Permit No. B22-2731 Permit Type   COMMERCIAL BUILDING Site Address   200 TWIN DOLPHIN DR
REDWOOD CITY, CA 94065-1402
Applied   11/23/2022 Applicant   Mike Chae
Approved   09/07/2023 Owner   200-240 TWIN DOLPHIN, LLC
Issued   09/07/2023 Contractor   TRUEBECK
Parent Permit No.   Description   Warm Shell
  Notes  
 
Date of Inspection Inspection Type Inspector Result Remarks Notes

Heading 09/11/2023U/G ELECTRICRYAN FERGUSONPARTIAL650-722-10149/12/2023 7:19:46 AM Partial u/g electric for temp power. Signed on plans

Heading 09/14/2023CONCRETE WALLDAVID COOKSAPPROVED9/15/2023 8:03:06 AM 6 columns above the mat footings - rebar inspection

Heading 09/14/2023U/G PLUMBINGDAVID COOKSPARTIAL650-722-10149/15/2023 8:00:45 AM 5 plumbing runs with cleanouts - highlighted on the plans

Heading 09/19/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request9/11/2023 12:49:10 PM 9/11/2023 12:49 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: randy.shelden@truebeck.com 9/21/2023 5:02:11 PM Underground conduit run stub-ups to the future electrical room

Heading 09/22/2023CONCRETE WALLDAVID COOKSAPPROVED9/22/2023 5:07:45 PM Two shear walls - boundaries, walls and ties rebar placement and inspection

Heading 09/22/2023U/G PLUMBINGDAVID COOKSPARTIALMiguel 650-722-10149/22/2023 5:04:40 PM Plan layout

Heading 09/26/2023U/G ELECTRICNICK GONZALESPARTIAL9 eTRAKiT Inspection Request9/11/2023 12:58:35 PM 9/11/2023 12:58 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: randy.shelden@truebeck.com 9/26/2023 4:20:19 PM UG electrical before sand As noted on the plans (Purple highlight)

Heading 09/26/2023U/G PLUMBINGNICK GONZALESPARTIAL9/26/2023 4:19:35 PM UG sewer and Lab waste OK As noted on the plans for highlight (Pink + Green)

Heading 09/28/2023U/G ELECTRICNICK GONZALESPARTIAL11:30 eTRAKiT Inspection Request9/11/2023 12:59:56 PM 9/11/2023 12:59 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: randy.shelden@truebeck.com 9/28/2023 4:14:51 PM Partial UG electrical run + caution tape As noted on the plans

Heading 10/09/2023U/G PLUMBINGDAVID COOKSPARTIAL650-730-909810/9/2023 2:13:04 AM Area highlighted on plans

Heading 10/05/2023U/G ELECTRICDAVID COOKSPARTIAL650-730-9098

Heading 10/09/2023U/G PLUMBINGDAVID COOKSPARTIALeTRAKiT Inspection Request9/26/2023 9:52:48 AM 9/26/2023 9:52 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com

Heading 10/06/2023U/G PLUMBINGDAVID COOKSNOT READYeTRAKiT Inspection Request9/26/2023 9:58:38 AM 9/26/2023 9:58 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com

Heading 10/10/2023CONCRETE WALLJOE ROSSBACHPARTIAL10/10/2023 5:12:36 PM Ramp wall gridline C from 8 to 12 Elevator walls first floor per RFI 88 Stair 1 walls first floor Shear wall GL 21 fromA8 to C2

Heading 10/11/2023U/G PLUMBINGDAVID COOKSNOT READYeTRAKiT Inspection Request9/26/2023 9:59:50 AM 9/26/2023 9:59 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com

Heading 10/11/2023U/F PLUMBINGDAVID COOKSNOT READYeTRAKiT Inspection Request10/3/2023 10:03:20 AM 10/3/2023 10:03 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com

Heading 10/12/2023U/G ELECTRICDAVID COOKSCANCELLEDDanny 650-730-9098

Heading 10/12/2023U/G PLUMBINGDAVID COOKSCANCELLEDeTRAKiT Inspection Request10/3/2023 2:52:10 PM 10/3/2023 2:52 PM TRUEBECK Contact Name: Danny w/ TRUEBECK Cons. Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com

Heading 10/13/2023U/F PLUMBINGDAVID COOKSNOT READYeTRAKiT Inspection Request9/26/2023 10:00:24 AM 9/26/2023 10:00 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com

Heading 10/16/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request9/26/2023 10:01:02 AM 9/26/2023 10:01 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com 10/16/2023 2:55:57 PM Underground conduit run - exception = spread out a bundle of three conducts stacked on top of each other- submit photo before sand cover

Heading 10/17/2023U/G ELECTRICDAVID COOKSNOT READYeTRAKiT Inspection Request10/3/2023 2:56:22 PM 10/3/2023 2:56 PM TRUEBECK Contact Name: Danny w/ TRUEBECK Cons. Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com

Heading 10/18/2023U/F PLUMBINGDAVID COOKSPARTIALeTRAKiT Inspection Request10/10/2023 11:18:07 AM 10/10/2023 11:18 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com 10/23/2023 12:02:21 AM Plumbing rework complete 10/23/2023 12:03:02 AM 4" sewer line

Heading 10/18/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request10/3/2023 2:57:24 PM 10/3/2023 2:57 PM TRUEBECK Contact Name: Danny w/ TRUEBECK Cons. Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 10/23/2023 12:04:12 AM Backfill

Heading 10/19/2023U/G ELECTRICDAVID COOKSNOT READYeTRAKiT Inspection Request10/4/2023 7:10:15 AM 10/4/2023 7:10 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com

Heading 10/19/2023U/G PLUMBINGDAVID COOKSPARTIALeTRAKiT Inspection Request10/10/2023 11:18:47 AM 10/10/2023 11:18 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com

Heading 10/20/2023U/G PLUMBINGDAVID COOKSPARTIALeTRAKiT Inspection Request10/10/2023 9:43:01 AM 10/10/2023 9:43 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: 200twindolphin@truebeck.com 10/23/2023 12:12:33 AM Lab waste and sewer - 5ft trench 1/4" per foot fall

Heading 10/23/2023U/G PLUMBINGNICK GONZALESCANCELLEDeTRAKiT Inspection Request10/10/2023 11:20:09 AM 10/10/2023 11:20 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com

Heading 10/23/2023U/G ELECTRICNICK GONZALESPARTIAL9 eTRAKiT Inspection Request10/10/2023 9:45:29 AM 10/10/2023 9:45 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: 200twindolphin@truebeck.com 10/23/2023 2:43:30 PM partial caution tape and sand at noted areas on the plans (highlighted and marked)

Heading 10/24/2023U/G ELECTRICTHOMAS SILIPIN JRPARTIALeTRAKiT Inspection Request10/4/2023 7:12:43 AM 10/4/2023 7:12 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 10/24/2023 3:53:57 PM 40 foot run of electrical conduit. okay to cover

Heading 10/24/2023U/G PLUMBINGTHOMAS SILIPIN JRNOT READYeTRAKiT Inspection Request10/4/2023 7:16:11 AM 10/4/2023 7:16 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 10/24/2023 3:46:05 PM Small section of conduit okay to cover. 40' of pipe.

Heading 10/25/2023U/G ELECTRICNICK GONZALESPARTIALeTRAKiT Inspection Request10/16/2023 8:45:48 AM 10/16/2023 8:45 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: 200twindolphin@truebeck.com 10/25/2023 4:49:37 PM UG electrical conduit at yellow area OK per uploaded sheet As noted on the plans

Heading 10/25/2023U/G PLUMBINGNICK GONZALESPARTIALeTRAKiT Inspection Request10/4/2023 7:20:21 AM 10/4/2023 7:20 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: 200twindolphin@truebeck.com 10/25/2023 4:50:16 PM UG lab waste, sewer, and venting As noted on the plans (highlighted)

Heading 10/26/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request10/16/2023 8:49:58 AM 10/16/2023 8:49 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: 200twindolphin@truebeck.com 10/27/2023 4:27:43 PM Unground conduit run

Heading 10/26/2023U/G PLUMBINGDAVID COOKSPARTIALeTRAKiT Inspection Request10/4/2023 7:21:28 AM 10/4/2023 7:21 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com 10/27/2023 4:29:03 PM Underground drain and sewer line - tested ok to sand fill

Heading 10/27/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request10/10/2023 11:17:19 AM 10/10/2023 11:17 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com 10/27/2023 4:25:51 PM underground 3" and 2" electrical conduit run - partial ok to backfill with sand

Heading 10/27/2023U/G PLUMBINGDAVID COOKSPARTIALeTRAKiT Inspection Request10/16/2023 8:51:42 AM 10/16/2023 8:51 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: 200twindolphin@truebeck.com 10/27/2023 3:51:08 PM Appx. 200 ft buried drain line - tested and approved

Heading 10/30/2023FORMS/FOOTINGDAVID COOKSAPPROVEDeTRAKiT Inspection Request10/10/2023 11:22:10 AM 10/10/2023 11:22 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com 10/30/2023 2:04:46 PM Added 30 x 36" grade beam per grade beam SSK-2 for added crane support - steel reinforcement inspection

Heading 10/31/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request10/4/2023 7:32:10 AM 10/4/2023 7:32 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 650730 e-Mail: 200twindolphin@truebeck.com 11/2/2023 4:45:40 PM underground conduit run

Heading 10/31/2023SLABDAVID COOKSNOT READYeTRAKiT Inspection Request10/10/2023 11:23:12 AM 10/10/2023 11:23 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com

Heading 11/01/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request10/10/2023 11:23:50 AM 10/10/2023 11:23 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com 11/2/2023 4:54:40 PM Underground conduit run - sand fill and warning ribbon

Heading 11/01/2023U/G PLUMBINGDAVID COOKSPARTIALeTRAKiT Inspection Request10/4/2023 7:34:49 AM 10/4/2023 7:34 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 11/2/2023 4:50:23 PM Under parking garage plumbing run

Heading 11/02/2023U/G ELECTRICDAVID COOKSNOT READYeTRAKiT Inspection Request10/4/2023 7:37:20 AM 10/4/2023 7:37 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: 200twindolphin@truebeck.com

Heading 11/02/2023SLABDAVID COOKSNOT READYeTRAKiT Inspection Request10/10/2023 11:24:21 AM 10/10/2023 11:24 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com

Heading 11/06/2023U/G ELECTRICNICK GONZALESPARTIAL11/7/2023 7:17:46 AM UG conduit and caution tape verified at rear end of the building and highlighted on the plan sheet for the referenced areas

Heading 11/07/2023SLABDAVID COOKSPARTIALeTRAKiT Inspection Request10/4/2023 7:39:07 AM 10/4/2023 7:39 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 11/9/2023 12:23:52 AM Slab on grade Pour 1

Heading 11/08/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request10/4/2023 7:41:06 AM 10/4/2023 7:41 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 11/9/2023 12:30:41 AM underground conduit run plus partial trench sand fill with warning ribbon

Heading 11/08/2023U/G PLUMBINGDAVID COOKSPARTIAL11/9/2023 12:37:33 AM 3 inch drain line and 2" vent plus potable water line

Heading 11/08/2023SLABDAVID COOKSAPPROVED11/9/2023 12:34:11 AM Pour 1 steel rebar inspection complete EOR submitted and special inspector report

Heading 11/09/2023FORMS/FOOTINGNICK GONZALESPARTIAL10 eTRAKiT Inspection Request10/4/2023 7:43:46 AM 10/4/2023 7:43 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 11/9/2023 4:17:50 PM Mat slab on grade on green highlighted portion of main building OK As noted on the plans

Heading 11/09/2023UFERNICK GONZALESPARTIAL11/9/2023 4:16:36 PM UFER at main building OK for underslab (verification of rods and threaded grounding conductor)

Heading 11/13/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request10/23/2023 12:21:54 PM 10/23/2023 12:21 PM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 11/13/2023 1:47:47 PM On grade conduit run - 6” gravel & 6” slab overlay

Heading 11/13/2023U/G PLUMBINGDAVID COOKSPARTIAL11/13/2023 1:52:22 PM Liter drains 3 lines water tested

Heading 11/14/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request10/4/2023 7:53:50 AM 10/4/2023 7:53 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 11/14/2023 4:42:45 PM South end of ramp - unground electrical conduit run - highlighted on plans

Heading 11/14/2023SLABDAVID COOKSNOT READYDanny 650-730-9098

Heading 11/15/2023U/G ELECTRICDAVID COOKSPARTIALeTRAKiT Inspection Request10/4/2023 7:53:51 AM 10/4/2023 7:53 AM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 11/17/2023 4:53:31 PM Partial Generator room underground conduit run

Heading 11/16/2023FORMS/FOOTINGDAVID COOKSPARTIALeTRAKiT Inspection Request11/1/2023 8:46:53 AM 11/1/2023 8:46 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com 11/17/2023 4:48:02 PM 3 columns in footing with 10#9 vertical rebar #3 rebar stirrups @ 4" oc

Heading 11/17/2023U/G ELECTRICDAVID COOKSNOT READYeTRAKiT Inspection Request10/23/2023 12:23:35 PM 10/23/2023 12:23 PM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com

Heading 11/17/2023SLABDAVID COOKSNOT READYeTRAKiT Inspection Request11/7/2023 9:00:15 AM 11/7/2023 9:00 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com

Heading 11/20/2023U/F PLUMBINGNICK GONZALESCANCELLEDeTRAKiT Inspection Request10/23/2023 12:27:14 PM 10/23/2023 12:27 PM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: Randy.Shelden@truebeck.com 11/20/2023 8:10:31 AM spoke with super intendant and he cancelled the inspection

Heading 11/21/2023FORMS/FOOTINGNICK GONZALESNOT READY10 eTRAKiT Inspection Request10/23/2023 12:30:15 PM 10/23/2023 12:30 PM TRUEBECK Contact Name: Danny W/ Truebeck Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: Randy.Shelden@truebeck.com 11/21/2023 4:57:55 PM In-progress inspection completed at main building slab - water proofing at columns still needed - provide insulation wrap around plumbing fixtures - pending forms at thickened edge with vertical dowels at rear and perimeter walls

Heading 11/22/2023FORMS/FOOTINGFERNANDO ROMEROPARTIALeTRAKiT Inspection Request10/23/2023 12:31:31 PM 10/23/2023 12:31 PM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: Randy.Shelden@truebeck.com 11/22/2023 4:26:39 PM Observed rebar mat for garage. Received letter of observation by EOR, report by special inspector is pending. See notes on page SC-2.1

Heading 11/28/2023FORMS/FOOTINGNICK GONZALESPARTIAL9 eTRAKiT Inspection Request10/23/2023 12:35:23 PM 10/23/2023 12:35 PM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 11/29/2023 7:11:15 AM PT slab for ramp at parking garage for pour 2 pending installation of slip dowels at C11.5 at PT slab tie in/break

Heading 11/29/2023FORMS/FOOTINGTINO PADILLAPARTIALeTRAKiT Inspection Request10/23/2023 12:37:07 PM 10/23/2023 12:37 PM TRUEBECK Contact Name: Danny w/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 11/29/2023 4:21:54 PM Partial slab was noted on plans at the job site.

Heading 11/30/2023SLABDAVID COOKSAPPROVEDeTRAKiT Inspection Request11/1/2023 8:51:15 AM 11/1/2023 8:51 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com 12/1/2023 4:18:10 PM Level 2 PT slab region enclosed by grids A, C, 7 & 11.3

Heading 12/01/2023U/G PLUMBINGDAVID COOKSNOT READYeTRAKiT Inspection Request11/16/2023 8:33:33 AM 11/16/2023 8:33 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 12/04/2023U/G PLUMBINGNICK GONZALESCANCELLEDeTRAKiT Inspection Request10/10/2023 11:00:04 AM 10/10/2023 11:00 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: 200twindolphin@truebeck.com

Heading 12/04/2023SLABNICK GONZALESCANCELLEDeTRAKiT Inspection Request11/16/2023 8:43:43 AM 11/16/2023 8:43 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.ragel@truebeck.com

Heading 12/05/2023CONCRETE WALLDAVID COOKSCORRECTIONS650-730-909812/7/2023 3:10:30 PM Corrections: perimeter Columns Grid line A - F - in need of steel adjustments at the stirrup's ties and cleaning

Heading 12/06/2023CONCRETE WALLDAVID COOKSAPPROVEDeTRAKiT Inspection Request10/5/2023 9:21:34 AM 10/5/2023 9:21 AM TRUEBECK Contact Name: Danny W/ TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: jose.hernandez@truebeck.com 12/7/2023 3:19:03 PM Shear wall on 9 line and perimeter columns grid line A - 7 steel rebar inspection.

Heading 12/07/2023U/G PLUMBINGDAVID COOKSNOT READYeTRAKiT Inspection Request11/1/2023 8:55:56 AM 11/1/2023 8:55 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com

Heading 12/08/2023SLABDAVID COOKSNOT READYeTRAKiT Inspection Request11/16/2023 8:48:04 AM 11/16/2023 8:48 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 12/11/2023ROUGH FRAMINGNICK GONZALESCANCELLEDeTRAKiT Inspection Request11/16/2023 8:48:04 AM 11/16/2023 8:48 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 12/12/2023U/G ELECTRICDAVID COOKSCANCELLEDeTRAKiT Inspection Request11/1/2023 8:57:15 AM 11/1/2023 8:57 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com

Heading 01/03/2024U/G ELECTRICNICK GONZALESCORRECTIONS1 eTRAKiT Inspection Request12/11/2023 9:45:39 AM 12/11/2023 9:45 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 1/3/2024 3:51:04 PM - Grid line 19 to 21 PT slab ramp UF conduit shall have clearance from rebar/pt cables

Heading 01/08/2024CONCRETE WALLDAVID COOKSAPPROVED1/8/2024 3:20:43 PM Columns - steel rebar inspection - C line 13 c- 20 C3 columns D line 21 & 18 C1 columns

Heading 01/09/2024CONCRETE WALLDAVID COOKSAPPROVEDeTRAKiT Inspection Request12/11/2023 9:55:45 AM 12/11/2023 9:55 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 1/9/2024 4:33:45 PM 4 - C1 columns rebar inspection

Heading 01/11/2024DAILY INSPECTIONNICK GONZALESPARTIAL9 eTRAKiT Inspection Request12/11/2023 9:59:59 AM 12/11/2023 9:59 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 1/12/2024 7:41:24 AM Observed placement of reinforcing steel and PT cables for Two post-tension deck at 1-11.4/A-D. Work complete. Reference detail SC6.2 and SC7.1. Level two pour two complete 1-11.4/A-D also elevator wall on C.6 between 20 and 20, complete.

Heading 01/17/2024DAILY INSPECTIONNICK GONZALESCANCELLED9:30 eTRAKiT Inspection Request12/11/2023 10:28:05 AM 12/11/2023 10:28 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 01/18/2024DAILY INSPECTIONNICK GONZALESPARTIAL9 eTRAKiT Inspection Request12/11/2023 10:33:07 AM 12/11/2023 10:33 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 1/19/2024 7:15:34 AM Shear wall steel reinforcement and steel reinforcement columns OK see attached reports from special in attachments

Heading 01/19/2024SLABNICK GONZALESPARTIAL10:30 eTRAKiT Inspection Request12/11/2023 10:36:04 AM 12/11/2023 10:36 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 1/22/2024 8:07:31 AM Observed placement of reinforcing steel for Level two wall(s) at line 1 thru 2 between C.8 and D. Work complete. Reference detail SC4.1, SC6.1F. Garage level two walls on 1 thru 2 near D.

Heading 01/22/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request12/11/2023 10:37:44 AM 12/11/2023 10:37 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 1/22/2024 11:49:19 AM Level 3 ramp - 2 -c1 columns 10 number 8 rebar with ties @ 4” oc

Heading 01/25/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request12/11/2023 10:39:46 AM 12/11/2023 10:39 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 01/25/2024SLABDAVID COOKSNOT READYeTRAKiT Inspection Request12/11/2023 10:49:30 AM 12/11/2023 10:49 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: Randy.Shelden@truebeck.com

Heading 01/26/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request12/11/2023 10:53:13 AM 12/11/2023 10:53 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 01/30/2024SLABDAVID COOKSCANCELLEDeTRAKiT Inspection Request1/19/2024 1:49:01 PM 1/19/2024 1:49 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 02/01/2024SLABDAVID COOKSPARTIALMiguel 650-730-9061 *fees due*2/2/2024 9:11:08 AM Level 2 pan deck rebar placement - work in progress

Heading 02/07/2024SLABDAVID COOKSPARTIALeTRAKiT Inspection Request1/25/2024 8:58:25 AM 1/25/2024 8:58 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 2/7/2024 4:54:21 PM Level 3 pan deck - steel trim missing at south corner - after addition of trim slab is ok to concrete pour. Submit photo

Heading 02/08/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request1/25/2024 8:59:57 AM 1/25/2024 8:59 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 02/09/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request1/31/2024 9:04:58 AM 1/31/2024 9:04 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 02/12/2024DAILY INSPECTIONNICK GONZALESCANCELLEDeTRAKiT Inspection Request1/30/2024 11:11:34 AM 1/30/2024 11:11 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com

Heading 02/14/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request1/30/2024 11:13:27 AM 1/30/2024 11:13 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com

Heading 02/14/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request1/30/2024 11:15:06 AM 1/30/2024 11:15 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com 2/15/2024 8:04:58 AM Partial slab - work in progress perimeter rebar steel to be tied and supported.

Heading 02/15/2024DAILY INSPECTIONDAVID COOKS(AE) APPROVED W/EXCEeTRAKiT Inspection Request1/30/2024 11:17:02 AM 1/30/2024 11:17 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com 2/16/2024 8:30:56 AM Pan Deck rebar inspection - Level 4 Exception: Rebar ties needed around elevator shaft edges to lift off deck before concrete fill. Submit photo

Heading 02/16/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request1/30/2024 11:18:22 AM 1/30/2024 11:18 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com

Heading 02/20/2024DAILY INSPECTIONDAVID COOKSNO ACCESSeTRAKiT Inspection Request1/25/2024 9:01:48 AM 1/25/2024 9:01 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 02/21/2024SLABDAVID COOKSAPPROVEDeTRAKiT Inspection Request1/25/2024 9:03:09 AM 1/25/2024 9:03 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 2/21/2024 4:34:13 PM Level 2 pour 2 pan deck south half - steel rebar inspection

Heading 02/22/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request1/25/2024 9:05:03 AM 1/25/2024 9:05 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 02/23/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request1/25/2024 9:06:04 AM 1/25/2024 9:06 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 2/23/2024 3:58:07 PM Rebar dowelling for Block outs fill in the column containment areas - Corrections: 5 areas need adjustment and ties in the steel rebar dowel arraignment.

Heading 02/26/2024DAILY INSPECTIONNICK GONZALESCANCELLEDeTRAKiT Inspection Request1/25/2024 9:07:37 AM 1/25/2024 9:07 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 03/01/2024SLABNICK GONZALESPARTIAL8:30 Miguel 650-730-9061 *fees due*3/4/2024 7:20:00 AM - Steel fluted deck with slab rebar + pins at east end to interior stair well OK pending SEOR observation letter

Heading 03/04/2024ROUGH FRAMINGDAVID COOKSPARTIALMiguel 650-730-90613/6/2024 4:39:14 PM ventilator Shaft layout framing before fire rate spray foam (mono coat)

Heading 03/05/2024SLABDAVID COOKSCORRECTIONSMiguel 650-730-90613/6/2024 4:42:33 PM Corrections: 1. Diagonal steel at opening missing 2. trim bar at west end broke loose from weld 3. rebar laying on steel at the stair openings.

Heading 03/06/2024SLABDAVID COOKSAPPROVEDMiguel 650-730-906111/16/2023 8:37:59 AM 11/16/2023 8:37 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 3/6/2024 4:44:02 PM Corrections made pour 2 south end pan deck slab ok to pour

Heading 03/07/2024ROUGH FRAMINGDAVID COOKSPARTIALMarco 650-769-93032/28/2024 10:54:58 AM In wall framing? 3/8/2024 8:36:14 AM Wall framing retaining clips installed at the ceiling around the stair and ventilation shafts - before mona coat spray foam application. level 1

Heading 03/08/2024DAILY INSPECTIONDAVID COOKS(AE) APPROVED W/EXCEeTRAKiT Inspection Request2/28/2024 10:39:48 AM 2/28/2024 10:39 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/8/2024 4:50:24 PM Level 5 pour 1 deck rebar inspection and Level 1 column infield rebar inspection 8 areas total Exception: 1. Add rebar between stair above beam as pointed out during inspections 2. Pump out all water in the column base areas before concrete fill. Will check corrected areas during next inspection

Heading 03/11/2024DAILY INSPECTIONNICK GONZALESPARTIALeTRAKiT Inspection Request2/28/2024 10:44:29 AM 2/28/2024 10:44 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/12/2024 6:57:11 AM - Clip attachment for level 1 restrooms to fluted deck requires RFI to give clarification on top metal framed track attachment (fire rating for deflection opening and screws)

Heading 03/12/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request2/28/2024 10:45:30 AM 2/28/2024 10:45 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: cory.keller@truebeck.com

Heading 03/13/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request2/28/2024 10:46:41 AM 2/28/2024 10:46 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/13/2024 4:46:27 PM Level 5 pan deck work in progress inspection 3/13/2024 4:46:56 PM Pour 2

Heading 03/14/2024SLABDAVID COOKS(AE) APPROVED W/EXCEeTRAKiT Inspection Request2/28/2024 10:48:51 AM 2/28/2024 10:48 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/14/2024 4:29:33 PM Pan deck steel rebar inspection Level 5 pour 2 Exception: Deck Clearance - cleaning Clean deck provide video of debris removal in progress

Heading 03/15/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request2/28/2024 10:50:46 AM 2/28/2024 10:50 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/18/2024 9:20:23 AM Rebar inspection - Level 5 roof deck work in progress

Heading 03/18/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request2/28/2024 11:02:21 AM 2/28/2024 11:02 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/18/2024 2:57:17 PM Roof Deck Level 6 pour 1 - rebar placement and sizing - ok to pour

Heading 03/19/2024DAILY INSPECTIONDAVID COOKSCORRECTIONSeTRAKiT Inspection Request2/28/2024 11:03:21 AM 2/28/2024 11:03 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/21/2024 8:11:11 AM Level 3 framing clips overhead before mono-coat spray - missing clips over stair vertical framing

Heading 03/20/2024DAILY INSPECTIONDAVID COOKSAPPROVEDeTRAKiT Inspection Request2/28/2024 11:04:11 AM 2/28/2024 11:04 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/21/2024 8:13:13 AM Level 3 overhead framing clips installed before mono-coat spray - ok to spray.

Heading 03/21/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request2/28/2024 11:06:57 AM 2/28/2024 11:06 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 03/22/2024DAILY INSPECTIONTHOMAS SILIPIN JRAPPROVEDeTRAKiT Inspection Request2/28/2024 11:07:59 AM 2/28/2024 11:07 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/22/2024 10:28:06 AM column inspection grid lines 12,13,14,18,19,21 on grid line D

Heading 03/25/2024DAILY INSPECTIONNICK GONZALESPARTIALeTRAKiT Inspection Request3/1/2024 8:47:25 AM 3/1/2024 8:47 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/27/2024 7:46:48 AM - Steel structure level 5 fluted deck slab rebar, pads, penetrations, openings verified Special inspection report provided and SEOR observation letter provided

Heading 03/26/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request3/1/2024 8:51:01 AM 3/1/2024 8:51 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: cory.keller@truebeck.com

Heading 03/27/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request3/1/2024 8:52:44 AM 3/1/2024 8:52 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/29/2024 4:50:26 PM Elevator and shaft core board wall framing - Level 1

Heading 03/28/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request3/1/2024 8:55:40 AM 3/1/2024 8:55 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 03/29/2024FIRE RESISTIVE CONSTDAVID COOKSAPPROVEDeTRAKiT Inspection Request3/1/2024 8:57:03 AM 3/1/2024 8:57 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/29/2024 4:41:45 PM Shaft and elevator core wall installation and fire caulking - Level 1

Heading 04/01/2024INSULATIONDAVID COOKSPARTIAL - VIRTUAL4/1/2024 3:04:42 PM Elevator core board shaft walls Level 2 ok to drywall

Heading 04/01/2024DAILY INSPECTIONDAVID COOKSAPPROVEDeTRAKiT Inspection Request3/1/2024 9:00:18 AM 3/1/2024 9:00 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/1/2024 3:00:12 PM DX2 liquid hot gas rated @ 300 psi tested @ 500psi and heating hot line test rated @ 70 psi tested @ 100 pse

Heading 04/02/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request3/1/2024 9:19:29 AM 3/1/2024 9:19 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/2/2024 4:32:06 PM Inspection: Roof Level 5 - 3 MECHANICAL PLATFORMS 4/2/2024 4:42:39 PM 2nd Floor - two shaft walls and fire caulking 1st floor - shaft wall drywall 1st layer

Heading 04/03/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request3/1/2024 9:21:56 AM 3/1/2024 9:21 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/4/2024 9:04:38 AM Level 1 Frame inspection for Top out drywall installation 2nd layer shaft wall drywall screw inspection

Heading 04/03/2024SLABDAVID COOKSCORRECTIONS4/4/2024 9:12:06 AM Corrections: Level 5 roof - equipment platforms - rebar spacing and cleaning loose concrete slag

Heading 04/04/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request3/1/2024 9:23:45 AM 3/1/2024 9:23 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/5/2024 4:09:17 PM Level 3 shaft liner inspection, Level 1 top out screw inspection plus first layer drywall, and Rough Frame inspection for top out one side

Heading 04/05/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request3/1/2024 9:25:18 AM 3/1/2024 9:25 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/5/2024 4:14:24 PM Level 3, 2nd layer top out, Level 5 clips and tracks prior to mono coat application, and Roof Deck 6 equipment platforms ok to concrete fill

Heading 04/08/2024DAILY INSPECTIONNICK GONZALESPARTIALeTRAKiT Inspection Request3/1/2024 9:26:30 AM 3/1/2024 9:26 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/8/2024 3:41:57 PM - In-progress inspection for curbs/raised curbs at level 5 Work was not fully completed at the time of inspection clarification needed if U-bars are required at each inbed

Heading 04/09/2024DAILY INSPECTIONNICK GONZALESPARTIALeTRAKiT Inspection Request3/1/2024 9:28:32 AM 3/1/2024 9:28 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/9/2024 2:51:28 PM - Rooftop perimeter curb/curb walls forms, U-bar, embedment's, and steel OK As noted on the plans (green dotted highlights)

Heading 04/10/2024DAILY INSPECTIONNICK GONZALESPARTIAL9 eTRAKiT Inspection Request3/1/2024 9:29:40 AM 3/1/2024 9:29 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/12/2024 7:03:22 AM Mon- Looked at curbs at roof of building - Partial at perimeter Tues- Curbs at roof around penthouse, shaft liner at level 3 and top out drywall at level 1 – Passed - CMU at level 1 Main electrical room in progress inspection Wed- Insulation at level 3 shaft wall (confirmed caulking complete), top out framing at level 2 and stair shaft wall liner ok to insulate – Passed See attached reports for highlighted sections

Heading 04/11/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request3/1/2024 9:31:36 AM 3/1/2024 9:31 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/12/2024 8:28:11 AM Inspections: Level 4 - Shaft wall liner / caulking Level 3 - 1st layer shaft wall sheetrock Level 2 - Stair 1 shaft liner / fire caulking Level 1 - insulation at shaft wall in electrical room

Heading 04/12/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request3/1/2024 9:33:19 AM 3/1/2024 9:33 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/12/2024 4:52:17 PM 3rd floor 2nd layer drywall inspection - elevator shaft Level 1 shaft core board and fire caulking inspection

Heading 04/15/2024DAILY INSPECTIONDAVID COOKSPARTIAL - VIRTUALeTRAKiT Inspection Request3/28/2024 9:43:05 AM 3/28/2024 9:43 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 4/15/2024 3:05:47 PM It’s layer drywall in the electrical and equipment room

Heading 04/17/2024OTHERDAVID COOKSPARTIAL4/25/2024 7:48:04 AM Drywall and core-board inspection Level 1 - 2nd layer drywall electrical room Level 3 - elevator shaft 2nd layer drywall

Heading 04/18/2024DAILY INSPECTIONDAVID COOKSPARTIAL4/25/2024 8:03:11 AM Level 4 - insulation in the stair shaft and 2nd layer drywall North Shaft Level 3 - Framing in bath rooms - insulation in stair 1 walls Level 2 - Framing in electrical room North wall - Fire Caulk in the shaft coreboard wall

Heading 04/19/2024DAILY INSPECTIONDAVID COOKSPARTIAL4/25/2024 4:10:42 PM Level 4 Framing and insulation at elevator shaft Level 2 Core Board Stair 1, Top out drywall placement in the corridor, Level 1 - First layer drywall in South Corridor, stair landing and North Wall

Heading 04/22/2024FORMS/FOOTINGNICK GONZALESPARTIAL4/24/2024 7:07:41 AM - Steel placement for base level architectural curb (#5) on east side elevation OK highlighted on the plan sheet for reference area

Heading 04/23/2024DAILY INSPECTIONDAVID COOKSPARTIAL4/25/2024 4:16:45 PM Level 1 North Wall electrical room - 1st and 2nd layer drywall, Lobby 2nd layer top out and 1st layer drywall in the West lobby Level 2 Fire Riser Room top out and 1st layer North Wall Level 3 1st layer West Corridor and Framing in the data riser room Level 4 West corridor top out framing

Heading 04/24/2024DAILY INSPECTIONDAVID COOKSPARTIAL4/25/2024 4:21:43 PM Level 3 and 4 - 2nd layer drywall in stair 1, and fire caulk in stair shafts Level 2 - 2nd layer drywall

Heading 04/25/2024DAILY INSPECTIONDAVID COOKSPARTIAL4/25/2024 4:27:19 PM Level 4 top out 1st layer east corridor and Fire Caulk stair 1 shaft Level 2 2nd layer in the electrical room and fire caulk in stair 1 Level 1 North walls 2nd layer

Heading 04/29/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request4/21/2024 10:12:16 PM 4/21/2024 10:12 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 04/30/2024ROUGH MECHDAVID COOKSCORRECTIONS5/1/2024 4:38:17 PM Level 1 HVAC hot water test set @ 100 psi - reading was @ 80 psi - Air fill to 100 and retest 24hrs.

Heading 05/01/2024ROUGH MECHDAVID COOKSAPPROVED5/1/2024 4:40:21 PM HVAC hot potable line run and pressure test @ 100 psi - Levels 1 to roof and level 2 to 5 tested ok

Heading 05/01/2024SHEETROCKDAVID COOKSPARTIALeTRAKiT Inspection Request4/23/2024 9:42:44 PM 4/23/2024 9:42 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/1/2024 4:30:32 PM Level 1 east corridor elevator control room 1st and 2nd layer drywall Level 1-3 Restroom east wall first layer Level 5 shaft fire caulk at restroom and east wall

Heading 05/02/2024SLABDAVID COOKSAPPROVEDeTRAKiT Inspection Request4/23/2024 9:46:37 PM 4/23/2024 9:46 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/2/2024 4:50:59 PM Front and back walkway and ramp slab steel rebar inspection

Heading 05/03/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/23/2024 9:52:39 PM 4/23/2024 9:52 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/6/2024 12:42:24 AM Level 1second layer drywall in electrical room and level 2 first layer shaft, and top out frame inspection

Heading 05/06/2024DAILY INSPECTIONNICK GONZALESPARTIAL9:30 eTRAKiT Inspection Request4/23/2024 9:54:26 PM 4/23/2024 9:54 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/6/2024 1:18:30 PM - Level 4 drywall, screws, and caulking at stair wells (1st layer) - Mat slab for sump in between parking and warm shell (#4 16" o.c)

Heading 05/07/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/23/2024 9:55:51 PM 4/23/2024 9:55 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/10/2024 4:39:44 PM L5 building framing of the east corridor and bathrooms

Heading 05/08/2024U/G PLUMBINGDAVID COOKSPARTIALeTRAKiT Inspection Request4/23/2024 9:57:23 PM 4/23/2024 9:57 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/10/2024 4:43:28 PM Storm drains line run and connections - 20' x 8", 26' x 10" and 22' x 4" with stub-ups

Heading 05/09/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/23/2024 9:58:37 PM 4/23/2024 9:58 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/10/2024 4:32:23 PM Level 5 shaft framing and Level 1 top out drywall

Heading 05/10/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/23/2024 10:02:21 PM 4/23/2024 10:02 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/10/2024 4:34:29 PM Level 5 AF-105 east elevator shaft 1st layer drywall screw inspection and insulation

Heading 05/13/2024SHEETROCKDAVID COOKSPARTIALeTRAKiT Inspection Request4/23/2024 10:03:49 PM 4/23/2024 10:03 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/13/2024 2:13:02 PM Roof Deck - Shaft - drywall first layer and insulation Level 5 - top out around all gender restrooms Level 4 - Electrical room 2nd layer

Heading 05/14/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/23/2024 10:04:44 PM 4/23/2024 10:04 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/14/2024 4:39:43 PM Top roof deck - rail assembly - south end

Heading 05/14/2024ROUGH FRAMINGDAVID COOKSCORRECTIONS-VIRTUAL5/14/2024 4:35:53 PM Corrections: Roof deck railing assemble - screws missing in studs and bottom wall plate assembly.

Heading 05/15/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 9:34:54 PM 4/28/2024 9:34 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/16/2024 4:54:09 PM Roof parapet wall framing - and roof elevator framing

Heading 05/16/2024GAS PIPINGDAVID COOKSCORRECTIONS5/16/2024 5:08:00 PM Gas line from level on to roof Corrections: Add two hanger where needed at 90 degree turn and one side of a gas line splice point.

Heading 05/16/2024GAS TESTDAVID COOKSAPPROVED5/16/2024 5:09:26 PM Large 4' gas line test @ 70Psi for 24 hrs. running from level one to roof deck

Heading 05/16/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 9:37:03 PM 4/28/2024 9:37 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/16/2024 5:02:44 PM Roof deck parapet wall framing

Heading 05/17/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 9:39:34 PM 4/28/2024 9:39 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/17/2024 4:06:20 PM Roof level framing inspection around the penthouse and bottom rip of Densglass around the parapet to allow waterproofing to begin

Heading 05/20/2024DAILY INSPECTIONNICK GONZALESPARTIAL9 eTRAKiT Inspection Request4/28/2024 9:40:30 PM 4/28/2024 9:40 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/21/2024 6:52:57 AM - Partial in-wall insulation at level 1 security room OK Highlighted and noted on the plans for reference

Heading 05/21/2024DAILY INSPECTIONNICK GONZALESPARTIAL9 eTRAKiT Inspection Request4/28/2024 9:41:30 PM 4/28/2024 9:41 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/22/2024 3:11:30 PM - Shaft liner + fire caulking at top level shaft walls OK - Screw inspection/sheetrock at security room level 1 OK see plan set on job site to see highlighted plan sections

Heading 05/22/2024ROUGH MECHDAVID COOKSAPPROVEDeTRAKiT Inspection Request4/28/2024 9:42:30 PM 4/28/2024 9:42 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/23/2024 7:28:10 AM Three unit runs of supply risers from level 1 to roof - inspection before insulation wrap

Heading 05/23/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 9:43:26 PM 4/28/2024 9:43 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 5/24/2024 3:54:18 PM Generator yard shotcrete walls - steel rebar inspection Roof 1st layer denisglass shaft wall and framing parapet walls

Heading 05/24/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request4/28/2024 9:44:19 PM 4/28/2024 9:44 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 05/28/2024DAILY INSPECTIONNICK GONZALESCANCELLEDeTRAKiT Inspection Request4/28/2024 9:45:49 PM 4/28/2024 9:45 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 05/29/2024DAILY INSPECTIONDAVID COOKSCORRECTIONSeTRAKiT Inspection Request4/28/2024 9:47:52 PM 4/28/2024 9:47 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6502271957 e-Mail: cory.keller@truebeck.com 6/3/2024 12:44:47 AM Corrections Roof deck - top soffit framing screws missing at tower pan deck attachment

Heading 05/30/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 9:48:44 PM 4/28/2024 9:48 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 6/3/2024 12:33:35 AM Building level one north West soffit framing building level one south east exterior wall, framing, main electrical rooms, loading dock and water pump room and building level one first layer drywall at service elevator festival

Heading 05/31/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 9:49:44 PM 4/28/2024 9:49 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 6/3/2024 12:41:04 AM Roof deck, parapet, and soffit framing,

Heading 06/03/2024DAILY INSPECTIONNICK GONZALESPARTIAL9 eTRAKiT Inspection Request4/28/2024 9:55:20 PM 4/28/2024 9:55 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 6/4/2024 7:46:56 AM - Exterior Densglass at standby and main electrical rooms + insulation OK As noted and highlighted on the plans for reference

Heading 06/04/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 9:58:58 PM 4/28/2024 9:58 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 6/5/2024 3:01:19 PM Inspections: -Main Electrical room 1st layer rock -Water pump room 1st layer drywall on east and west walls and i solution on the north and south -Tenant Space room 1160 looked at 1st layer of rock -south east wall (back of L1 main electrical rm) looked at insulation wall. -level 1 west exterior soffit insolation

Heading 06/05/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 10:02:29 PM 4/28/2024 10:02 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 6/5/2024 3:11:46 PM Building Level 1 - 1st layer drywall inspection at the south west end wall (behind main electrical room) Building Level 1 - 2nd layer rock at the 1160 tenant room\ Rough Frame ceiling inspection: Entry foyer

Heading 06/06/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 10:04:19 PM 4/28/2024 10:04 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 6/6/2024 4:51:03 PM Roof deck tower exterior Denis glass inspection complete and drywall inspection level 2 and 1 shaft and lobby insulation outdoor canopy.

Heading 06/07/2024SHEETROCKDAVID COOKSPARTIALeTRAKiT Inspection Request4/28/2024 10:05:08 PM 4/28/2024 10:05 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 6/7/2024 3:51:14 PM Building Level 1 - 2nd layer drywall in the water pump room, 2nd layer drywall in the elevator vestibule room 1st layer drywall in the south and east bathroom walls Level 3 - shaft wall and fire caulking Building Level 4 - core board shaft wall and fire caulking, 2nd layer of drywall and electrical room Level 5 shaft wall and fire caulking at electrical riser room and top down above HVAC taps only

Heading 06/10/2024INSULATIONDAVID COOKSPARTIAL - VIRTUALeTRAKiT Inspection Request11/16/2023 8:53:13 AM 11/16/2023 8:53 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 6/10/2024 3:06:19 PM Stair #2 Level 5 insulation - electrical room, Level 4 insulation in mechanical shaft ,and East Locker wall insulation,

Heading 06/10/2024SHEETROCKDAVID COOKSPARTIAL - VIRTUAL6/10/2024 3:11:10 PM Level 3 North - 2nd layer drywall screw inspection , Level 2 south shaft 2nd layer, Level 1 2nd layer south wall in restrooms, back of elevator shaft 2nd layer, and first layer bath north end

Heading 06/11/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request11/16/2023 8:59:30 AM 11/16/2023 8:59 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 6/3/2024 11:49:22 AM Luis 650-722-1014

Heading 06/12/2024SHEETROCKDAVID COOKSPARTIALeTRAKiT Inspection Request11/16/2023 8:59:30 AM 11/16/2023 8:59 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 6/3/2024 11:49:50 AM Luis 650-722-1014 6/13/2024 7:24:48 AM Level 5 electrical room - 1st layer drywall screw inspection, mechanical shaft core board fire caulking, Level 4 Mechanical shaft south 2nd layer drywall and north shaft fire caulking Level 3 Mechanical shaft 2nd layer drywall screw inspection Level 1 Men's locker room west - top down first layer drywall and insulation

Heading 06/13/2024DAILY INSPECTIONDAVID COOKSPARTIALLuis 650-722-10146/13/2024 4:52:33 PM Level 5 drywall shaft walls 2nd layer Level 4 shaft wall fire resistive construction - fire caulk in core walls Level 1 2nd layer drywall Plus Level 1 Mechanical HVAC refrigerant line test run @ 500 psi for 24 hrs in gauge set in elevator control room

Heading 06/14/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request1/30/2024 11:15:56 AM 1/30/2024 11:15 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507309098 e-Mail: danny.hernandez@truebeck.com 6/3/2024 11:49:35 AM Luis 650-722-1014 6/14/2024 4:36:22 PM Level 1 to Level 5 framing inspection for one side drywall application and Electrical room drywall 2nd layer Exception Where electrical boxes sit directly back to back add a piece of 1/2 minimum drywall to between boxes to separate alone with boxes having puddy pad application .

Heading 06/17/2024DAILY INSPECTIONNICK GONZALESCANCELLED1:30 eTRAKiT Inspection Request1/25/2024 9:05:05 AM 1/25/2024 9:05 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 06/18/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request2/28/2024 10:51:51 AM 2/28/2024 10:51 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 6/18/2024 4:36:20 PM 1. UNDERGROUND ELECTRICAL: Onsite Gate A under ground conduit install of att line {40 feet) 2. UNDERGROUND PLUMBING: On site Gate B Recycled water line 3 Hour pressure test at 120 psi 3. UNDERGROUND PUMBING: Onsite 4” SS line 3 hour Pressure test 4. SHEETROCK: Building Level 1 Data Riser room First layer of Drywall 5. SHEETROCK: Building Level 3 IDF room First layer of Drywall 6. SHEETROCK: Building Level 5 IDF room First layer of Drywall INSPECTIONS HIGHLIGHTED ON PLANS AND PICTURES/ PLANS SENT FROM (LUIS -SUPERINTENDENT) VAI EMAIL IN ATTACHMENTS. 6/18/2024 4:38:32 PM 6/18 200 Twin Dolphin Inspection Summary B22-2731 B22-2206 IN CDPLANS FOLDER

Heading 06/20/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request4/23/2024 9:59:50 PM 4/23/2024 9:59 PM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 6/20/2024 5:03:50 PM Level 1 stair 2 shaft wall framing and west stair 2 shaft 1st layer rock. Level 1 Lobby west wall, and IDF room 1st layer drywall and building level 2 data riser room 1st layer drywall

Heading 06/21/2024DAILY INSPECTIONDAVID COOKSNOT READYeTRAKiT Inspection Request5/20/2024 1:58:04 PM 5/20/2024 1:58 PM TRUEBECK Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 06/24/2024SHEETROCKDAVID COOKSPARTIAL - VIRTUAL6/24/2024 1:49:17 PM Level one fire, cash room and lobby first layer drywall and second layer shaft and backside of stair number two walls

Heading 06/24/2024U/G PLUMBINGDAVID COOKSPARTIAL - VIRTUALMiguel 650-730-90616/24/2024 1:45:23 PM SDR 26 sewer line to grease separation containment . Note line leak pressure test required before full backfill

Heading 06/25/2024U/G PLUMBINGDAVID COOKSAPPROVED650.730.90616/25/2024 4:52:39 PM Unground sewer to grease trap run - air tested @ 4psi - 11min 6/25/2024 4:54:15 PM Plus above floor plumbing vent line water test Level 1 to 3

Heading 06/27/2024DAILY INSPECTIONDAVID COOKSPARTIAL650.730.90616/28/2024 8:03:27 AM Level 1 corridor Lobby 2nd layer drywall inspection and loading dock 1st layer Framing at South exit passageway insulation at Fire Commanded Center

Heading 06/27/2024ROUGH PLMGDAVID COOKSCORRECTIONSeTRAKiT Inspection Request6/18/2024 9:52:18 AM 6/18/2024 9:52 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 6/28/2024 7:54:43 AM Correction Cast Iron soil pipe and drain - midspan inwalls unsupported P601.3 exc. No -Hub cast iron soil pipe shall be supported with a riser clamp located at each floor. When the distance between floors is greater than 10 feet the vertical piping shall be supported every 10 feet using riser clamps where possible or rigid supports securely fastened to the building structure. 6/28/2024 3:47:44 PM CPC Table 313.3

Heading 06/28/2024INSULATIONDAVID COOKSPARTIALFEES DUE Luis 650-722-10146/28/2024 3:57:33 PM Men's restroom

Heading 06/28/2024ROUGH PLMGDAVID COOKSPARTIALeTRAKiT Inspection Request6/18/2024 9:55:45 AM 6/18/2024 9:55 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 6/28/2024 3:50:01 PM Plumbing vertical supports corrections made. Incurred Walls are ok to insulate

Heading 07/01/2024DAILY INSPECTIONSPENCER SMITHPARTIALFEES DUE Luis 650-722-10147/1/2024 4:00:08 PM FRAMING, SHEETROCK SCREWS AROUND SHAFT. FIRE CACHE ROOM 1105. RATED HARD LID SHAFT.

Heading 07/01/2024ROUGH FRAMINGSPENCER SMITHPARTIALeTRAKiT Inspection Request6/18/2024 9:55:45 AM 6/18/2024 9:55 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/1/2024 3:58:31 PM FRAMIG AROUND SHAFT. FIRE CACHE ROOM 1105.

Heading 07/02/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request6/18/2024 9:56:35 AM 6/18/2024 9:56 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/2/2024 4:09:02 PM 1. FIRST FLOOR - DMV TEST ROUGH PLMG. 2. 5TH FLOOR - SHAFT LINER / SHEET ROCK & FIRE SEALER. 3. 1ST FLOOR - FRAMING, BOTTOM AROUND CAST CORE PERIMETR ONLY. 4. 1ST FLOOR - 1ST LAYER EXIT PASSAGEWAY. 5. 1ST FLOOR - INSULATION AT LOBBY.

Heading 07/02/2024DAILY INSPECTIONSPENCER SMITHPARTIALFEES DUE Luis 650-722-10147/2/2024 4:10:58 PM THRUST BLOCK & FORMS/ FOOTINGS FOR FIRE HYDRANT PIPE UNDERNEATH PLANTER BOX.

Heading 07/03/2024DAILY INSPECTIONSPENCER SMITHPARTIALFEES DUE Luis 650-722-10147/3/2024 12:02:47 PM SHEET ROCK - 1ST FLOOR - FIRE COMMAND CENTER. FRAMING - 1ST FLOOR - MPOE AND BLDG ENG/ DOCK MANAGER. INSULATION - EXTERIOR WALL FOR BLDG ENG/ DOCK MANAGER.

Heading 07/03/2024ROUGH FRAMINGSPENCER SMITHPARTIALeTRAKiT Inspection Request6/18/2024 9:56:35 AM 6/18/2024 9:56 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/3/2024 11:58:23 AM INTERIOR SHAFT WALLS AND HALLWAY TO FLOORS 1 THROUGH 5. 7/3/2024 12:03:40 PM HALLWAY / ELEVATOR LOBBY. 2 THROUGH 5. **

Heading 07/05/2024DAILY INSPECTIONNICK GONZALESCANCELLEDeTRAKiT Inspection Request6/18/2024 9:57:19 AM 6/18/2024 9:57 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 07/05/2024DAILY INSPECTIONNICK GONZALESCANCELLEDFEES DUE Luis 650-722-1014

Heading 07/05/2024DAILY INSPECTIONTHOMAS SILIPIN JRCANCELLEDFEES DUE Luis 650-722-1014

Heading 07/05/2024ROUGH FRAMINGTHOMAS SILIPIN JRCANCELLEDeTRAKiT Inspection Request6/18/2024 9:57:19 AM 6/18/2024 9:57 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 07/08/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request6/18/2024 9:57:54 AM 6/18/2024 9:57 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/8/2024 11:06:58 AM EXTERIOR LATH / WIRE. 7/8/2024 11:10:06 AM PERIMETER OF PENTHOUSE EXTERIOR WALLS.

Heading 07/09/2024DAILY INSPECTIONTINO PADILLAAPPROVEDFEES DUE Luis 650-722-10147/9/2024 3:57:24 PM Approval noted on the plans at the job site.

Heading 07/10/2024DAILY INSPECTIONDAVID COOKSPARTIALFEES DUE Luis 650-722-10147/11/2024 7:40:36 AM Insulation: Level 1 MPOE, Building Dock Room, and elevator lobby entry Drywall Level 1 2nd layer main corridor and lobby Exterior Lath North elevation Back Flow water pressure test

Heading 07/10/2024ROUGH PLMGDAVID COOKSPARTIALeTRAKiT Inspection Request6/18/2024 9:57:55 AM 6/18/2024 9:57 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/10/2024 5:04:47 PM Level 1 plumbing domestic cold water fill test @ 80PSi, L1 - L2 mains and distribution piping domestic Hot water tested @ 80psi, L1 - L4 domestic cold water mains and L1 distribution piping tested @ 120 psi, exterior unground flex tendons and main hole grease inceptor water test

Heading 07/11/2024EXTERIOR LATH /WIREDAVID COOKSFEES DUE Luis 650-722-10147/12/2024 4:39:34 PM Corrections: Improper start lap and screw missing / loose wire at the south end of the lath series

Heading 07/11/2024SHEETROCKDAVID COOKSPARTIAL7/12/2024 4:49:03 PM Drywall screw inspection - Level 4 electrical riser room 2nd layer - Level 5 All gender room and Stair shaft Levels 1 to 5

Heading 07/12/2024EXTERIOR LATH /WIREDAVID COOKSAPPROVEDFEES DUE Luis 650-722-10147/12/2024 4:42:10 PM Roof Deck tower south and east end - corrections made ok to scratch.

Heading 07/15/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 7:34:52 AM 7/5/2024 7:34 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/15/2024 3:09:06 PM LEVEL 1: LOBBY CEILING FRAMING. LEVELS 2 THROUGH 5: ELEVATOR VESTIBULE, TENANT ROOMS, ALL GENDER RESTROOMS, JANITOR AND STORAGE ROOM.

Heading 07/16/2024INSULATIONDAVID COOKSCORRECTIONSeTRAKiT Inspection Request7/5/2024 7:34:52 AM 7/5/2024 7:34 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/18/2024 7:53:43 AM Stair shaft insulation levels 2 thru 5 Corrections: Level 2 thru 5 stair shaft - insulation missing in the narrow corners and will need to be address before drywall - submit photos

Heading 07/17/2024SHEETROCKDAVID COOKSPARTIALeTRAKiT Inspection Request7/5/2024 7:36:19 AM 7/5/2024 7:36 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/18/2024 7:59:01 AM Level 1 drywall 1st layer at elevator lobby north entry, Framing and shaft liner core board stair 3 shaft , and roof level insulation at west elevation and shaft liner assembly at west stair shaft area.

Heading 07/18/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 7:36:20 AM 7/5/2024 7:36 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/18/2024 3:41:50 PM 1. LEVEL 1: INSULATION AROUND CORNER OF FIRE CACHE ROOM. AND WALL ON THE OUTSIDE OF BUILDING LOBBY 1000. 2. LEVEL 1: ALL DUCT SUPPORTS WITH EXCEPTION TO 1 CHANGE OF DIRECTION IN THE FIRE COMMAND CENTER OR IN THE ELECTRICAL RISER ROOM?

Heading 07/19/2024DAILY INSPECTIONDAVID COOKSPARTIALeTRAKiT Inspection Request7/5/2024 7:36:20 AM 7/5/2024 7:36 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/22/2024 11:54:49 AM Level one installation at stair three shaft wall Roof first layer dens glass inspection, installation at penthouse corridor, and shaft wall assemble at stair three

Heading 07/22/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 7:37:29 AM 7/5/2024 7:37 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/22/2024 4:16:25 PM LEVEL 1 : INSULATION - 1ST LAYER - STAIR 3 EXIT PASSAGEWAY. INSULATION - 2ND LAYER - ELEVATOR LABBY, NORTH CORRIDOR. LEVEL 2 THROUGH 5 : STAIR 3 FRAMING. ROOF : ELECTRICAL ROOM SHAFTWALL ASSEMBLY AND FRAMING. STAIR 2 - 2ND LAYER INSULATION SHAFT WALL.

Heading 07/23/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 7:37:29 AM 7/5/2024 7:37 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/23/2024 4:39:46 PM ROUGH FRAMING LEVELS 2 THROUGH 5. INSULATION LEVEL 2. PRESSURE TEST, OVER HEAD RETURN LINE, 90 PSI, LEVELS 2 THROUGH 5. 7/23/2024 4:40:24 PM WATER BOND FOR WATER MAIN INTO BUILDING. 7/24/2024 4:36:17 PM RECAP: Level 1-5 Mechanical piping at west system Level 2 Insulation at west shaft walls Level 2-5 framing at elec riser/elevator vestibule walls Level 1 Ground bonding at locker room pipe

Heading 07/24/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 7:37:29 AM 7/5/2024 7:37 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/24/2024 4:34:47 PM 1. MECHANICAL DUCT SUPPORTS LEVELS 2 THROUGH 5. 2. 1ST AND 2ND LAYER SHEETROCK LEVELS 1 THROUGH 5. 3. INSULATION FOR 2ND LEVEL AROUND RIGHT SHELL PERIMETER. 7/24/2024 4:35:28 PM RECAP: Level 2-5 Mechanical Duct Supports Level 1-5 Stair 1 1st layer drywall Level 1 stair 3 exit corridor 2nd layer and insulation, 1st layer stair 2 vestibule, 2nd layer outer fire cache room, 1st layer east lobby wall on open space side Level 2 insulation at restroom core 8’ down from ceiling to allow framing of ceilings

Heading 07/25/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 7:38:24 AM 7/5/2024 7:38 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/25/2024 4:39:25 PM 1. FIRST FLOOR RESTROOMS: DHW PRESSURE TEST 100 PSI. LABELING IN PROCESS, WILL SEND PICTURES OR VERIFICATION IN PERSON BEFORE CLOSE UP. 2. FIRST FLOOR RESTROOMS: DCW PRESSURE TEST 100 PSI. LABELING IN PROCESS 3. FIRST FLOOR LOCKR ROOMS: OK TO COVER LAVIES L-1A. WILL SEND PHOTOS OR IN PERSON VERIFICATION OF ELECTRICAL CONDUIT WRAP PROTECTION FROM COPPER PIPES BEFORE COVER UP.

Heading 07/26/2024U/G PLUMBINGTINO PADILLA(AE) APPROVED W/EXCEeTRAKiT Inspection Request7/5/2024 7:38:24 AM 7/5/2024 7:38 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/26/2024 3:55:39 PM Approved with exception pending Engineering inspection for underground plumbing pipe, approval noted on the approved set of plans at the job site.

Heading 07/29/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 7:38:24 AM 7/5/2024 7:38 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/29/2024 3:25:19 PM Level 1, 2, and 3 Drywall and insulation

Heading 07/30/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 10:43:49 AM 7/5/2024 10:43 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/30/2024 4:14:04 PM Level 2 2nd layer drywall at room 2109 Tenant space Level 4 Insulation around core walls Levels 3-5 Edge of deck insulation.

Heading 07/31/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 10:43:49 AM 7/5/2024 10:43 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 7/31/2024 3:34:00 PM Level 1 Recycled water lines at Locker and Restrooms, pressure gauge witnessed at 100PSI Roof Level: Stair 1 final layer drywall at shaft wall and fire caulking ready for to insulate.

Heading 08/01/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 10:43:50 AM 7/5/2024 10:43 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/1/2024 4:01:35 PM Stair 1 Levels 1-5 2nd layer Level 1 Framing at locker room/restrooms. All in wall ok Insulation around building engineer shop room Final layer at loading bay corridor Levels 2 and 3 1st and 2nd layer around core Roof Fire sealing spray at edge of deck from 7 line West to North side of building along 1.3 line

Heading 08/02/2024ELECT SERVICESPENCER SMITHCANCELLED

Heading 08/02/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 10:47:04 AM 7/5/2024 10:47 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/2/2024 3:19:41 PM Level 1 Women’s restroom framing ok to insulate Level 2 Insulation at electrical room hallway side Roof level Soffit framing at west elevation and 2nd layer drywall

Heading 08/05/2024ELECT SERVICESPENCER SMITHAPPROVEDeTRAKiT Inspection Request7/25/2024 3:10:32 PM 7/25/2024 3:10 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/5/2024 4:36:44 PM GREEN TAGGED PROVIDED FOR MSB 1 & MSB2 MAIN PANELS

Heading 08/05/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request1/31/2024 9:04:58 AM 1/31/2024 9:04 AM TRUEBECK Contact Name: TRUEBECK Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 8/5/2024 4:42:24 PM 1. Building L1 Soffit framing at North East 2. Building L1 Stair 3 Exterior 2nd layer Drywall, North corridor 1st layer drywall, Restroom inwall insolation, stair 2 east and south wall rough -in 3. Building L2 Stair 2 east wall rough in, stair 2 west wall framing, L2 restroom wall rough-in 4. Building L3 Stair 2 east wall rough in, stair 2 west wall framing, IDF room Exterior Wall 1st layer 5. Building L4 Stair 2 east wall rough in Stair 2 west wall framing, IDF room Exterior Wall 1st layer 6. Building L5 Stair 2 west wall framing, IDF room Exterior Wall 1st layer 7. Building Roof Electrical room interior rough-in and insolation at east walls, Parapet exterior drywall on south end of building, north penthouse corridor framing of the south wall and restrooms

Heading 08/05/2024ROUGH FRAMINGSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 10:47:04 AM 7/5/2024 10:47 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/5/2024 4:43:29 PM Building L1 Soffit framing at North East

Heading 08/06/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/5/2024 10:47:04 AM 7/5/2024 10:47 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/6/2024 5:17:38 PM WAITING ON DAILY REPORT FROM SUPERINTENDENT LUIS. 8/7/2024 5:05:04 PM Building Roof soffit in wall Building Level 5 Stair 1 Exterior shaft perimeter insolate, Stair 2 vestibule east wall insolation Building Level 4 Stair 1vestibule east wall insolation , Elevator corridor and shaft 1st layer rock, Building Level 3 Restroom in wall Cast iron, Elevator cooridor first layer drywall, Stair 2 Vestibule east wall insolation Building Level 2 Stair 2 South East Insolation Building Level 1 North exterior soffit framing grids 16-17 at cc,

Heading 08/07/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/25/2024 3:14:55 PM 7/25/2024 3:14 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/7/2024 5:01:15 PM Level 3 drywall, insulation and fire caulking at floor plumbing penetrations Level 4 drywall insulation and fire caulking at floor plumbing penetrations Roof level drywall at electrical room

Heading 08/08/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/25/2024 3:14:55 PM 7/25/2024 3:14 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/8/2024 4:22:34 PM WAITING FOR MIGUEL TO SEND INSPECTION REPORT. 8/12/2024 7:02:29 AM Level 2 insulation Level 3 reclaimed water under pressure Level 4 1st layer stair 2 vestibule wall Roof Level final layer Electrical room

Heading 08/09/2024INSULATIONTINO PADILLAAPPROVEDeTRAKiT Inspection Request7/25/2024 3:14:55 PM 7/25/2024 3:14 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/9/2024 4:30:43 PM Approval noted on the approved set of plans.

Heading 08/12/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/25/2024 3:14:55 PM 7/25/2024 3:14 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/12/2024 4:40:37 PM Building L1 Main Electrical Room Courtesy inspection of ATS-S1 clearances (22” to the right hand side, 44” to the left. Building L1 1st layer Lid ceiling East of Stair 2 Building L4 Electrical Riser Corridor Insolation Building L5 Electrical Riser-Service elevator Corridor Insolation, Tenant Rooms (exterior) Insulation, Stair 2 exterior corridor Insulation, Stair 3 exterior corridor insulation Building RF level exterior West entryway soffit Hard lid drywall inspection Building L4 restroom Cast iron Inwall Inspection

Heading 08/13/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/25/2024 3:14:56 PM 7/25/2024 3:14 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/13/2024 4:46:50 PM Building Level 1 copper Hot Water line in the water tank Room tested under 100 psi pressure to the L4 Restrooms Building Roof Stair 1 inwall and framing Building L5,L4,L3 and L2 Framing Stair 2 Building L4 tenant storage Rm 1st layer rock on exterior corridor, service Elevator corridor 1st layer rock, restroom Corridor first layer rock , stair 1 and shaft exterior perimeter 1st layer rock Building L3 Tenant Rm 1st layer rock, Electrical Riser room corridor insolation, Stair 2 outer perimeter 1st rock layer Building L2 Electrical Riser Room Corridor 1st Layer Building L1 Service Yard pad

Heading 08/14/2024INSULATIONSPENCER SMITHAPPROVEDeTRAKiT Inspection Request7/25/2024 3:14:56 PM 7/25/2024 3:14 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/14/2024 4:32:41 PM INTERIOR WALL FOR LEVEL 3 STAIR #3.

Heading 08/14/2024GAS TESTSPENCER SMITHAPPROVEDMiguel 650-730-90618/14/2024 4:33:50 PM PRESSURE TEST AT PG&E CONNECTION POINT, RIGHT BEFORE THE EARTHQUAKE VALVE. 100 PSI. PROVIDED GAS TAG.

Heading 08/15/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request7/25/2024 3:14:56 PM 7/25/2024 3:14 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/15/2024 4:50:53 PM Levels 1-5 insulation and drywall Level 4 CW/RW at restrooms. Verified pressure test at level 1.

Heading 08/16/2024DAILY INSPECTIONSPENCER SMITHPARTIAL - VIRTUALMiguel 650-730-90618/16/2024 2:18:46 PM Waiting on report for insulation in core stair shaft. 8/16/2024 3:45:46 PM Office Building stair 1 roof level wall framing and south wall insolation, stair 2 in wall and insolation level 5-1

Heading 08/19/2024DAILY INSPECTIONSPENCER SMITHPARTIAL8/19/2024 3:43:55 PM Levels 2-6 service elevator front Shaft wall assembly/fire caulking Levels 2-5 insulation and drywall at multiple locations

Heading 08/20/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/12/2024 3:09:54 PM 8/12/2024 3:09 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/20/2024 4:10:54 PM Level 1-4 Stair 3 vestibule drywall Level 1 elevator front shaft wall assembly at service and main elevators Level 1 perimeter soffit dens glass at bottom track and vertical leg for waterproofing

Heading 08/21/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request8/12/2024 3:09:54 PM 8/12/2024 3:09 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/21/2024 3:25:14 PM LEVEL 3, STAIR 3 SHEETROCK. 8/22/2024 4:05:27 PM PENDING 1 WALL BEHIND PLUMBING PIPES

Heading 08/22/2024INSULATIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/12/2024 3:09:55 PM 8/12/2024 3:09 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/22/2024 4:06:21 PM Levels 2-6 Deck Edge insulation Level 1 Stair 1 shaft wall insulation

Heading 08/23/2024ROUGH PLMGDAVID COOKSAPPROVEDeTRAKiT Inspection Request8/12/2024 3:09:55 PM 8/12/2024 3:09 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/26/2024 1:34:26 PM Level 5 DWV water level leak test

Heading 08/26/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/12/2024 3:09:55 PM 8/12/2024 3:09 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/26/2024 4:03:19 PM DWV PRESSURE TEST FOR LEVEL 5. SHEETROCK FOR STAIR 2 SHAFT - LEVELS 1-5, FIRST LAYER. 8/27/2024 4:14:44 PM Levels 1-5 stair 2 1st layer Level 2 Stair 2 vestibule 1st layer Level 5 DWVs at restroom cores

Heading 08/27/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/12/2024 3:09:55 PM 8/12/2024 3:09 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/27/2024 4:14:09 PM Level 5 stair 2 vestibule 1st layer Level 1 stair 2 completed 1st layer at shaft wall Level 1 electrical rough-in at service elevator front wall (missing fire-caulking, ok to proceed with insulation)

Heading 08/28/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:45:53 PM 8/14/2024 1:45 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/28/2024 4:01:10 PM Recap: Level 5 DW hot and cold, Recycled water. Pressure verified at 100 and 80 PSI Roof level lathe at East side of penthouse, Roof level spray at deck edge Level 4 drywall at stair 2 vestibule and firecaulking at service elevator front Level 3 drywall at stair 2 vestibule and firecaulking at service elevator front Level 1 Men’s/Women’s locker final layer drywall all around Level 1 Final layer at Janitor’s closet and All Gender Level 1 1st layer at stair 2 vestibule and insulation at fire cache room.

Heading 08/29/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:45:53 PM 8/14/2024 1:45 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/29/2024 3:43:07 PM Recap: Level 2/3 overhead caulking completed at restrooms. Ok to rock Level 1-3 service elevator front insulation, ok to rock Level 1 final layer drywall at all gender restroom and tenant room Level 1 ceiling shaft assembly framing, ok to insulate Level 1 stair 2 shaft wall 2nd layer Level 1 Fire cache room ceiling 1st layer Roof west elevation lath/ wire inspection ok to scratch coat

Heading 08/30/2024FIRE PRE-ACTION SYSTEMSDAVID COOKSPARTIALeTRAKiT Inspection Request8/14/2024 1:45:53 PM 8/14/2024 1:45 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 8/30/2024 4:33:55 PM inspection of the fire safing at the slab edge to curtain wall system. Level 4 and 5 at the terraces.

Heading 09/03/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:45:54 PM 8/14/2024 1:45 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/3/2024 4:46:34 PM WAITING FOR REPORT TO BE SENT.

Heading 09/04/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:47:43 PM 8/14/2024 1:47 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/4/2024 4:51:26 PM Levels 1, 2, 3 and 5 service elevator vestibule drywall 1st and 2nd layers Stair 2 levels 1-3.5 2nd layer Level 2 women's restroom 1st layer all around Roof level deck edge fire safing insulation at north side and onto east side

Heading 09/05/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:47:43 PM 8/14/2024 1:47 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/5/2024 4:59:44 PM Level 1 service elevator vestibule ceiling framing and ceiling insulation at engineer shop room Level 1 framing at stair 2 back wall Level 2 insulation at all gender restroom and janitor rooms Level 2 men’s restroom final layer drywall Level 4 service elevator vestibule 1st layer Level 5 service elevator vestibule final layer Roof spray fire proofing at perimeter along north side onto east side Roof desdeck at parapet

Heading 09/06/2024INSULATIONTINO PADILLAPARTIALeTRAKiT Inspection Request8/14/2024 1:47:43 PM 8/14/2024 1:47 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/6/2024 2:19:28 PM Partial Inspection noted on the approved plan at the job site, Recap Level 2 Men’s restroom, all gender restroom and janitors room final layer drywall Level 4 Service elevator vestibule final layer Level 5 Service elevator front 1st layer and parapet densedeck at outside face

Heading 09/09/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:47:44 PM 8/14/2024 1:47 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/9/2024 3:10:44 PM Level 1: Shaft bottom ceiling at security room 1st layer at Service elevator vestibule ceiling Level 1-5: final layer at Stair 2 vestibule Level 4 up to 5: Stair 2 final layer

Heading 09/10/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:52:30 PM 8/14/2024 1:52 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/10/2024 4:03:23 PM Recap: Level 1 Elevator lobby wall final layer Level 3 insulation at all gender restrooms, janitor room, tenant room and women’s restroom. Drywall at men’s restroom complete Level 4 insulation at tenant room Level 5 1st layer at stair 3, Framing and drywall at davit storage room and deck edge insulation

Heading 09/11/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:52:30 PM 8/14/2024 1:52 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/11/2024 4:02:35 PM WAITING ON REPORT. 9/12/2024 4:51:28 PM Level 1 Security room ceiling insulation and security storage room final layer drywall Level 5 Davit Storage room final layer on rated wall and perimeter fire safing spray Roof level restroom DWV head water test

Heading 09/12/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:52:30 PM 8/14/2024 1:52 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/12/2024 7:41:11 AM Level 1 Security room ceiling insulation and security storage room final layer drywall Level 5 Davit Storage room final layer on rated wall and perimeter fire safing spray Roof level restroom DWV head water test 9/12/2024 4:52:09 PM **ABOVE IS THE REPORT FOR 9/11/24. 9/12/2024 4:52:36 PM Level 1 1st layer hardlid Level 2 Drywall at tenant room and lobby back wall. Insulation at deck edge on west side of building Level 3 Drywall at women’s restroom and all gender restroom and stair 3 wall Level 4 Insulation at all restrooms Level 5 Final layer drywall at west shaft wall Roof Level restroom Domestic water pressure test to 100 psi.

Heading 09/13/2024ROOF PRE-FOAMTINO PADILLAAPPROVEDeTRAKiT Inspection Request8/14/2024 1:52:30 PM 8/14/2024 1:52 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/13/2024 3:55:18 PM Foam spray approved at exterior, approval noted on the approved set of plans at the job site.

Heading 09/17/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:55:05 PM 8/14/2024 1:55 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/17/2024 6:58:51 AM Level 1 Security room ceiling final layer Level 3 Back wall of men’s restroom final layer Level 4 Final layer at Restrooms Level 5 Insulation at Restrooms

Heading 09/17/2024DAILY INSPECTIONSPENCER SMITHCANCELLEDeTRAKiT Inspection Request8/14/2024 1:55:05 PM 8/14/2024 1:55 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/17/2024 4:31:05 PM CANCELLED INSPECTIONS.

Heading 09/18/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:55:05 PM 8/14/2024 1:55 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/18/2024 4:54:24 PM Roof level mechanical piping pressure verification at multiple lines.

Heading 09/19/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request8/14/2024 1:55:06 PM 8/14/2024 1:55 PM Mike Chae Contact Name: Miguel Rangel Site Address: 200 Twin Dolphin Dr. Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/19/2024 4:12:19 PM Level 1 Security room wall framing Level 2-5 elevator front shaft wall assembly and door pocket insulation and drywall Level 3 final layer on stair 3 walls Roof level pressure gauges for mechanical piping

Heading 09/20/2024DAILY INSPECTIONTINO PADILLAAPPROVEDMiguel 650-730-90619/20/2024 12:38:27 PM Approval noted on the approved set of plans at the job site.

Heading 09/20/2024SHEETROCKTINO PADILLAAPPROVEDMiguel 650-730-9061

Heading 09/23/2024DAILY INSPECTIONSPENCER SMITHPARTIALMiguel 650-730-90619/23/2024 2:32:19 PM Levels 2-Roof - insulation at elevator front walls Roof - insulation at stair 2 walls and framing of stair 2 vestibule. - framing and 1st layer top down on all gender restrooms - insulation and electrical rough in at electrical room - framing at corridor to stair 1

Heading 09/24/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:01:32 AM 9/17/2024 7:01 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/24/2024 6:05:37 PM Roof level - Wall framing, in wall rough and insulation. OK to rock.

Heading 09/25/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:05:37 AM 9/17/2024 7:05 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/25/2024 3:34:50 PM Level 1,2,3 and 5 1st layer elevator front Level 2,3, and 4 stuff and spray at deck edge Level 2,3,4 and 5 stair 3 shaft walls Roof drywall, insulation and shaft wall

Heading 09/26/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:05:38 AM 9/17/2024 7:05 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/26/2024 3:29:39 PM 6TH FLOOR / PENTHOUSE EQIUPMENT ROOM,RIGHT SIDE WALL, 2ND AND FINAL LAYER.

Heading 09/27/2024INSULATIONRED TEAMPARTIAL9/28/2024 6:56:34 PM Stairwell #3 to 2nd floor

Heading 09/27/2024SHEETROCKJONATHAN THOMASPARTIAL9 eTRAKiT Inspection Request9/17/2024 7:05:38 AM 9/17/2024 7:05 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/28/2024 6:54:12 PM Level 6 at elevator doors outside of electrical closet. Level 3 elevator lobby and soffit at lobby entries. Level 2 elevator lobby soffits at exterior of lobby. Level 1 elevator lobby not finished, Miguel to send finished pictures.

Heading 09/30/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:05:38 AM 9/17/2024 7:05 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 9/30/2024 4:29:32 PM Level 3-6 Stuff and Spray fire proofing at the north slab edge Level 3 stair 3 insulation Level 3 and 4 insulation around stair 3 perimeter walls and 2nd layer at elevator lobby soffits Level 4 1st layer at elevator front, framing at shaft wall around stair 3 Level 5 final layer at elevator front Level 6 final layer at stair 2 and 1st layer at elevator front

Heading 10/01/2024DAILY INSPECTIONJONATHAN THOMASPARTIAL10 eTRAKiT Inspection Request9/17/2024 7:07:30 AM 9/17/2024 7:07 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/1/2024 6:19:30 PM 6th floor single elevator lobby fire wall. 4th floor (Miguel to email pictures when finished). 10/2/2024 7:15:14 AM sheetrock was yesterday's inspections. 10/8/2024 8:52:38 AM contractor sent photos of level 4 elevator wall 2nd layer sheetrock finished. will attach.

Heading 10/01/2024INSULATIONRED TEAMPARTIAL10/1/2024 6:34:07 PM 4th to 3rd floor stairwell

Heading 10/02/2024INSULATIONTHOMAS SILIPIN JRAPPROVEDeTRAKiT Inspection Request9/17/2024 7:07:30 AM 9/17/2024 7:07 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 10/03/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:07:31 AM 9/17/2024 7:07 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/3/2024 4:48:52 PM Level 1 security room final layer drywall inside room, also ok to rock at door opening for door install. Elevator furring wall final layer Level 2-5 stair 3 vestibule ceiling framing ok to rock Roof level insulation at corridor, ceiling framing ok to rock at all gender restrooms

Heading 10/04/2024SHEETROCKTINO PADILLAPARTIALeTRAKiT Inspection Request9/17/2024 7:07:31 AM 9/17/2024 7:07 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/4/2024 12:34:05 PM Partial noted on the approved set of plans on site.

Heading 10/07/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:08:59 AM 9/17/2024 7:08 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/7/2024 3:19:58 PM Level 1 final layer at security room, hardlid framing at cooridors Roof Level insulation and final layer at elevator front

Heading 10/08/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:09:00 AM 9/17/2024 7:08 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/8/2024 3:51:20 PM Level 1 Domestic water pump room all equipment approved and ready for power up Level 3-4.5 stair 3 1st layer drywall Roof level all gender restrooms final later drywall and 1st layer elevator lobby/storage room walls

Heading 10/09/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:09:00 AM 9/17/2024 7:08 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/9/2024 4:32:33 PM Level 1-4 final layer stair 3 walls Level 5 1st layer on south wall only

Heading 10/10/2024SHEETROCKTINO PADILLAPARTIALeTRAKiT Inspection Request9/17/2024 7:09:00 AM 9/17/2024 7:08 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/10/2024 12:57:44 PM Partial approval noted on the job site on the approved set of plans.

Heading 10/11/2024DAILY INSPECTIONTINO PADILLAPARTIALeTRAKiT Inspection Request9/17/2024 7:10:20 AM 9/17/2024 7:10 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/11/2024 11:59:22 AM Partial noted on the approved set of plans at the job site on the inspection report.

Heading 10/14/2024INSULATIONSPENCER SMITHCANCELLEDeTRAKiT Inspection Request9/17/2024 7:10:20 AM 9/17/2024 7:10 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/14/2024 3:38:58 PM CANCELLED INSPECTION FOR TODAY.

Heading 10/15/2024SHOWER PANDAVID COOKSAPPROVEDMiguel 650-730-906110/16/2024 8:05:32 AM Shower pan seal and test - 6 stalls

Heading 10/15/2024SHEETROCKDAVID COOKS(AE) APPROVED W/EXCE10/16/2024 8:11:43 AM Level 3 and 4 - stair 3 perimeter walls final layer Levels 4 stair 3 vestibule hard-lid drywall Exception: Missing drywall screws - install and submit photos

Heading 10/15/2024ROUGH MECHDAVID COOKSPARTIAL10/16/2024 8:08:43 AM VRF line run test Roof to level 1 - pressure test @ 600 psi

Heading 10/16/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:10:21 AM 9/17/2024 7:10 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/16/2024 3:43:00 PM Level 1 Shower pan drain test at men’s/women’s locker room ADA shower Level 2 Stair 3 vestibule hardlid drywall, drywall at stair 3 walls on north and south side Roof Level drywall at multiple locations and framing at service elevator vestibule

Heading 10/17/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:11:42 AM 9/17/2024 7:11 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/17/2024 4:06:46 PM PENTHOUSE SHEETROCK. RIGHT WALLS FROM ELEVATOR SHAFT

Heading 10/18/2024INSULATIONTINO PADILLACANCELLEDeTRAKiT Inspection Request9/17/2024 7:11:42 AM 9/17/2024 7:11 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com

Heading 10/21/2024ROUGH FRAMINGSPENCER SMITHCANCELLEDeTRAKiT Inspection Request9/17/2024 7:11:42 AM 9/17/2024 7:11 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/21/2024 3:50:52 PM NOT READY.

Heading 10/22/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:13:49 AM 9/17/2024 7:13 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/22/2024 4:26:32 PM UNDER GROUND ELECTRICAL - SITE LIGHTING CONDUIT. 2ND LAYER OF DRYWALL - 6TH FLOOR ROUGH ELECTRICAL - ELECTRICAL SERVICE TORQUE TEST ON BREAKERS.

Heading 10/23/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:13:49 AM 9/17/2024 7:13 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/23/2024 4:51:14 PM WAITING ON REPORT FROM SUPERINTENDENT. 10/24/2024 8:20:25 AM Mechanical Penthouse Insulation/ 2nd Layer Drywall/Tape Site Concrete – Retaining wall and Bench Rebar L1 Electrical Room – Breaker Torque Testing L6 Electrical Room Breaker Torque Testing

Heading 10/24/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:13:49 AM 9/17/2024 7:13 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/24/2024 4:46:19 PM WAITING FOR REPORT

Heading 10/25/2024ELECT SERVICESPENCER SMITHPARTIALeTRAKiT Inspection Request9/17/2024 7:13:49 AM 9/17/2024 7:13 AM Mike Chae Contact Name: Miguel Rangel Site Address: 200 TWIN DOLPHIN DR Phone: 6507309061 e-Mail: miguel.rangel@truebeck.com 10/25/2024 2:31:32 PM TORQUE TEST FOR PARKING GARAGE ELECTRICAL ROOM.

Heading 10/28/2024DAILY INSPECTIONSPENCER SMITHCANCELLEDeTRAKiT Inspection Request10/16/2024 7:49:15 AM 10/16/2024 7:49 AM Mike Chae Contact Name: Jack Stryer Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 10/28/2024 4:03:38 PM CANCELLED INSPECTION FOR TODAY 10-28.

Heading 10/29/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request10/16/2024 7:49:15 AM 10/16/2024 7:49 AM Mike Chae Contact Name: Jack Stryer Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 10/29/2024 4:35:48 PM 6” SD and L2/L3 Final Layer Drywall at elevator lobbies.

Heading 10/30/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request10/16/2024 7:49:15 AM 10/16/2024 7:49 AM Mike Chae Contact Name: Jack Stryer Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 10/30/2024 4:47:58 PM SHEETROCK CORNER BY ELEVATOR SHAFT ON LEVELS 4 & 5.

Heading 10/31/2024ROUGH ELECTRICSPENCER SMITHCANCELLEDeTRAKiT Inspection Request10/16/2024 7:49:16 AM 10/16/2024 7:49 AM Mike Chae Contact Name: Jack Stryer Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 10/31/2024 4:49:35 PM CANCELLED INSPECTION FOR TODAY.

Heading 11/01/2024SHEETROCKTINO PADILLAAPPROVEDeTRAKiT Inspection Request10/16/2024 7:49:16 AM 10/16/2024 7:49 AM Mike Chae Contact Name: Jack Stryer Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 11/1/2024 3:40:55 PM Approval noted on the approved set of plans at the job site. 1st layer 58/" sheetrock approved.

Heading 11/04/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request10/16/2024 8:52:50 AM 10/16/2024 8:52 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 11/4/2024 3:35:46 PM INSUALTION LEVEL 1, OFFICE AND SHEETROCK LEVEL 1 OFFICE, AND LEVEL 2 OUTSIDE OF STAIR WAY 3 SHAFT. 11/5/2024 7:12:24 AM 2nd layer Drywall (property management room) Insulation (property management room) 2nd layer drywall – L2 stair 3 exterior wall north

Heading 11/05/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request10/16/2024 8:52:51 AM 10/16/2024 8:52 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 11/5/2024 2:32:27 PM L1 property management room - 1st layer drywall L1 Mens and Womens Restroom - Cafco Ceiling Firesafing L1 Elevator Lobby - Ceiling Framing

Heading 11/06/2024ROUGH FRAMINGJONATHAN THOMASCANCELLEDjack 650.315.049111/6/2024 1:49:44 PM No framing inspection today.

Heading 11/06/2024SHEETROCKJONATHAN THOMASPARTIAL - VIRTUAL11/6/2024 1:54:29 PM Inspected 3 rated walls, not stuffed and sprayed at the top yet, on the second floor main lobby entrance that travel from the first to the third floor lobby areas. 11/25/2024 3:18:33 PM pictures of areas inspected today and of highlighted areas on plans attached.

Heading 11/07/2024SHEETROCKSPENCER SMITHCANCELLED11/7/2024 4:18:16 PM NOT READY.

Heading 11/08/2024SHEETROCKSPENCER SMITHPARTIAL11/8/2024 3:54:38 PM 1 WALL FOR MTG ROOM 1250A

Heading 11/12/2024SHEETROCKSPENCER SMITHPARTIALjack 650.315.049111/12/2024 3:19:02 PM SHEETROCK in level 1 men's and woman's restrooms.

Heading 11/12/2024ROUGH FRAMINGSPENCER SMITHPARTIAL11/12/2024 3:17:58 PM shaft wall in stair 3 vestibule, framing inspection for the doorway of Property Management room 1250

Heading 11/13/2024SHEETROCKSPENCER SMITHCANCELLED11/14/2024 7:46:34 AM NOT READY.

Heading 11/14/2024ROUGH FRAMINGSPENCER SMITHCANCELLEDeTRAKiT Inspection Request11/4/2024 12:33:04 PM 11/4/2024 12:33 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com 11/14/2024 4:47:52 PM NOT READY

Heading 11/15/2024ROUGH FRAMINGNICK GONZALESPARTIAL11 eTRAKiT Inspection Request11/4/2024 12:33:04 PM 11/4/2024 12:33 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com 11/18/2024 4:07:45 PM - Level 1 Stair 3 full height wall at doorway batt insulation OK see attached photo for highlighted referenced inspected area

Heading 11/18/2024ROUGH FRAMINGTINO PADILLAPARTIALeTRAKiT Inspection Request11/4/2024 12:33:04 PM 11/4/2024 12:33 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com 11/18/2024 3:39:04 PM Partial rough framing pending fire sprinkler inspection, rough framing partial for the fitness room.

Heading 11/19/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request11/4/2024 12:33:05 PM 11/4/2024 12:33 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com 11/19/2024 4:22:16 PM 1st layer sheetrock for hallway of gym room.

Heading 11/19/2024ROUGH FRAMINGSPENCER SMITHPARTIAL11/19/2024 4:24:20 PM FRAMING OF 1ST LEVEL EQUIPMENT ROOM AND SOFFET / HARDLID ON 6TH FLOOR ENTRANCE BEFORE ELEVATOR.

Heading 11/20/2024OTHERJONATHAN THOMASPARTIALeTRAKiT Inspection Request11/4/2024 12:33:05 PM 11/4/2024 12:33 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com 11/20/2024 2:38:33 PM Inspected 1st floor Fitness Room, Gridline 12,Vestibule at south side, Yoga Room ,for insulation, 1st and 2nd layer of drywall and electrical rough. Also inspected elevator vestibule ceiling at both ends, no middle, for rough of sprinkler, strobe and 2 lights at each end.

Heading 11/21/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request11/5/2024 12:26:52 PM 11/5/2024 12:26 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 11/21/2024 3:55:07 PM 2nd layer drywall inspection in the Fitness Center Vestibule.

Heading 11/22/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request11/5/2024 12:26:52 PM 11/5/2024 12:26 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 11/22/2024 2:40:55 PM SHHETROCK FOR OUTSIDE WALL OF YOGA STUDIO ROOM.

Heading 11/25/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request11/5/2024 12:26:52 PM 11/5/2024 12:26 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 11/25/2024 3:29:49 PM L1 Corridor Ceiling Sheetrock

Heading 11/26/2024INSULATIONSPENCER SMITHPARTIALeTRAKiT Inspection Request11/5/2024 12:26:53 PM 11/5/2024 12:26 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 11/26/2024 3:30:03 PM Insulation in yoga / gym room 1st level. and around top perimeter.

Heading 11/27/2024ROUGH MECHTINO PADILLACANCELLEDeTRAKiT Inspection Request11/5/2024 12:26:53 PM 11/5/2024 12:26 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com

Heading 12/05/2024DAILY INSPECTIONSPENCER SMITHPARTIAL12/5/2024 4:26:56 PM INSULATION, SHEETROCK, U/G ELECTRICAL. 12/5/2024 4:47:56 PM L1 Yoga room – 1st layer drywall on South, West, and East walls L1 Fitness Center – Insulation Inspection East wall L1 Fitness Center – 1st layer drywall south wall L2-L5 Stair 3 Shaft – Shaft Liner and Framing Northwest RPPA Conduits Northwest Site lighting Conduit

Heading 12/09/2024DAILY INSPECTIONSPENCER SMITHPARTIAL12/9/2024 4:04:03 PM 2ND LAYER IN FITNESS CENTER ROOM. ONSITE CURB AND GUTTER PRE POUR. 12/9/2024 4:50:35 PM Yoga Room exterior East wall – Final Layer Drywall Yoga Room East, South, West wall – Final Layer Drywall Fitness Center – East and south wall – Final Layer Drywall

Heading 12/10/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request12/2/2024 3:57:15 PM 12/2/2024 3:57 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 12/10/2024 3:21:39 PM 1. LEVELS 2 THROUGH 5, STAIR 3 SHAFT INSULATION. 2. LEVELS 2 THROUGH 5, DRYWALL SHEETRICK SCREW AT DRINKING FONTAINS. 3. LEVEL 1, ROUGH FRAME / OVER HEAD SOFFIT AT END OF PASSAGEWAY 1225. 12/10/2024 4:37:32 PM L2-L5 Stair 3 Shaft Insulation L2-L5 Final Layer drywall at drinking fountains L1 hallway ceiling shaft framing (partial inspected prior) Site Valley Gutter (B22-2206)

Heading 12/12/2024ROUGH FRAMINGJONATHAN THOMASPARTIAL1 eTRAKiT Inspection Request12/2/2024 3:59:42 PM 12/2/2024 3:59 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 12/12/2024 4:43:47 PM inspected insulation, sheetrock and screw, and u/g electrical. will attach pictures of inspected areas when email from Jack received.

Heading 12/13/2024ROUGH ELECTRICTINO PADILLACANCELLEDeTRAKiT Inspection Request12/2/2024 3:59:42 PM 12/2/2024 3:59 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com

Heading 12/16/20241-LAYER DRYWALLJONATHAN THOMASPARTIAL12:30 eTRAKiT Inspection Request12/2/2024 3:59:42 PM 12/2/2024 3:59 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 12/16/2024 3:23:26 PM highlit plans of area inspected attached.

Heading 12/17/2024DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request12/2/2024 3:59:42 PM 12/2/2024 3:59 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 12/17/2024 4:44:13 PM Fitness center South Wall – Insuation (B22-2731) Fitness Center South Wall – 2nd layer drywall (B22-2731)

Heading 12/18/2024SHEETROCKSPENCER SMITHPARTIALeTRAKiT Inspection Request12/2/2024 4:01:50 PM 12/2/2024 4:01 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 12/18/2024 4:13:19 PM Final layer drywall of outside of gym room.

Heading 12/23/2024ROUGH MECHSPENCER SMITHCANCELLEDeTRAKiT Inspection Request12/2/2024 4:01:51 PM 12/2/2024 4:01 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 12/23/2024 3:19:35 PM NOT READY.

Heading 12/26/2024DAILY INSPECTIONSPENCER SMITHPARTIALLUIS 650-722-101412/26/2024 3:58:38 PM OVER HEAD FRAMING / SOFFIT IN GYM / FITNESS ROOMS, 1ST LEVEL.

Heading 12/30/2024DAILY INSPECTIONSPENCER SMITHPARTIALLUIS 650-722-101412/30/2024 1:23:04 PM TOP OF SOFFIT SHEETROCK IN FITNESS ROOM. REBAR FORMS / FOOTINGS FOR SOUTH SIDE OF BUILDING .

Heading 01/02/2025DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request12/2/2024 4:01:51 PM 12/2/2024 4:01 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 1/2/2025 4:39:21 PM 1. OVER HEAD MEP'S IN FITNESS ROOM. 2. 90 PSI PRESSURE TEST OVER HEAD IN FITNESS ROOM. 3. FORM / FOOTINGS FOR LIGHT POLES AND UNDERGROUND ELECTRICAL CONDUIT. 4. CURB / GUTTER PRE-POUR. 1/3/2025 8:22:39 AM Yoga Room Overhead Rough in (B22-2731) Fitness center mechanical piping pressure test (B22-2731)

Heading 01/03/2025DAILY INSPECTIONSPENCER SMITHPARTIAL - VIRTUALeTRAKiT Inspection Request12/2/2024 4:03:32 PM 12/2/2024 4:03 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 1/3/2025 3:08:21 PM DUCT SUPPORT HANGERS IN YOGA ROOM. T-BAR FRAMING IN YOGA VESTABULE. STAIRWELL 3 SHEETROCK. 1/3/2025 4:02:14 PM Fitness Center Vestibule Framing and Overhead MEPF Rough in (B22-2731) Stair 3 Ceiling Screw Inspection (B22-2731) Vertiical Curbs between Garage and Building (B22-2206)

Heading 01/06/2025SHEETROCKSPENCER SMITHNOT READYeTRAKiT Inspection Request12/2/2024 4:03:33 PM 12/2/2024 4:03 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com

Heading 01/07/2025SLABDAVID COOKSAPPROVEDeTRAKiT Inspection Request12/2/2024 4:03:33 PM 12/2/2024 4:03 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 1/7/2025 4:56:25 PM Traffic rated concrete reinforcement - at loading dock

Heading 01/08/2025DAILY INSPECTIONSPENCER SMITHPARTIALeTRAKiT Inspection Request12/2/2024 4:03:33 PM 12/2/2024 4:03 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 1/8/2025 3:45:54 PM CONSULTATION OF BATHROOM WALKTHROUGHS. ADA REQUIREMENTS.

Heading 01/09/2025U/G ELECTRICSPENCER SMITHPARTIALeTRAKiT Inspection Request12/2/2024 4:03:33 PM 12/2/2024 4:03 PM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 1/9/2025 3:50:22 PM 1. PATIO FLOOR BOX U/G ELECTRICAL 2. SITE LIGHTING U/G ELECTRICAL 3. CARD READER U/G ELECTRICAL 4. MONUMENT SIGN U/G ELECTRICAL

Heading 01/21/2025CONCRETE WALLDAVID COOKSAPPROVEDeTRAKiT Inspection Request12/30/2024 11:28:50 AM 12/30/2024 11:28 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 1/21/2025 4:42:27 PM W2 two retaining stair wall reinforcement steel rebar check and 3 light pole caissons with rebar cages and electrical conduit runs

Heading 01/21/2025PIERS /CAISSONDAVID COOKSCORRECTIONS1/21/2025 4:47:51 PM Corrections: 2 light bollard cessions inspected - dug out footing and cessions did not match the description layout on the plans

Heading 01/24/2025ROUGH ELECTRICDAVID COOKSNOT READYeTRAKiT Inspection Request12/30/2024 11:43:03 AM 12/30/2024 11:43 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com

Heading 01/29/2025SIDEWALKTHOMAS SILIPIN JRAPPROVED9-1112/30/2024 11:43:03 AM 12/30/2024 11:43 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 1/29/2025 1:01:01 PM Walk ways only. Partial area. In progress

Heading 01/31/2025SIDEWALKSPENCER SMITHCANCELLEDeTRAKiT Inspection Request12/30/2024 11:43:04 AM 12/30/2024 11:43 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 1/31/2025 11:15:44 AM Cancelled due to rain.

Heading 01/31/2025U/G ELECTRICSPENCER SMITHCANCELLEDeTRAKiT Inspection Request1/3/2025 11:13:53 AM 1/3/2025 11:13 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 1/31/2025 11:14:57 AM Cancelled due to rain

Heading 02/03/2025SLABSPENCER SMITHCANCELLEDeTRAKiT Inspection Request1/3/2025 11:13:54 AM 1/3/2025 11:13 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 2/3/2025 10:25:26 AM Not ready.

Heading 02/04/2025FORMS/FOOTINGSPENCER SMITHCANCELLEDeTRAKiT Inspection Request1/3/2025 11:13:54 AM 1/3/2025 11:13 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 2/4/2025 12:29:18 PM Cancelled due to rain

Heading 02/05/2025ROUGH PLMGTHOMAS SILIPIN JRCANCELLED9-111/3/2025 11:13:54 AM 1/3/2025 11:13 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com

Heading 02/06/2025T-BAR BLDGTINO PADILLA(AE) APPROVED W/EXCEeTRAKiT Inspection Request1/3/2025 11:13:54 AM 1/3/2025 11:13 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com 2/6/2025 4:39:40 PM T-BAR Overhead Approved with exception pending Fire sign off. T-BAR Mechanical Approved with exception pending Fire sign off. T-BAR Electrical Approved with exception pending Fire sign off. T-BAR Plumbing Approved with exception pending Fire sign off.

Heading 02/07/2025SIDEWALKTINO PADILLACANCELLEDeTRAKiT Inspection Request1/3/2025 11:13:55 AM 1/3/2025 11:13 AM Mike Chae Contact Name: Jack Stryker Site Address: 200 TWIN DOLPHIN DR Phone: 6503150491 e-Mail: jack.stryker@truebeck.com

Heading 02/21/2025ROUGH FRAMINGJONATHAN THOMASCANCELLED9 eTRAKiT Inspection Request2/4/2025 12:31:05 PM 2/4/2025 12:31 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com

Heading 02/24/2025ROUGH MECHJONATHAN THOMASCANCELLED1 eTRAKiT Inspection Request2/4/2025 12:31:05 PM 2/4/2025 12:31 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com

Heading 02/25/2025ROUGH PLMGTINO PADILLACANCELLEDeTRAKiT Inspection Request2/4/2025 12:31:06 PM 2/4/2025 12:31 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com

Heading 02/26/2025U/G ELECTRICTINO PADILLACANCELLEDeTRAKiT Inspection Request2/4/2025 12:31:06 PM 2/4/2025 12:31 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com

Heading 02/27/2025CURBTINO PADILLACANCELLEDeTRAKiT Inspection Request2/4/2025 12:31:06 PM 2/4/2025 12:31 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com

Heading 03/06/2025**FINAL PLUMBINGSPENCER SMITHCANCELLEDeTRAKiT Inspection Request2/19/2025 4:04:50 PM 2/19/2025 4:04 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 03/06/2025CURBSPENCER SMITHPARTIALeTRAKiT Inspection Request2/19/2025 3:10:52 PM 2/19/2025 3:10 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: Luis.elias@truebeck.com

Heading 03/07/2025**FINAL FIREJONATHAN THOMASCANCELLEDeTRAKiT Inspection Request2/19/2025 4:04:51 PM 2/19/2025 4:04 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com

Heading 03/10/2025CONSULTATIONSPENCER SMITHPERFORMEDeTRAKiT Inspection Request2/19/2025 4:04:51 PM 2/19/2025 4:04 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/10/2025 11:08:58 AM Starting checklist for final trade, walk-throughs. Will be scheduling plumbing final tomorrow, mechanical for Wednesday and electrical for Thursday. Potential egress for Friday. Fire final also scheduled for Friday. They are going for building final for next Tuesday 3/18.

Heading 03/10/2025FIRE MISCELLANEOUSSTEPHEN SHUGARTCORRECTIONSEmergency Lighting3/10/2025 2:12:07 PM - Emergency lighting Main Building, emergency power transferred at 4 seconds, all corridors light, all stairwells light, all electrical/FACP/infrastructure rooms light, bathrooms light (excluded single use bathrooms), exterior lights on, terrace lights on upper floor, exit signs per plans, some minor corrections addressed at inspection, all fire extinguishers tagged and placed appeared to be sufficient - Emergency lighting Garage, emergency power transferred at 4 seconds, elevator lobby and south stairwell light, parking structure lighting per plans **Corrections** 1. Main Electrical Room no emergency lighting 2. ERRCS no emergency lighting 3. Fire pump room no emergency lighting 4. First floor North exit sign on emergency circuit not on 5. All exit signs in elevator lobby not working 6. Missing exit sign on the 5th floor from parking structure to elevator lobby/stairwell 3/10/2025 2:14:36 PM Main Building fire extinguishers were serviced, tagged and placed appropriately, Knox Keys and Fobs in Knox Box Garage Fire extinguishers tagged, but some missing the tent identifier just above the FE box 3/24/2025 11:51:46 AM Mark Laine Verified emergency lighting @ ERRCS Final and all corrections verified 3/24/2025 11:53:07 AM - Verified Generator and Life Safety, fire final pending completion of all outstanding fire protection systems

Heading 03/11/2025**FINAL PLUMBINGSPENCER SMITHPARTIALeTRAKiT Inspection Request2/19/2025 4:04:51 PM 2/19/2025 4:04 PM Mike Chae Contact Name: Luis Elias Site Address: 200 TWIN DOLPHIN DR Phone: 6507221014 e-Mail: luis.elias@truebeck.com 3/11/2025 3:46:41 PM Plumbing inside building approved 3/13/2025 2:20:29 PM Plumbing final complete

Heading 03/12/2025OTHERSPENCER SMITHCORRECTIONSJohn 510-358-77523/12/2025 3:38:31 PM Egress final pending, 1. Handrails in stair shafts to terminate back into walls, both top and bottom upstairs. 2. Both lobby entrances front and back need to close not less than seven seconds. And automatic door opener to open door, not less than 20 seconds. 3/13/2025 8:41:07 AM HANDRAILS FOR STAIRS ARE FOR STAIR 1 AND 2, LEVELS 1-6 AND STAIR 3, LEVELS 1-5.

Heading 03/13/2025**FINAL ELECTRICALSPENCER SMITHCORRECTIONSJohn 510-358-77523/13/2025 2:12:04 PM Full electrical walk will be tomorrow 3/14. Found electrical correction during mechanical final walk-through. Electrical final pending disconnects for A/C units, 25 Amp or not less than 5 Amp then max fuse amps.

Heading 03/13/2025**FINAL MECHANICALSPENCER SMITHPARTIAL3/13/2025 2:19:20 PM Mechanical final complete

Heading 03/13/2025OTHERSPENCER SMITHPARTIAL3/13/2025 2:20:02 PM Egress final complete 3/18/2025 12:20:49 PM Egress final not complete. Igor final pending exit doors on north and west sides of building to comply with open and closing minimums

Heading 03/14/2025**FINAL ELECTRICALTINO PADILLAPARTIALJohn 510-358-77523/14/2025 3:57:04 PM Partial disconnects were installed at condensers, fuse were replace, final pending Fire final sign off, Engineering sign off, and Planning final.

Heading 03/17/2025**FINAL ELECTRICALSPENCER SMITHCORRECTIONS3/17/2025 7:05:05 PM 1. Multiple panels are locked, can’t access inside for verification. 2. Mc flex line touching copper pipes. Need to be separated with electrical or plumbing tape or properly supported to separate materials.

Heading 03/18/2025**FINAL BLDGSPENCER SMITHPARTIAL3/20/2025 7:52:23 AM BUILDING FINAL PENDING FINAL APPROVALS FROM ENGINEERING, PLANNING AND FIRE.

Heading 03/18/2025**FINAL ELECTRICALSPENCER SMITHPARTIAL3/18/2025 12:18:48 PM Electrical final complete. Last final pending is egress final for main building.

Heading 03/18/2025OTHERSPENCER SMITHCORRECTIONS3/18/2025 12:21:57 PM Egress doors on North and West side of building to comply with open and closing minimums

Heading 03/18/2025OTHERSPENCER SMITHAPPROVED3/20/2025 7:53:30 AM EGRESS FINAL APPROVED.

Heading 04/11/2025**FINAL BLDGSPENCER SMITHAPPROVED

Heading 04/11/2025CERT OF OCCUPANCYSPENCER SMITHCANCELLED4/11/2025 2:08:13 PM CERTIFICATE OF OCCUPANY IN ATTACHMENTS AND IN FOLDER. 4/16/2025 4:24:16 PM Retracting the certificate of occupancy due to there being no occupant for 200 Twin Dolphin yet. Notified contractors from Truebeck through email.

HeadingCERT OF OCCUPANCYSPENCER SMITHAPPROVED6/12/2025 1:59:13 PM 6-12-25 certificate of occupancy has been issued to owners of 200 Twin Dolphin. Occupants are owners 200-240 Twin Dolphin, LLC. Document of occupancy and Certificate of occupancy are in attachments.