Heading | 10/20/2021 | Expiration Postcard | HENRY CALILONG | PERFORMED | Auto | 10/20/2021 12:00:00 AM
Emailed property owner/ contractor/ architect.
(10/20/2021 8:32 AM HC)
Good Morning,
My name is Henry Calilong, with the Redwood City Building department, this is a courtesy notification, to let you that your permit will expire soon, please call in for an inspection when work is ready, there must be an inspection activity on your permit, within 6 months of permit issuance, otherwise, it’s considered abandoned null and void.
Kind regards,
Henry Calilong
650-465-6808 Cell.
|
|
Heading | 03/12/2025 | FORMS/FOOTING | SPENCER SMITH | CANCELLED | Nancy 650-722-2667 | 3/12/2025 3:35:54 PM
Called twice, left voicemails. Showed up to site around 9 AM, no one on site
|
|
Heading | 03/13/2025 | FORMS/FOOTING | SPENCER SMITH | APPROVED | | |
|
Heading | 03/13/2025 | OTHER | SPENCER SMITH | CORRECTIONS | | 3/13/2025 4:38:50 PM
APPROVED PLANS TO BE PRINTED OUT FOR NEXT INSPECTION.
|
|
Heading | 05/16/2025 | ROUGH ELECTRIC | DAVID COOKS | NOT READY | Cynthia 650-743-7152 | |
|
Heading | 05/16/2025 | ROUGH FRAMING | DAVID COOKS | CORRECTIONS | Cynthia 650-743-7152 | 5/16/2025 4:58:37 PM
Corrections:
1. Interior shear wall B extend to roof line
2. Shear wall B at the entry left side - extend thru the attic to the ceiling
3. Add A35 clips per plan to tie-in blocking at the top plate to all shear wall
4. Add SDS screws as per plan at bottom plate line to shear walls.
5. MST 24 tie-in straps missing , to tie-in existing structure to the new as per plan - install before outer building moister barrier wrap - plan call out in 3 areas.
6. Cut out openings for the roof drains on the flat roof section. 2 ea
|
|
Heading | 05/16/2025 | ROUGH MECH | DAVID COOKS | NOT READY | Cynthia 650-743-7152 | |
|
Heading | 05/16/2025 | ROUGH PLMG | DAVID COOKS | NOT READY | Cynthia 650-743-7152 | |
|
Heading | 07/02/2025 | ELECT SERVICE | SPENCER SMITH | CORRECTIONS | | 7/2/2025 3:00:29 PM
200 amp main disconnect to be connected for electrical service tag. Main breaker wasn’t connected and loose wires in panel. Ground and neutral wires to be separated on two bus bars
|
|
Heading | 07/02/2025 | EXTERIOR LATH /WIRE | SPENCER SMITH | CORRECTIONS | | 7/2/2025 2:58:42 PM
Exterior lath/wire pending installment in front of house roof/gable and right side of house front window
|
|
Heading | 07/02/2025 | EXTERIOR SHEAR | SPENCER SMITH | APPROVED | | |
|
Heading | 07/02/2025 | INTERIOR SHEAR | SPENCER SMITH | APPROVED | | |
|
Heading | 07/02/2025 | ROOF NAIL | SPENCER SMITH | APPROVED | | |
|
Heading | 07/02/2025 | ROUGH ELECTRIC | SPENCER SMITH | CORRECTIONS | Cynthia 650-743-7152 | 7/2/2025 2:52:52 PM
Smoke alarm boxes to be installed and hardwired. One per bedroom and one outside vicinity of a bedrooms in hallway, electrical metal boxes for fans need to be grounded.
|
|
Heading | 07/02/2025 | ROUGH FRAMING | SPENCER SMITH | CORRECTIONS | | 7/2/2025 2:55:25 PM
rough framing pending MEP approval and all top plate penetrations to be sealed with fire foam or caulking
|
|
Heading | 07/02/2025 | ROUGH MECH | SPENCER SMITH | CORRECTIONS | | 7/2/2025 2:54:15 PM
HVAC ducts to be installed under floor for rough mechanical inspection
|
|
Heading | 07/02/2025 | ROUGH PLMG | SPENCER SMITH | CORRECTIONS | | 7/2/2025 2:51:21 PM
Hot water lines to be insulated
|
|
Heading | 07/02/2025 | SHOWER PAN | SPENCER SMITH | APPROVED | | |
|