|
|
| Heading | 09/27/2024 | INSULATION | RED TEAM | PARTIAL | | 9/28/2024 6:56:34 PM
Stairwell #3 to 2nd floor
|
|
| Heading | 09/27/2024 | SHEETROCK | JONATHAN THOMAS | PARTIAL | 9 eTRAKiT Inspection Request | 9/17/2024 7:05:38 AM
9/17/2024 7:05 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/28/2024 6:54:12 PM
Level 6 at elevator doors outside of electrical closet.
Level 3 elevator lobby and soffit at lobby entries.
Level 2 elevator lobby soffits at exterior of lobby.
Level 1 elevator lobby not finished, Miguel to send finished pictures.
|
|
| Heading | 09/30/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:05:38 AM
9/17/2024 7:05 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
9/30/2024 4:29:32 PM
Level 3-6 Stuff and Spray fire proofing at the north slab edge
Level 3 stair 3 insulation
Level 3 and 4 insulation around stair 3 perimeter walls and 2nd layer at elevator lobby soffits
Level 4 1st layer at elevator front, framing at shaft wall around stair 3
Level 5 final layer at elevator front
Level 6 final layer at stair 2 and 1st layer at elevator front
|
|
| Heading | 10/01/2024 | DAILY INSPECTION | JONATHAN THOMAS | PARTIAL | 10 eTRAKiT Inspection Request | 9/17/2024 7:07:30 AM
9/17/2024 7:07 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/1/2024 6:19:30 PM
6th floor single elevator lobby fire wall.
4th floor (Miguel to email pictures when finished).
10/2/2024 7:15:14 AM
sheetrock was yesterday's inspections.
10/8/2024 8:52:38 AM
contractor sent photos of level 4 elevator wall 2nd layer sheetrock finished. will attach.
|
|
| Heading | 10/01/2024 | INSULATION | RED TEAM | PARTIAL | | 10/1/2024 6:34:07 PM
4th to 3rd floor stairwell
|
|
| Heading | 10/02/2024 | INSULATION | THOMAS SILIPIN JR | APPROVED | eTRAKiT Inspection Request | 9/17/2024 7:07:30 AM
9/17/2024 7:07 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 10/03/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:07:31 AM
9/17/2024 7:07 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/3/2024 4:48:52 PM
Level 1 security room final layer drywall inside room, also ok to rock at door opening for door install. Elevator furring wall final layer
Level 2-5 stair 3 vestibule ceiling framing ok to rock
Roof level insulation at corridor, ceiling framing ok to rock at all gender restrooms
|
|
| Heading | 10/04/2024 | SHEETROCK | TINO PADILLA | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:07:31 AM
9/17/2024 7:07 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/4/2024 12:34:05 PM
Partial noted on the approved set of plans on site.
|
|
| Heading | 10/07/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:08:59 AM
9/17/2024 7:08 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/7/2024 3:19:58 PM
Level 1 final layer at security room, hardlid framing at cooridors
Roof Level insulation and final layer at elevator front
|
|
| Heading | 10/08/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:09:00 AM
9/17/2024 7:08 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/8/2024 3:51:20 PM
Level 1 Domestic water pump room all equipment approved and ready for power up
Level 3-4.5 stair 3 1st layer drywall
Roof level all gender restrooms final later drywall and 1st layer elevator lobby/storage room walls
|
|
| Heading | 10/09/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:09:00 AM
9/17/2024 7:08 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/9/2024 4:32:33 PM
Level 1-4 final layer stair 3 walls
Level 5 1st layer on south wall only
|
|
| Heading | 10/10/2024 | SHEETROCK | TINO PADILLA | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:09:00 AM
9/17/2024 7:08 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/10/2024 12:57:44 PM
Partial approval noted on the job site on the approved set of plans.
|
|
| Heading | 10/11/2024 | DAILY INSPECTION | TINO PADILLA | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:10:20 AM
9/17/2024 7:10 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/11/2024 11:59:22 AM
Partial noted on the approved set of plans at the job site on the inspection report.
|
|
| Heading | 10/14/2024 | INSULATION | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 9/17/2024 7:10:20 AM
9/17/2024 7:10 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/14/2024 3:38:58 PM
CANCELLED INSPECTION FOR TODAY.
|
|
| Heading | 10/15/2024 | SHOWER PAN | DAVID COOKS | APPROVED | Miguel 650-730-9061 | 10/16/2024 8:05:32 AM
Shower pan seal and test - 6 stalls
|
|
| Heading | 10/15/2024 | SHEETROCK | DAVID COOKS | (AE) APPROVED W/EXCE | | 10/16/2024 8:11:43 AM
Level 3 and 4 - stair 3 perimeter walls final layer
Levels 4 stair 3 vestibule hard-lid drywall
Exception:
Missing drywall screws - install and submit photos
|
|
| Heading | 10/15/2024 | ROUGH MECH | DAVID COOKS | PARTIAL | | 10/16/2024 8:08:43 AM
VRF line run test Roof to level 1 - pressure test @ 600 psi
|
|
| Heading | 10/16/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:10:21 AM
9/17/2024 7:10 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/16/2024 3:43:00 PM
Level 1 Shower pan drain test at men’s/women’s locker room ADA shower
Level 2 Stair 3 vestibule hardlid drywall, drywall at stair 3 walls on north and south side
Roof Level drywall at multiple locations and framing at service elevator vestibule
|
|
| Heading | 10/17/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:11:42 AM
9/17/2024 7:11 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/17/2024 4:06:46 PM
PENTHOUSE SHEETROCK. RIGHT WALLS FROM ELEVATOR SHAFT
|
|
| Heading | 10/18/2024 | INSULATION | TINO PADILLA | CANCELLED | eTRAKiT Inspection Request | 9/17/2024 7:11:42 AM
9/17/2024 7:11 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
|
|
| Heading | 10/21/2024 | ROUGH FRAMING | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 9/17/2024 7:11:42 AM
9/17/2024 7:11 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/21/2024 3:50:52 PM
NOT READY.
|
|
| Heading | 10/22/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:13:49 AM
9/17/2024 7:13 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/22/2024 4:26:32 PM
UNDER GROUND ELECTRICAL - SITE LIGHTING CONDUIT.
2ND LAYER OF DRYWALL - 6TH FLOOR
ROUGH ELECTRICAL - ELECTRICAL SERVICE TORQUE TEST ON BREAKERS.
|
|
| Heading | 10/23/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:13:49 AM
9/17/2024 7:13 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/23/2024 4:51:14 PM
WAITING ON REPORT FROM SUPERINTENDENT.
10/24/2024 8:20:25 AM
Mechanical Penthouse Insulation/ 2nd Layer Drywall/Tape
Site Concrete – Retaining wall and Bench Rebar
L1 Electrical Room – Breaker Torque Testing
L6 Electrical Room Breaker Torque Testing
|
|
| Heading | 10/24/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:13:49 AM
9/17/2024 7:13 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/24/2024 4:46:19 PM
WAITING FOR REPORT
|
|
| Heading | 10/25/2024 | ELECT SERVICE | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 9/17/2024 7:13:49 AM
9/17/2024 7:13 AM Mike Chae
Contact Name: Miguel Rangel
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507309061
e-Mail: miguel.rangel@truebeck.com
10/25/2024 2:31:32 PM
TORQUE TEST FOR PARKING GARAGE ELECTRICAL ROOM.
|
|
| Heading | 10/28/2024 | DAILY INSPECTION | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 10/16/2024 7:49:15 AM
10/16/2024 7:49 AM Mike Chae
Contact Name: Jack Stryer
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
10/28/2024 4:03:38 PM
CANCELLED INSPECTION FOR TODAY 10-28.
|
|
| Heading | 10/29/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 10/16/2024 7:49:15 AM
10/16/2024 7:49 AM Mike Chae
Contact Name: Jack Stryer
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
10/29/2024 4:35:48 PM
6” SD and L2/L3 Final Layer Drywall at elevator lobbies.
|
|
| Heading | 10/30/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 10/16/2024 7:49:15 AM
10/16/2024 7:49 AM Mike Chae
Contact Name: Jack Stryer
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
10/30/2024 4:47:58 PM
SHEETROCK CORNER BY ELEVATOR SHAFT ON LEVELS 4 & 5.
|
|
| Heading | 10/31/2024 | ROUGH ELECTRIC | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 10/16/2024 7:49:16 AM
10/16/2024 7:49 AM Mike Chae
Contact Name: Jack Stryer
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
10/31/2024 4:49:35 PM
CANCELLED INSPECTION FOR TODAY.
|
|
| Heading | 11/01/2024 | SHEETROCK | TINO PADILLA | APPROVED | eTRAKiT Inspection Request | 10/16/2024 7:49:16 AM
10/16/2024 7:49 AM Mike Chae
Contact Name: Jack Stryer
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
11/1/2024 3:40:55 PM
Approval noted on the approved set of plans at the job site. 1st layer 58/" sheetrock approved.
|
|
| Heading | 11/04/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 10/16/2024 8:52:50 AM
10/16/2024 8:52 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
11/4/2024 3:35:46 PM
INSUALTION LEVEL 1, OFFICE AND SHEETROCK LEVEL 1 OFFICE, AND LEVEL 2 OUTSIDE OF STAIR WAY 3 SHAFT.
11/5/2024 7:12:24 AM
2nd layer Drywall (property management room)
Insulation (property management room)
2nd layer drywall – L2 stair 3 exterior wall north
|
|
| Heading | 11/05/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 10/16/2024 8:52:51 AM
10/16/2024 8:52 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
11/5/2024 2:32:27 PM
L1 property management room - 1st layer drywall
L1 Mens and Womens Restroom - Cafco Ceiling Firesafing
L1 Elevator Lobby - Ceiling Framing
|
|
| Heading | 11/06/2024 | ROUGH FRAMING | JONATHAN THOMAS | CANCELLED | jack 650.315.0491 | 11/6/2024 1:49:44 PM
No framing inspection today.
|
|
| Heading | 11/06/2024 | SHEETROCK | JONATHAN THOMAS | PARTIAL - VIRTUAL | | 11/6/2024 1:54:29 PM
Inspected 3 rated walls, not stuffed and sprayed at the top yet, on the second floor main lobby entrance that travel from the first to the third floor lobby areas.
11/25/2024 3:18:33 PM
pictures of areas inspected today and of highlighted areas on plans attached.
|
|
| Heading | 11/07/2024 | SHEETROCK | SPENCER SMITH | CANCELLED | | 11/7/2024 4:18:16 PM
NOT READY.
|
|
| Heading | 11/08/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | | 11/8/2024 3:54:38 PM
1 WALL FOR MTG ROOM 1250A
|
|
| Heading | 11/12/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | jack 650.315.0491 | 11/12/2024 3:19:02 PM
SHEETROCK in level 1 men's and woman's restrooms.
|
|
| Heading | 11/12/2024 | ROUGH FRAMING | SPENCER SMITH | PARTIAL | | 11/12/2024 3:17:58 PM
shaft wall in stair 3 vestibule, framing inspection for the doorway of Property Management room 1250
|
|
| Heading | 11/13/2024 | SHEETROCK | SPENCER SMITH | CANCELLED | | 11/14/2024 7:46:34 AM
NOT READY.
|
|
| Heading | 11/14/2024 | ROUGH FRAMING | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 11/4/2024 12:33:04 PM
11/4/2024 12:33 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
11/14/2024 4:47:52 PM
NOT READY
|
|
| Heading | 11/15/2024 | ROUGH FRAMING | NICK GONZALES | PARTIAL | 11 eTRAKiT Inspection Request | 11/4/2024 12:33:04 PM
11/4/2024 12:33 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
11/18/2024 4:07:45 PM
- Level 1 Stair 3 full height wall at doorway batt insulation OK
see attached photo for highlighted referenced inspected area
|
|
| Heading | 11/18/2024 | ROUGH FRAMING | TINO PADILLA | PARTIAL | eTRAKiT Inspection Request | 11/4/2024 12:33:04 PM
11/4/2024 12:33 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
11/18/2024 3:39:04 PM
Partial rough framing pending fire sprinkler inspection, rough framing partial for the fitness room.
|
|
| Heading | 11/19/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 11/4/2024 12:33:05 PM
11/4/2024 12:33 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
11/19/2024 4:22:16 PM
1st layer sheetrock for hallway of gym room.
|
|
| Heading | 11/19/2024 | ROUGH FRAMING | SPENCER SMITH | PARTIAL | | 11/19/2024 4:24:20 PM
FRAMING OF 1ST LEVEL EQUIPMENT ROOM AND SOFFET / HARDLID ON 6TH FLOOR ENTRANCE BEFORE ELEVATOR.
|
|
| Heading | 11/20/2024 | OTHER | JONATHAN THOMAS | PARTIAL | eTRAKiT Inspection Request | 11/4/2024 12:33:05 PM
11/4/2024 12:33 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
11/20/2024 2:38:33 PM
Inspected 1st floor Fitness Room, Gridline 12,Vestibule at south side, Yoga Room ,for insulation, 1st and 2nd layer of drywall and electrical rough.
Also inspected elevator vestibule ceiling at both ends, no middle, for rough of sprinkler, strobe and 2 lights at each end.
|
|
| Heading | 11/21/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 11/5/2024 12:26:52 PM
11/5/2024 12:26 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
11/21/2024 3:55:07 PM
2nd layer drywall inspection in the Fitness Center Vestibule.
|
|
| Heading | 11/22/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 11/5/2024 12:26:52 PM
11/5/2024 12:26 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
11/22/2024 2:40:55 PM
SHHETROCK FOR OUTSIDE WALL OF YOGA STUDIO ROOM.
|
|
| Heading | 11/25/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 11/5/2024 12:26:52 PM
11/5/2024 12:26 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
11/25/2024 3:29:49 PM
L1 Corridor Ceiling Sheetrock
|
|
| Heading | 11/26/2024 | INSULATION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 11/5/2024 12:26:53 PM
11/5/2024 12:26 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
11/26/2024 3:30:03 PM
Insulation in yoga / gym room 1st level. and around top perimeter.
|
|
| Heading | 11/27/2024 | ROUGH MECH | TINO PADILLA | CANCELLED | eTRAKiT Inspection Request | 11/5/2024 12:26:53 PM
11/5/2024 12:26 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
|
|
| Heading | 12/05/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | | 12/5/2024 4:26:56 PM
INSULATION, SHEETROCK, U/G ELECTRICAL.
12/5/2024 4:47:56 PM
L1 Yoga room – 1st layer drywall on South, West, and East walls
L1 Fitness Center – Insulation Inspection East wall
L1 Fitness Center – 1st layer drywall south wall
L2-L5 Stair 3 Shaft – Shaft Liner and Framing
Northwest RPPA Conduits
Northwest Site lighting Conduit
|
|
| Heading | 12/09/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | | 12/9/2024 4:04:03 PM
2ND LAYER IN FITNESS CENTER ROOM.
ONSITE CURB AND GUTTER PRE POUR.
12/9/2024 4:50:35 PM
Yoga Room exterior East wall – Final Layer Drywall
Yoga Room East, South, West wall – Final Layer Drywall
Fitness Center – East and south wall – Final Layer Drywall
|
|
| Heading | 12/10/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 12/2/2024 3:57:15 PM
12/2/2024 3:57 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
12/10/2024 3:21:39 PM
1. LEVELS 2 THROUGH 5, STAIR 3 SHAFT INSULATION.
2. LEVELS 2 THROUGH 5, DRYWALL SHEETRICK SCREW AT DRINKING FONTAINS.
3. LEVEL 1, ROUGH FRAME / OVER HEAD SOFFIT AT END OF PASSAGEWAY 1225.
12/10/2024 4:37:32 PM
L2-L5 Stair 3 Shaft Insulation
L2-L5 Final Layer drywall at drinking fountains
L1 hallway ceiling shaft framing (partial inspected prior)
Site Valley Gutter (B22-2206)
|
|
| Heading | 12/12/2024 | ROUGH FRAMING | JONATHAN THOMAS | PARTIAL | 1 eTRAKiT Inspection Request | 12/2/2024 3:59:42 PM
12/2/2024 3:59 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
12/12/2024 4:43:47 PM
inspected insulation, sheetrock and screw, and u/g electrical. will attach pictures of inspected areas when email from Jack received.
|
|
| Heading | 12/13/2024 | ROUGH ELECTRIC | TINO PADILLA | CANCELLED | eTRAKiT Inspection Request | 12/2/2024 3:59:42 PM
12/2/2024 3:59 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
|
|
| Heading | 12/16/2024 | 1-LAYER DRYWALL | JONATHAN THOMAS | PARTIAL | 12:30 eTRAKiT Inspection Request | 12/2/2024 3:59:42 PM
12/2/2024 3:59 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
12/16/2024 3:23:26 PM
highlit plans of area inspected attached.
|
|
| Heading | 12/17/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 12/2/2024 3:59:42 PM
12/2/2024 3:59 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
12/17/2024 4:44:13 PM
Fitness center South Wall – Insuation (B22-2731)
Fitness Center South Wall – 2nd layer drywall (B22-2731)
|
|
| Heading | 12/18/2024 | SHEETROCK | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 12/2/2024 4:01:50 PM
12/2/2024 4:01 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
12/18/2024 4:13:19 PM
Final layer drywall of outside of gym room.
|
|
| Heading | 12/23/2024 | ROUGH MECH | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 12/2/2024 4:01:51 PM
12/2/2024 4:01 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
12/23/2024 3:19:35 PM
NOT READY.
|
|
| Heading | 12/26/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | LUIS 650-722-1014 | 12/26/2024 3:58:38 PM
OVER HEAD FRAMING / SOFFIT IN GYM / FITNESS ROOMS, 1ST LEVEL.
|
|
| Heading | 12/30/2024 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | LUIS 650-722-1014 | 12/30/2024 1:23:04 PM
TOP OF SOFFIT SHEETROCK IN FITNESS ROOM.
REBAR FORMS / FOOTINGS FOR SOUTH SIDE OF BUILDING .
|
|
| Heading | 01/02/2025 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 12/2/2024 4:01:51 PM
12/2/2024 4:01 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
1/2/2025 4:39:21 PM
1. OVER HEAD MEP'S IN FITNESS ROOM.
2. 90 PSI PRESSURE TEST OVER HEAD IN FITNESS ROOM.
3. FORM / FOOTINGS FOR LIGHT POLES AND UNDERGROUND ELECTRICAL CONDUIT.
4. CURB / GUTTER PRE-POUR.
1/3/2025 8:22:39 AM
Yoga Room Overhead Rough in (B22-2731)
Fitness center mechanical piping pressure test (B22-2731)
|
|
| Heading | 01/03/2025 | DAILY INSPECTION | SPENCER SMITH | PARTIAL - VIRTUAL | eTRAKiT Inspection Request | 12/2/2024 4:03:32 PM
12/2/2024 4:03 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
1/3/2025 3:08:21 PM
DUCT SUPPORT HANGERS IN YOGA ROOM.
T-BAR FRAMING IN YOGA VESTABULE.
STAIRWELL 3 SHEETROCK.
1/3/2025 4:02:14 PM
Fitness Center Vestibule Framing and Overhead MEPF Rough in (B22-2731)
Stair 3 Ceiling Screw Inspection (B22-2731)
Vertiical Curbs between Garage and Building (B22-2206)
|
|
| Heading | 01/06/2025 | SHEETROCK | SPENCER SMITH | NOT READY | eTRAKiT Inspection Request | 12/2/2024 4:03:33 PM
12/2/2024 4:03 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
|
|
| Heading | 01/07/2025 | SLAB | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 12/2/2024 4:03:33 PM
12/2/2024 4:03 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
1/7/2025 4:56:25 PM
Traffic rated concrete reinforcement - at loading dock
|
|
| Heading | 01/08/2025 | DAILY INSPECTION | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 12/2/2024 4:03:33 PM
12/2/2024 4:03 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
1/8/2025 3:45:54 PM
CONSULTATION OF BATHROOM WALKTHROUGHS. ADA REQUIREMENTS.
|
|
| Heading | 01/09/2025 | U/G ELECTRIC | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 12/2/2024 4:03:33 PM
12/2/2024 4:03 PM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
1/9/2025 3:50:22 PM
1. PATIO FLOOR BOX U/G ELECTRICAL
2. SITE LIGHTING U/G ELECTRICAL
3. CARD READER U/G ELECTRICAL
4. MONUMENT SIGN U/G ELECTRICAL
|
|
| Heading | 01/21/2025 | CONCRETE WALL | DAVID COOKS | APPROVED | eTRAKiT Inspection Request | 12/30/2024 11:28:50 AM
12/30/2024 11:28 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
1/21/2025 4:42:27 PM
W2 two retaining stair wall reinforcement steel rebar check and 3 light pole caissons with rebar cages and electrical conduit runs
|
|
| Heading | 01/21/2025 | PIERS /CAISSON | DAVID COOKS | CORRECTIONS | | 1/21/2025 4:47:51 PM
Corrections:
2 light bollard cessions inspected - dug out footing and cessions did not match the description layout on the plans
|
|
| Heading | 01/24/2025 | ROUGH ELECTRIC | DAVID COOKS | NOT READY | eTRAKiT Inspection Request | 12/30/2024 11:43:03 AM
12/30/2024 11:43 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
|
|
| Heading | 01/29/2025 | SIDEWALK | THOMAS SILIPIN JR | APPROVED | 9-11 | 12/30/2024 11:43:03 AM
12/30/2024 11:43 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
1/29/2025 1:01:01 PM
Walk ways only. Partial area. In progress
|
|
| Heading | 01/31/2025 | SIDEWALK | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 12/30/2024 11:43:04 AM
12/30/2024 11:43 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
1/31/2025 11:15:44 AM
Cancelled due to rain.
|
|
| Heading | 01/31/2025 | U/G ELECTRIC | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 1/3/2025 11:13:53 AM
1/3/2025 11:13 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
1/31/2025 11:14:57 AM
Cancelled due to rain
|
|
| Heading | 02/03/2025 | SLAB | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 1/3/2025 11:13:54 AM
1/3/2025 11:13 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
2/3/2025 10:25:26 AM
Not ready.
|
|
| Heading | 02/04/2025 | FORMS/FOOTING | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 1/3/2025 11:13:54 AM
1/3/2025 11:13 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
2/4/2025 12:29:18 PM
Cancelled due to rain
|
|
| Heading | 02/05/2025 | ROUGH PLMG | THOMAS SILIPIN JR | CANCELLED | 9-11 | 1/3/2025 11:13:54 AM
1/3/2025 11:13 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
|
|
| Heading | 02/06/2025 | T-BAR BLDG | TINO PADILLA | (AE) APPROVED W/EXCE | eTRAKiT Inspection Request | 1/3/2025 11:13:54 AM
1/3/2025 11:13 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
2/6/2025 4:39:40 PM
T-BAR Overhead Approved with exception pending Fire sign off.
T-BAR Mechanical Approved with exception pending Fire sign off.
T-BAR Electrical Approved with exception pending Fire sign off.
T-BAR Plumbing Approved with exception pending Fire sign off.
|
|
| Heading | 02/07/2025 | SIDEWALK | TINO PADILLA | CANCELLED | eTRAKiT Inspection Request | 1/3/2025 11:13:55 AM
1/3/2025 11:13 AM Mike Chae
Contact Name: Jack Stryker
Site Address: 200 TWIN DOLPHIN DR
Phone: 6503150491
e-Mail: jack.stryker@truebeck.com
|
|
| Heading | 02/21/2025 | ROUGH FRAMING | JONATHAN THOMAS | CANCELLED | 9 eTRAKiT Inspection Request | 2/4/2025 12:31:05 PM
2/4/2025 12:31 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
|
|
| Heading | 02/24/2025 | ROUGH MECH | JONATHAN THOMAS | CANCELLED | 1 eTRAKiT Inspection Request | 2/4/2025 12:31:05 PM
2/4/2025 12:31 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
|
|
| Heading | 02/25/2025 | ROUGH PLMG | TINO PADILLA | CANCELLED | eTRAKiT Inspection Request | 2/4/2025 12:31:06 PM
2/4/2025 12:31 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
|
|
| Heading | 02/26/2025 | U/G ELECTRIC | TINO PADILLA | CANCELLED | eTRAKiT Inspection Request | 2/4/2025 12:31:06 PM
2/4/2025 12:31 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
|
|
| Heading | 02/27/2025 | CURB | TINO PADILLA | CANCELLED | eTRAKiT Inspection Request | 2/4/2025 12:31:06 PM
2/4/2025 12:31 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
|
|
| Heading | 03/06/2025 | **FINAL PLUMBING | SPENCER SMITH | CANCELLED | eTRAKiT Inspection Request | 2/19/2025 4:04:50 PM
2/19/2025 4:04 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 03/06/2025 | CURB | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 2/19/2025 3:10:52 PM
2/19/2025 3:10 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: Luis.elias@truebeck.com
|
|
| Heading | 03/07/2025 | **FINAL FIRE | JONATHAN THOMAS | CANCELLED | eTRAKiT Inspection Request | 2/19/2025 4:04:51 PM
2/19/2025 4:04 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
|
|
| Heading | 03/10/2025 | CONSULTATION | SPENCER SMITH | PERFORMED | eTRAKiT Inspection Request | 2/19/2025 4:04:51 PM
2/19/2025 4:04 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/10/2025 11:08:58 AM
Starting checklist for final trade, walk-throughs. Will be scheduling plumbing final tomorrow, mechanical for Wednesday and electrical for Thursday. Potential egress for Friday. Fire final also scheduled for Friday. They are going for building final for next Tuesday 3/18.
|
|
| Heading | 03/10/2025 | FIRE MISCELLANEOUS | STEPHEN SHUGART | CORRECTIONS | Emergency Lighting | 3/10/2025 2:12:07 PM
- Emergency lighting Main Building, emergency power transferred at 4 seconds, all corridors light, all stairwells light, all electrical/FACP/infrastructure rooms light, bathrooms light (excluded single use bathrooms), exterior lights on, terrace lights on upper floor, exit signs per plans, some minor corrections addressed at inspection, all fire extinguishers tagged and placed appeared to be sufficient
- Emergency lighting Garage, emergency power transferred at 4 seconds, elevator lobby and south stairwell light, parking structure lighting per plans
**Corrections**
1. Main Electrical Room no emergency lighting
2. ERRCS no emergency lighting
3. Fire pump room no emergency lighting
4. First floor North exit sign on emergency circuit not on
5. All exit signs in elevator lobby not working
6. Missing exit sign on the 5th floor from parking structure to elevator lobby/stairwell
3/10/2025 2:14:36 PM
Main Building fire extinguishers were serviced, tagged and placed appropriately, Knox Keys and Fobs in Knox Box
Garage Fire extinguishers tagged, but some missing the tent identifier just above the FE box
3/24/2025 11:51:46 AM
Mark Laine Verified emergency lighting @ ERRCS Final and all corrections verified
3/24/2025 11:53:07 AM
- Verified Generator and Life Safety, fire final pending completion of all outstanding fire protection systems
|
|
| Heading | 03/11/2025 | **FINAL PLUMBING | SPENCER SMITH | PARTIAL | eTRAKiT Inspection Request | 2/19/2025 4:04:51 PM
2/19/2025 4:04 PM Mike Chae
Contact Name: Luis Elias
Site Address: 200 TWIN DOLPHIN DR
Phone: 6507221014
e-Mail: luis.elias@truebeck.com
3/11/2025 3:46:41 PM
Plumbing inside building approved
3/13/2025 2:20:29 PM
Plumbing final complete
|
|
| Heading | 03/12/2025 | OTHER | SPENCER SMITH | CORRECTIONS | John 510-358-7752 | 3/12/2025 3:38:31 PM
Egress final pending, 1. Handrails in stair shafts to terminate back into walls, both top and bottom upstairs. 2. Both lobby entrances front and back need to close not less than seven seconds. And automatic door opener to open door, not less than 20 seconds.
3/13/2025 8:41:07 AM
HANDRAILS FOR STAIRS ARE FOR STAIR 1 AND 2, LEVELS 1-6 AND STAIR 3, LEVELS 1-5.
|
|
| Heading | 03/13/2025 | **FINAL ELECTRICAL | SPENCER SMITH | CORRECTIONS | John 510-358-7752 | 3/13/2025 2:12:04 PM
Full electrical walk will be tomorrow 3/14.
Found electrical correction during mechanical final walk-through. Electrical final pending disconnects for A/C units, 25 Amp or not less than 5 Amp then max fuse amps.
|
|
| Heading | 03/13/2025 | **FINAL MECHANICAL | SPENCER SMITH | PARTIAL | | 3/13/2025 2:19:20 PM
Mechanical final complete
|
|
| Heading | 03/13/2025 | OTHER | SPENCER SMITH | PARTIAL | | 3/13/2025 2:20:02 PM
Egress final complete
3/18/2025 12:20:49 PM
Egress final not complete. Igor final pending exit doors on north and west sides of building to comply with open and closing minimums
|
|
| Heading | 03/14/2025 | **FINAL ELECTRICAL | TINO PADILLA | PARTIAL | John 510-358-7752 | 3/14/2025 3:57:04 PM
Partial disconnects were installed at condensers, fuse were replace, final pending Fire final sign off, Engineering sign off, and Planning final.
|
|
| Heading | 03/17/2025 | **FINAL ELECTRICAL | SPENCER SMITH | CORRECTIONS | | 3/17/2025 7:05:05 PM
1. Multiple panels are locked, can’t access inside for verification.
2. Mc flex line touching copper pipes. Need to be separated with electrical or plumbing tape or properly supported to separate materials.
|
|
| Heading | 03/18/2025 | **FINAL BLDG | SPENCER SMITH | PARTIAL | | 3/20/2025 7:52:23 AM
BUILDING FINAL PENDING FINAL APPROVALS FROM ENGINEERING, PLANNING AND FIRE.
|
|
| Heading | 03/18/2025 | **FINAL ELECTRICAL | SPENCER SMITH | PARTIAL | | 3/18/2025 12:18:48 PM
Electrical final complete. Last final pending is egress final for main building.
|
|
| Heading | 03/18/2025 | OTHER | SPENCER SMITH | CORRECTIONS | | 3/18/2025 12:21:57 PM
Egress doors on North and West side of building to comply with open and closing minimums
|
|
| Heading | 03/18/2025 | OTHER | SPENCER SMITH | APPROVED | | 3/20/2025 7:53:30 AM
EGRESS FINAL APPROVED.
|
|
| Heading | 04/11/2025 | **FINAL BLDG | SPENCER SMITH | APPROVED | | |
|
| Heading | 04/11/2025 | CERT OF OCCUPANCY | SPENCER SMITH | CANCELLED | | 4/11/2025 2:08:13 PM
CERTIFICATE OF OCCUPANY IN ATTACHMENTS AND IN FOLDER.
4/16/2025 4:24:16 PM
Retracting the certificate of occupancy due to there being no occupant for 200 Twin Dolphin yet. Notified contractors from Truebeck through email.
|
|
| Heading | | CERT OF OCCUPANCY | SPENCER SMITH | APPROVED | | 6/12/2025 1:59:13 PM
6-12-25 certificate of occupancy has been issued to owners of 200 Twin Dolphin.
Occupants are owners 200-240 Twin Dolphin, LLC.
Document of occupancy and Certificate of occupancy are in attachments.
|
|